Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
GE In Stock OK

GE DS200SLCCG1ACC Communication Card

Request verified availability, condition, replacement risk review, packing options and courier lead time for DS200SLCCG1ACC.

Exact partDS200SLCCG1ACC RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Part NumberDS200SLCCG1ACC ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ DS200SLCCG1ACC

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE
Primary Part Number
DS200SLCCG1ACC
Product Type
Communication Card
Series / Family
Mark VI
Manufacturer
GE (General Electric)
Country of Origin
US
Catalog Category
Communication
Warranty
12 months from date of shipment (new units); 6 months (certified refurbished)
Model confirmed for inquiry DS200SLCCG1ACC Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE DS200SLCCG1ACC – Mark VI Communication Card: Procurement Strategy & Supply Chain Stability

The GE DS200SLCCG1ACC is the Serial Link Communication Controller Card (SLCC) embedded within GE’s Mark VI Turbine Control System. Its function is not peripheral — it is the arbitration layer that manages deterministic serial data exchange between the Mark VI I/O controller and downstream devices including HMIs, distributed I/O racks, and SCADA gateways. When this card fails, the entire communication fabric of the turbine control loop collapses. For procurement managers and plant engineers, understanding the sourcing landscape for this part is as operationally critical as the card itself.

The DS200SLCCG1ACC is classified as a moderate-scarcity industrial component. GE’s Mark VI platform, while still widely deployed across gas turbine fleets globally (Frame 5, 6B, 7EA, 9E series), has been progressively superseded by the Mark VIe architecture. This transition has reduced OEM channel availability of DS200-series cards while field demand from operating plants remains steady. The result: procurement teams that rely solely on OEM channels face extended lead times and premium pricing. A qualified third-party specialist with verified stock — such as siemensplc.com — provides a structurally superior sourcing path for both planned maintenance and emergency replacement scenarios.

Real-time Stock & RFQ: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Part Number DS200SLCCG1ACC
Manufacturer GE (General Electric)
Series DS200 / Mark VI Turbine Control
Module Function Serial Link Communication Controller Card (SLCC)
Communication Interfaces RS-232, RS-485 serial; system-level Ethernet via backplane
Compatible Platform GE Mark VI (primary); Mark VIe with engineering review
Hardware Revision ACC (verify label on installed card before ordering)
Form Factor PCB card module, DS200 backplane slot (SLCC position)
Operating Environment Industrial turbine control enclosure; continuous duty rated
Weight 440 g
Condition Available New OEM surplus / Certified refurbished
Standard Lead Time In-stock units: 3–5 business days ex-Xiamen; non-stock: 7–15 business days subject to global sourcing
Warranty 12 months from date of shipment (new units); 6 months (certified refurbished)
Export Documentation Commercial invoice, packing list, certificate of conformance, Xiamen customs declaration

Total Cost of Ownership (TCO) Analysis

Procurement decisions for industrial control components are rarely evaluated on unit price alone. The DS200SLCCG1ACC, as a communication backbone card, carries a disproportionate impact on plant availability relative to its acquisition cost. A structured TCO framework reveals why sourcing strategy matters as much as price negotiation.

Downtime Cost Exposure: A failed DS200SLCCG1ACC in an operating gas turbine plant results in a complete loss of controller-to-HMI and controller-to-I/O communication. Depending on the turbine’s role in the generation fleet, unplanned outage costs range from USD 15,000 to USD 150,000 per day in lost generation revenue, plus regulatory penalties in grid-connected facilities. A 10-day OEM lead time versus a 3-day specialist lead time represents a measurable, quantifiable cost differential that dwarfs the price premium of any sourcing channel.

CAPEX Reduction via Certified Refurbished Units: For plants operating Mark VI systems in the final 5–8 years of their service life, capital expenditure on new OEM cards is difficult to justify. Certified refurbished DS200SLCCG1ACC units — bench-tested, cleaned, and re-certified — deliver equivalent functional performance at 40–60% of new OEM pricing. This directly reduces the CAPEX line for spare parts inventory without compromising operational reliability.

OPEX Reduction via 12-Month Warranty Coverage: The 12-month warranty provided by siemensplc.com on new units eliminates the cost of repeat procurement within the warranty window. For maintenance budgets operating under fixed OPEX targets, this warranty structure converts an unpredictable failure cost into a managed, bounded risk. Combined with documented inspection records and traceability, this also satisfies internal audit requirements for maintenance expenditure justification.

Inventory Carrying Cost Optimization: Holding a DS200SLCCG1ACC as a cold spare in your MRO inventory ties up capital. Partnering with a specialist supplier that maintains verified stock allows plants to operate on a just-in-time basis for non-critical spares, reducing warehouse carrying costs while maintaining access to rapid dispatch when needed.

Quality & Compliance Assurance

Every DS200SLCCG1ACC unit supplied by siemensplc.com is subject to a documented quality process before dispatch:

  • 100% Genuine Parts Commitment: All units are sourced from verified OEM surplus channels or certified refurbishment facilities. Part markings, revision codes, and board silkscreen are cross-referenced against GE OEM documentation. No counterfeit or grey-market units are accepted into inventory.
  • Physical Inspection: Full board-level visual inspection covering component condition, connector pin integrity, PCB trace condition, and absence of thermal damage or corrosion.
  • Functional Bench Testing: Refurbished units are tested against known-good reference systems to verify communication protocol operation prior to shipment.
  • Xiamen Customs Compliance: All export shipments are processed through Xiamen Customs with full commercial documentation — commercial invoice, packing list, HS code classification, and certificate of conformance. Export compliance is maintained in accordance with Chinese customs regulations and international trade law.
  • Multi-Currency Payment Support: Transactions are supported in USD, EUR, CNY, HKD, and other major currencies. Payment methods include T/T bank transfer, L/C, and negotiated terms for qualified corporate buyers.
  • ESD-Safe Packaging: All cards are shipped in anti-static bags with foam cushioning inside rigid outer packaging, rated for international air and sea freight handling.

Strategic Sourcing from Xiamen

Xiamen, located on China’s southeastern coast in Fujian Province, is one of the country’s designated Special Economic Zones and a major international logistics hub. For industrial component procurement, Xiamen’s infrastructure provides concrete operational advantages:

  • Xiamen Gaoqi International Airport (XMN): Direct cargo routes to major hubs including Hong Kong, Singapore, Dubai, Frankfurt, and Los Angeles. Air freight to most destinations in Asia-Pacific within 24–48 hours; Europe and North America within 72–96 hours.
  • Xiamen Port: One of China’s top-10 container ports by throughput, with established FCL and LCL sea freight services to all major global ports. Suitable for bulk spare parts orders where air freight cost is prohibitive.
  • Customs Processing Efficiency: Xiamen’s customs authority has implemented electronic pre-clearance for regular exporters, reducing average export processing time. siemensplc.com maintains established customs relationships that support expedited documentation processing.
  • Freight Forwarder Network: Direct relationships with DHL, FedEx, UPS, and regional freight forwarders enable flexible shipping options — express courier for urgent single-unit replacements, consolidated freight for planned MRO orders.
  • Time Zone Advantage: Xiamen operates in CST (UTC+8), enabling same-business-day order processing for inquiries received from Europe (morning hours) and Asia-Pacific, with next-business-day processing for Americas-based buyers.
  • Export Documentation Turnaround: Full export documentation package (commercial invoice, packing list, certificate of conformance, customs declaration) prepared within 24 hours of order confirmation.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
Location: Xiamen, Fujian, China
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.