Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Mitsubishi Electric In Stock OK

Mitsubishi FR-CV-H30K Regenerative Converter

Request verified availability, condition, replacement risk review, packing options and courier lead time for FR-CV-H30K.

Exact partFR-CV-H30K RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandMitsubishi Electric Part NumberFR-CV-H30K ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ FR-CV-H30K

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Mitsubishi Electric
Primary Part Number
FR-CV-H30K
Product Type
Regenerative Converter
Series / Family
FR-CV Series
Manufacturer
Mitsubishi Electric Corporation
Country of Origin
JP
Catalog Category
Motor Drives
Operating Temp.
-10°C to +50°C, non-condensing
Model confirmed for inquiry FR-CV-H30K Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

Mitsubishi FR-CV-H30K 30kW Regenerative Converter: A Procurement Officer’s Sourcing Playbook

When a plant engineer submits a requisition for the Mitsubishi FR-CV-H30K, the procurement team faces a decision that extends well beyond unit price. This 30kW power factor correction converter sits at the intersection of energy recovery technology and mission-critical uptime — two variables that carry outsized weight in any total cost of ownership calculation. The FR-CV-H30K is not a commodity relay or a passive component that can be substituted freely; it is a precision-engineered regenerative front-end unit designed to operate in matched configuration with Mitsubishi’s FR-A800 and FR-F800 inverter families. That specificity defines the sourcing strategy.

At siemensplc.com, we maintain dedicated stock of the FR-CV-H30K to serve B2B buyers across manufacturing, infrastructure, and heavy industry. Our position as a specialist third-party supplier — rather than a generalist distributor — means we carry depth on high-demand automation components and maintain active sourcing channels for units with constrained OEM availability. Whether your facility runs a predictive maintenance cycle or faces an unplanned breakdown, our team can confirm stock status and lead time within one business day.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Specification
Model / SKU FR-CV-H30K
Series FR-CV (Power Factor Correction Converter)
Rated Motor Capacity 30 kW
Input Voltage 3-Phase 380–480V AC, 50/60 Hz
DC Bus Output Voltage Approx. 537–680V DC
Input Power Factor ≥ 0.99 at rated load
Current THD ≤ 5% (with recommended AC reactor)
Cooling Method Forced air (internal fan)
Enclosure Rating IP20
Operating Temperature -10°C to +50°C, non-condensing
Storage Temperature -20°C to +65°C
Approx. Weight 4.8 kg
Compatible Inverters FR-A800 Series, FR-F800 Series
Certifications CE (LVD + EMC), UL/cUL, RoHS, IEC 61800-3, IEC 61800-5-1
Country of Origin Japan
Manufacturer Mitsubishi Electric Corporation
Typical Lead Time (Stock) 3–7 business days (air freight, door-to-door)
Lead Time (Non-Stock) 15–35 business days depending on OEM availability; expedited sourcing available on request

Lead time estimates are provided at the time of quotation and reflect current inventory position. Buyers managing scheduled maintenance windows are advised to confirm availability 4–6 weeks in advance to avoid premium freight costs.

Total Cost of Ownership (TCO) Analysis

Procurement decisions evaluated on purchase price alone routinely underestimate the true financial exposure of industrial drive components. For the FR-CV-H30K, a structured TCO framework reveals why sourcing from a reliable specialist supplier like siemensplc.com delivers measurable returns across the asset lifecycle.

Downtime Cost Avoidance
In continuous-process industries — steel rolling, paper manufacturing, chemical processing — unplanned drive system downtime carries an hourly cost that can range from tens of thousands to hundreds of thousands of dollars depending on line throughput. The FR-CV-H30K, as the regenerative front-end of a matched drive system, is not a component that can be bypassed or substituted with a temporary workaround. When it fails, the inverter it feeds goes offline. Maintaining a spare unit or securing a supplier with confirmed stock eliminates the most expensive variable in the downtime equation: sourcing delay. A 48-hour sourcing delay at a facility running $50,000/hour in throughput represents $2.4M in exposure — a figure that dwarfs the cost of the unit itself many times over.

