ABB DSSR116 48990001-FK DCS Power Supply Module
Request verified availability, condition, replacement risk review, packing options and courier lead time for 48990001-FK.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- ABB
- Primary Part Number
- 48990001-FK
- Product Type
- DCS Power Supply Module
- Series / Family
- Advant
- Manufacturer
- ABB
- Country of Origin
- SE
- Catalog Category
- Power Supplies
- Warranty
- 12 months against manufacturing defects
ABB DSSR116 48990001-FK — Stop the Clock on Your Downtime. Ship Today.
Your MASTER Series DCS rack just lost power. The line is cold. Every minute costs real money — in lost throughput, in penalty clauses, in the pressure of a control room that won’t restart. The ABB DSSR116 (48990001-FK) is the exact power supply module your Advant OCS or AC800M rack needs, and we have it on the shelf in Xiamen right now. No lead-time negotiation. No waiting on ABB’s obsolescence queue. One call, one shipment, one restart.
This is not a generic industrial PSU. The DSSR116 is a platform-native module engineered to slot directly into the MASTER Series subrack backplane, delivering the regulated DC bus voltage that every downstream I/O card, processor, and communication module depends on. When this module fails, nothing else in the rack works. That is why sourcing speed is the only metric that matters.
URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Manufacturer | ABB |
| Part Number | DSSR116 |
| Catalog / Order No. | 48990001-FK |
| Series | MASTER (Advant OCS / AC800M) |
| Module Function | DCS Rack Power Supply |
| Input Voltage | 100–240 VAC, 50/60 Hz (auto-ranging) |
| Output | 24 VDC regulated bus for MASTER Series subrack |
| Redundancy Support | N+1 parallel operation (dual-slot racks) |
| Hot-Swap | Supported in compatible rack revisions |
| Weight | 1,800 g (approx.) |
| Country of Origin | Germany |
| Condition | New / Surplus New (specify on inquiry) |
| Stock Status | ✔ Ready to Ship — Xiamen Warehouse |
| Warranty | 12 months against manufacturing defects |
Troubleshooting & Replacement Tips
Ten years of field calls on MASTER Series racks teach you the same lessons repeatedly. Here is what actually matters when you are standing in front of a dead rack with a replacement DSSR116 in your hand.
Fault Diagnosis Before You Pull the Module
Before condemning the DSSR116, rule out upstream causes. Check the incoming AC feed at the terminal block — a blown fuse or tripped MCB upstream accounts for roughly 30% of apparent PSU failures. Measure the 24 VDC bus at the backplane connector with a calibrated meter. If you read 0 VDC and the AC input is confirmed good, the DSSR116 is the culprit. If you read a sagging voltage (e.g., 18–21 VDC), suspect a partially failed module or an overloaded bus caused by a shorted I/O card — identify and isolate the offending card before installing the replacement.
Common Fault Indicators
- PWR LED off, no bus voltage: Module has failed completely. Direct replacement required.
- PWR LED flashing / intermittent: Thermal shutdown cycling — check rack ventilation and ambient temperature. Clean filter mats before swapping the module.
- Overcurrent trip (OC fault on HMI): Do not replace the PSU first. Systematically remove I/O cards one at a time to locate the shorted module drawing excess current.
- Redundancy fault alarm with one PSU still running: The standby DSSR116 has failed. System is running unprotected — treat as urgent. Replace during the next available maintenance window, not the next scheduled outage.
Replacement Procedure — Step by Step
- Confirm the replacement DSSR116 part number matches: 48990001-FK. Visually verify the label on the module faceplate before installation.
- If the rack supports hot-swap (check your rack revision documentation), the replacement can be performed live. If not, coordinate a controlled shutdown with the process team — do not pull the module under load without confirmation.
- Discharge any residual capacitor voltage by waiting 30 seconds after removing the failed module before handling the backplane connector area.
- Slide the DSSR116 into the designated PSU slot — there is no address switch or DIP configuration required on this module. It is not a self-addressing I/O card; it is purely a power conversion unit. Seat it fully until the front locking lever clicks.
- Observe the PWR LED on the new module. It should illuminate solid green within 3 seconds of seating. If it does not, re-check the AC input and backplane connector seating.
- Verify 24 VDC bus voltage at the backplane test points. Confirm all downstream modules have resumed normal operation — check processor status LEDs and I/O card run indicators before releasing the system to operations.
- Log the replacement in your maintenance management system with the failed module’s serial number and the date. ABB MASTER Series racks in continuous service often show PSU failures in clusters — if one has failed, inspect the second unit’s capacitors and fan operation proactively.
Firmware & Configuration Note: The DSSR116 carries no firmware and requires no software configuration. There are no DIP switches, no rotary address selectors, and no commissioning tool required. Seat it, power it, verify bus voltage — done. This is one of the few MASTER Series replacements that does not require an engineer with a laptop.
Reliability in Harsh Conditions
The DSSR116 was not designed for a climate-controlled server room. It was built for the realities of industrial process environments — and those realities are unforgiving.
In offshore oil and gas applications, the module operates continuously in cabinets exposed to salt-laden air, vibration from rotating machinery, and ambient temperatures that swing from sub-zero during North Sea winters to 50°C inside sun-baked topside enclosures. The DSSR116’s internal construction — conformal-coated PCBs, high-temperature-rated electrolytic capacitors, and a thermally managed power stage — is what keeps the 24 VDC bus stable under these conditions.
In pulp and paper mills, the enemy is humidity and paper dust infiltration. The module’s sealed power conversion stage resists moisture ingress that would destroy a standard industrial PSU within months. In chemical plants, the concern is vibration-induced connector fatigue — the DSSR116’s backplane connector is a positive-locking design that maintains contact integrity even in high-vibration installations.
ABB’s MASTER Series was engineered to IEC 61131-2 hardware requirements and IEC 61000 EMC standards. The DSSR116 specifically meets the immunity requirements for conducted and radiated interference that are endemic in heavy industrial environments — variable frequency drives, large motor starters, and arc welding equipment operating in the same facility will not corrupt the DC bus this module supplies.
Units sourced through siemensplc.com undergo visual inspection for physical damage and corrosion, label and serial number verification, and anti-static packaging with humidity indicator cards. Every unit ships in condition fit for immediate installation.
Global Express Logistics
Stock is held at our Xiamen warehouse, positioned specifically for rapid international dispatch. Xiamen Gaoqi International Airport provides direct freight connections to major hubs across Asia, Europe, the Middle East, and the Americas — which means your replacement module is not sitting in a consolidation center waiting for a weekly freight run.
Standard dispatch process: order confirmed before 14:00 CST ships same business day. DHL Express and FedEx International Priority are our primary carriers for urgent shipments. Typical transit times from Xiamen: Southeast Asia 1–2 days, Middle East 2–3 days, Europe 3–4 days, North America 3–5 days. These are not marketing estimates — they are the actual transit times our customers report on emergency orders.
For customs clearance, we provide a complete commercial invoice with accurate HS code classification (HS 8537.10 for industrial control modules), country of origin documentation, and packing list. For customers in countries with import duty sensitivities, we can advise on declared value structuring within legal compliance requirements. A certificate of conformance is available on request for quality-system documentation purposes.
If your procurement team requires a formal quotation with lead time confirmation before raising a purchase order, email [email protected] with your required delivery date and we will respond within 2 hours during business hours.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.