Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
GE In Stock OK

GE 8717-CA-PS Power Supply Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for 8717-CA-PS.

Exact part8717-CA-PS RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Part Number8717-CA-PS ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 8717-CA-PS

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE
Primary Part Number
8717-CA-PS
Product Type
Power Supply Module
Series / Family
Mark VI
Manufacturer
GE (General Electric)
Country of Origin
US
Catalog Category
Power Supplies
Operating Temp.
0°C to +60°C
Warranty
12 months from shipment date
Model confirmed for inquiry 8717-CA-PS Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE 8717-CA-PS: Procurement Strategy for Mission-Critical Turbine Control Power Infrastructure

For procurement managers and reliability engineers operating gas turbine or combined-cycle power plants, the GE 8717-CA-PS represents one of the most consequential line items in a Mark VIe control system BOM. This is not a commodity component — it is the regulated DC backbone that keeps every I/O module, communication backplane, and safety interlock in your turbine control cabinet alive. A single failure cascades into unplanned outages measured in hours, not minutes. The sourcing decision you make today directly determines your plant’s exposure to that risk tomorrow.

At siemensplc.com, we approach the 8717-CA-PS not as a catalog item but as a supply chain obligation. Our Xiamen-based procurement team maintains verified stock positions across multiple authorized distribution channels, enabling us to fulfill both spot orders and scheduled blanket POs with the traceability documentation your compliance team requires. Whether you are building a critical-spare inventory program or responding to an emergency breakdown, our sourcing infrastructure is structured to meet your timeline.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Part Number 8717-CA-PS
Manufacturer GE (General Electric)
Control Series Mark VIe Turbine Control System
Module Function Regulated DC Power Supply for I/O & Backplane
Input Voltage AC 120V / 240V (auto-ranging)
Output Voltage 24VDC regulated
Form Factor CA-series carrier board, DIN-rail / panel mount
Operating Temperature 0°C to +60°C
Protection Rating IP20
Compliance Standards UL, CE, IEC 61010
Country of Origin United States
Unit Weight Approx. 200 g
Warranty 12 months from shipment date
Lead Time (In Stock) Ships within 2–3 business days from Xiamen
Lead Time (Sourced) 3–8 weeks depending on global availability
Minimum Order Quantity 1 unit (wholesale pricing available from 3 units)
Export Documentation Commercial invoice, packing list, HS code declaration, CoC

All specifications are reference values derived from GE Mark VIe engineering documentation. Contact us for certified datasheet confirmation prior to procurement.

Total Cost of Ownership (TCO) Analysis

Procurement teams evaluating the 8717-CA-PS often focus on unit price as the primary decision variable. This is a structural error. The true cost of this component must be calculated across four dimensions: acquisition cost, downtime exposure, maintenance labor, and warranty coverage — and when you run that calculation honestly, the case for sourcing from a verified specialist supplier becomes straightforward.

Downtime Risk Quantification: A Mark VIe power supply failure in a gas turbine application typically triggers a forced outage. For a 200MW combined-cycle unit, each hour of unplanned downtime carries a direct generation loss in the range of USD 8,000–20,000 depending on dispatch price and capacity factor. If your maintenance team cannot source a replacement unit within 24 hours — a realistic scenario when relying on OEM lead times of 6–12 weeks — the financial exposure from a single event can exceed the cost of maintaining a full critical-spare inventory for three years. The math is not subtle.

CAPEX Reduction Through Verified Spare Inventory: Rather than purchasing spares through OEM channels at full list price with extended lead times, procurement teams working with siemensplc.com can build a cost-optimized spare parts program. We offer volume pricing structures that reduce per-unit acquisition cost by 15–30% compared to standard distributor pricing, without compromising on authenticity or documentation. That delta, applied across a multi-unit spare program, represents meaningful CAPEX savings that can be reallocated to other reliability initiatives.

OPEX Impact of the 12-Month Warranty: Every unit shipped from siemensplc.com carries a 12-month warranty covering manufacturing defects and functional failure under normal operating conditions. For your maintenance accounting team, this translates directly into reduced OPEX exposure: warranty replacements are handled at no additional cost, eliminating the unbudgeted repair or re-procurement events that distort maintenance cost tracking. Over a three-year asset lifecycle, the cumulative OPEX benefit of warranty coverage on a critical-spare program is measurable and documentable for internal cost justification.

Labor Cost Avoidance: Emergency sourcing events consume disproportionate engineering and procurement labor. When a plant engineer spends 40 hours chasing a single obsolete part number across multiple distributors, the fully-loaded labor cost of that search often exceeds the component value. Our dedicated sourcing team absorbs that burden, delivering a confirmed availability response within 24 hours and a firm delivery commitment within 48 hours — freeing your team to focus on plant operations rather than supply chain firefighting.

Quality & Compliance Assurance

Every GE 8717-CA-PS unit supplied by siemensplc.com undergoes a structured verification process before it reaches your facility. We do not list components we cannot authenticate, and we do not ship units that have not passed incoming inspection.

  • 100% Genuine Parts Commitment: All units are sourced from authorized GE distributors or verified secondary market channels with full chain-of-custody documentation. Counterfeit components are a documented risk in the industrial automation aftermarket; our inspection protocol — including holographic label verification, serial number cross-referencing, and OEM packaging integrity checks — is designed to eliminate that exposure before it reaches your plant.
  • Xiamen Customs Compliance: All international shipments are processed through Xiamen Customs with accurate HS code declarations, commercial invoices, and Certificate of Conformance documentation. Our export compliance team ensures that every shipment meets the import requirements of the destination country, reducing the risk of customs delays that could extend your downtime window.
  • Multi-Currency Payment Support: We accept payment in USD, HKD, CNY, and EUR via T/T bank transfer, PayPal, and major credit cards. For corporate procurement teams operating under multi-currency treasury policies, this flexibility eliminates the FX conversion friction that complicates cross-border industrial procurement.
  • Documentation Package: Standard shipment documentation includes packing list, Certificate of Conformance, functional test report, and export declaration. Extended documentation — including material traceability reports and third-party inspection certificates — is available upon request for projects with elevated compliance requirements.

Strategic Sourcing from Xiamen

Xiamen occupies a structurally advantageous position in the global industrial components supply chain. As one of China’s five Special Economic Zones and a designated free-trade port, Xiamen offers direct access to both domestic manufacturing supply chains and international logistics networks — a combination that translates into tangible lead time and cost advantages for buyers sourcing industrial automation components.

Our warehouse and logistics operations are based in Xiamen, with direct access to Xiamen Gaoqi International Airport for air freight and Xiamen Port for sea freight consolidation. This dual-mode capability allows us to optimize shipping method based on urgency and order volume: emergency replacement units can be dispatched via air freight with DHL, FedEx, or UPS for delivery within 3–5 business days to most global destinations; standard orders can be consolidated into sea freight shipments for cost-optimized delivery on longer planning horizons.

For buyers in Southeast Asia, the Middle East, and Europe — regions with significant installed bases of GE Mark VIe turbine control systems — Xiamen’s geographic position and port infrastructure provide a meaningful logistics advantage over sourcing from North American or European distribution centers. Transit times are competitive, customs documentation is handled in-house, and our team operates across multiple time zones to ensure responsive communication regardless of your location.

Contact Information

To request a formal quotation, confirm stock availability, or discuss a critical-spare inventory program for your facility, contact our procurement team directly:

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.