Energy Recovery and OPEX Reduction
The FR-CV-H30K’s core function — returning regenerative braking energy to the AC supply grid rather than dissipating it as heat through resistors — directly reduces electricity consumption. In crane, hoist, and elevator applications operating multiple cycles per hour, measured energy savings of 20–30% on the drive system are achievable. For a facility running a 30kW drive system at 70% utilization across two shifts, the annual energy recovery can offset a meaningful portion of the unit’s acquisition cost within the first year of operation. This is OPEX reduction that compounds annually across the asset’s service life.

Harmonic Penalty Elimination
High THD at the supply side triggers utility penalty charges in many jurisdictions and accelerates degradation of sensitive equipment sharing the same electrical bus. The FR-CV-H30K’s ≤5% THD performance eliminates the need for external harmonic filters in most standard installations, removing both the capital cost of filter hardware and the ongoing maintenance burden associated with passive filter components.

12-Month Quality Warranty
Every FR-CV-H30K supplied through siemensplc.com carries a 12-month warranty covering manufacturing defects and functional failure under normal operating conditions. This warranty period aligns with standard annual maintenance cycles, ensuring that procurement teams can close the fiscal year without residual liability on drive system components. Warranty claims are handled directly through our technical team, with replacement units dispatched from Xiamen on a priority basis.

CAPEX Optimization Through Third-Party Sourcing
OEM-direct procurement channels for Mitsubishi automation components frequently carry list-price premiums, extended lead times tied to regional distributor inventory cycles, and minimum order value requirements that create cash flow friction for project-based buyers. Sourcing through siemensplc.com provides access to competitive pricing on genuine units without the structural overhead of OEM distribution agreements. For procurement teams managing capital budgets across multiple projects, the per-unit savings on high-value automation components translate directly into budget headroom for other line items.

Quality & Compliance Assurance

Every unit shipped from siemensplc.com is subject to a multi-point verification process before dispatch:

  • 100% Genuine Product Guarantee: We source exclusively through verified industrial supply channels. Counterfeit or refurbished units are not accepted into our inventory under any circumstances. Documentation of provenance is available upon request for quality-sensitive procurement processes.
  • Xiamen Customs Compliance: All international shipments are processed through Xiamen Customs with full commercial invoice, packing list, and certificate of origin documentation. HS code classification is handled by our in-house trade compliance team, ensuring accurate duty assessment and minimizing the risk of customs delays at destination ports.
  • Multi-Currency Payment Support: We accept payment in USD, EUR, HKD, CNY, and other major currencies via T/T bank transfer, PayPal, and trade finance instruments including LC (Letter of Credit) for qualified buyers. Currency flexibility reduces FX conversion friction for international procurement teams.
  • Pre-Shipment Inspection: Visual authenticity checks, label verification, and packaging integrity inspection are conducted on every unit prior to dispatch. Inspection reports are available on request.

Strategic Sourcing from Xiamen

Xiamen occupies a structurally advantageous position in the global industrial components supply chain. As a designated free trade zone port city on China’s southeastern coast, Xiamen offers direct access to major international shipping lanes serving Southeast Asia, the Middle East, Europe, and the Americas. For time-sensitive industrial procurement, this geography matters.

Air freight from Xiamen Gaoqi International Airport reaches most major industrial hubs within 3–5 business days: Singapore in under 4 hours flight time, Dubai in approximately 9 hours, Frankfurt in 11 hours, and Los Angeles in 13 hours. Sea freight options via Xiamen Port provide cost-effective routing for bulk orders or non-urgent replenishment stock. Our logistics team selects the optimal carrier and routing based on the buyer’s delivery deadline and freight budget, with real-time tracking provided from dispatch to delivery.

The Xiamen free trade zone framework also enables streamlined export documentation processing, reducing the administrative lead time between order confirmation and physical dispatch. For procurement teams operating under project milestone deadlines, this operational efficiency translates directly into schedule reliability.

Contact Information

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.