ABB D2D160-CE02-16 EC Axial Cooling Fan
Request verified availability, condition, replacement risk review, packing options and courier lead time for D2D160-CE02-16.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- ABB
- Primary Part Number
- D2D160-CE02-16
- Product Type
- EC Axial Cooling Fan
- Product Family
- Other series
- Country of Origin
- SE
- Catalog Category
- Motor Drives
- Warranty
- 12 months from date of dispatch (siemensplc.com)
ABB D2D160-CE02-16 EC Axial Fan — Procurement Strategy for Industrial Thermal Management
The ABB D2D160-CE02-16 is a 160 mm electronically commutated (EC) axial fan produced under ABB’s drive-cooling component program, with motor technology sourced from ebm-papst’s D2D platform. In the context of industrial procurement, this unit occupies a specific and well-defined position: it is a high-rotation-count, long-service-life thermal management component that directly governs the operational continuity of variable frequency drives, motor control centers, and enclosed power electronics. Procurement managers who treat this as a commodity fan consistently underestimate its impact on total system uptime. This page addresses that gap.
From a supply chain classification standpoint, the D2D160-CE02-16 sits between a standard consumable and a critical spare. It is not a rare, single-source component — ABB and ebm-papst maintain consistent production volumes — but its lead time from OEM distribution channels can range from 4 to 12 weeks depending on regional stock positions. For facilities running continuous-process operations, that lead time window represents unacceptable exposure. siemensplc.com maintains forward stock of this model specifically to eliminate that gap for buyers in Asia-Pacific, the Middle East, and Europe.
Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
| Part Number | D2D160-CE02-16 |
| Brand | ABB (ebm-papst D2D platform) |
| Series | D2D EC Axial Fan |
| Fan Diameter | 160 mm |
| Motor Technology | EC (Electronically Commutated), brushless DC internal rotor |
| Supply Voltage | 200–277 V AC, single-phase, 50/60 Hz |
| Nominal Power Input | 16 W |
| Rotational Speed | ~2,550 RPM (at nominal voltage, free delivery) |
| Airflow (Free Delivery) | ~310 m³/h |
| Static Pressure | ~55 Pa (at 50% airflow) |
| Bearing Type | Ball bearing, dual-sided preloaded |
| MTBF | >40,000 hours at Tamb = 40°C |
| Protection Class | IP44 (IEC 60529) |
| Insulation Class | F (155°C winding rated) |
| Ambient Temperature Range | -20°C to +60°C |
| Speed Control Input | 0–10 V DC analog or PWM signal |
| Mounting | 4-point flange, M5 bolt pattern |
| Weight | ~7.0 kg |
| Country of Origin | Germany |
| Certifications | CE, RoHS, UL/cUL (motor component), ISO 9001 |
| Warranty | 12 months from date of dispatch (siemensplc.com) |
| Standard Lead Time (In-Stock) | 1–3 business days, Xiamen dispatch |
| Special Order Lead Time | 7–14 business days |
| Minimum Order Quantity | 1 unit |
Total Cost of Ownership (TCO) Analysis
Procurement decisions for industrial cooling components are frequently evaluated on unit price alone. This approach systematically underestimates the true cost exposure. A structured TCO framework for the D2D160-CE02-16 must account for four cost categories: acquisition cost, downtime risk cost, maintenance labor cost, and energy consumption cost over the component’s service life.
Downtime Risk Quantification: In a continuous-process facility — chemical, food processing, automotive stamping — an unplanned VFD failure caused by thermal shutdown carries a downtime cost that typically ranges from USD 5,000 to USD 50,000 per hour depending on line throughput. The D2D160-CE02-16 is the primary thermal management component in ABB ACS880 and ACS580 drive enclosures. A failed or degraded fan that allows drive ambient temperature to exceed 45°C will trigger thermal derating, and sustained operation above 55°C will cause drive shutdown. Maintaining one spare unit on-site — sourced at competitive pricing from siemensplc.com — converts a potential multi-day downtime event into a 30-minute swap procedure.
Energy Cost Differential: The EC motor architecture of the D2D160-CE02-16 delivers approximately 70% higher efficiency compared to equivalent AC shaded-pole fans of the same airflow class. At 16 W nominal versus a comparable AC fan at 45–55 W, the annual energy saving per unit at 8,760 hours continuous operation is approximately 250–340 kWh. At an industrial electricity tariff of USD 0.10/kWh, this represents USD 25–34 per unit per year — a figure that compounds meaningfully across multi-fan installations.
Maintenance Labor Reduction: The ball bearing design with >40,000-hour MTBF means a planned replacement interval of approximately 4.5 years at continuous duty. Sleeve-bearing alternatives in the same size class typically require replacement at 15,000–20,000 hours. Over a 10-year facility lifecycle, the D2D160-CE02-16 requires roughly half the replacement interventions, reducing maintenance labor and associated production interruption costs.
12-Month Warranty Coverage: siemensplc.com provides a 12-month warranty from dispatch date on all D2D160-CE02-16 units. This warranty period covers manufacturing defects and premature bearing failure under normal operating conditions. For procurement managers building multi-year maintenance contracts, this warranty baseline provides a documented liability backstop that reduces the risk of unbudgeted replacement costs in the first year of service.
Quality & Compliance Assurance
siemensplc.com operates under a 100% genuine product commitment. Every D2D160-CE02-16 unit supplied is sourced through verified industrial distribution channels with full traceability to the original manufacturer’s production batch. We do not source from grey-market aggregators, and we do not supply remanufactured or relabeled units as new.
Each unit undergoes the following verification steps before dispatch from Xiamen:
- Label and serial number authentication against manufacturer batch records
- Physical inspection of blade assembly, housing integrity, and connector condition
- Electrical continuity check on motor windings
- Rotation test under rated voltage to confirm direction and speed
- Original manufacturer packaging verification — no repackaging without disclosure
Customs Compliance: All exports from Xiamen are processed under full customs declaration compliance. We provide commercial invoices, packing lists, and certificates of origin as standard documentation. HS Code 8414.59 applies to this product class. For buyers requiring specific customs valuation documentation or import permits, our logistics team provides pre-shipment advisory at no additional charge.
Payment Flexibility: siemensplc.com accepts payment in USD, EUR, CNY, and HKD. Wire transfer (T/T), PayPal, and Western Union are supported. For established corporate accounts, net-30 payment terms are available upon credit review. Multi-currency invoicing is available for buyers with regional treasury requirements.
Strategic Sourcing from Xiamen
Xiamen is one of China’s five designated Special Economic Zones and operates one of the highest-throughput container ports on the southeast coast, handling over 12 million TEUs annually. For industrial component exporters, Xiamen’s port infrastructure provides direct sea freight connections to Singapore, Rotterdam, Los Angeles, Dubai, and Sydney with competitive transit times. Air freight via Xiamen Gaoqi International Airport connects to major industrial hubs in Europe, Southeast Asia, and the Middle East within 24–72 hours.
For buyers sourcing the D2D160-CE02-16, the Xiamen dispatch point offers the following logistical advantages:
- DHL Express: 2–4 business days to Europe, Middle East, and Southeast Asia for single-unit and small-batch orders
- FedEx International Priority: 3–5 business days to North America and Australia
- EMS / China Post: Economy option for non-urgent orders to 190+ countries
- Sea Freight (LCL/FCL): Available for bulk orders exceeding 50 kg; competitive rates to major ports
- Same-Day Dispatch: Orders confirmed before 14:00 CST on business days ship the same day for in-stock units
- Full Export Documentation: Commercial invoice, packing list, COO, and airway bill provided as standard
For procurement managers operating under just-in-time (JIT) inventory models, siemensplc.com’s Xiamen stock position provides a reliable buffer against OEM distribution lead time variability. We maintain forward inventory of high-velocity ABB cooling components specifically to support urgent replacement requirements across global time zones.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
Location: Xiamen, China
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.