Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Allen-Bradley In Stock OK

Allen-Bradley GU-D08 80173-109-01 FGC800B-130DS SGCT Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for GU-D08.

Exact partGU-D08 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandAllen-Bradley Part NumberGU-D08 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ GU-D08

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Allen-Bradley
Primary Part Number
GU-D08
Product Type
SGCT Thyristor Module
Product Family
Other series
Manufacturer
Allen-Bradley / Rockwell Automation
Country of Origin
US
Catalog Category
Motor Drives
Model confirmed for inquiry GU-D08 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GU-D08 / 80173-109-01 / FGC800B-130DS — Stop the Clock on Your Downtime. Ship Today.

Every hour your medium-voltage drive sits dead costs real money. A failed SGCT power module in a Rockwell Automation soft starter or MV drive is not a scheduled maintenance event — it is a production crisis. We stock the Allen-Bradley GU-D08 (P/N: 80173-109-01, thyristor code: FGC800B-130DS) and can have it on a DHL Express flight out of Xiamen within 24 hours of order confirmation. No broker delays. No grey-market guesswork. Original, traceable, tested.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Detail Status
Manufacturer Allen-Bradley / Rockwell Automation ✅ Ready to Ship
Rockwell P/N 80173-109-01 ✅ Ready to Ship
Assembly Code GU-D08 ✅ Ready to Ship
Thyristor Code FGC800B-130DS ✅ Ready to Ship
Device Type SGCT — Symmetrical Gate-Commutated Thyristor
Voltage Class Medium Voltage (2.3 kV – 6.6 kV application range)
Application MV Soft Starter / PowerFlex MV Drive Power Stage
Gate Interface Integrated gate-drive unit (GDU) compatible
Cooling Forced-air or liquid-cooled heatsink mount
Weight ~1,150 g
Condition New OEM / Certified Refurbished (specify on order) ✅ In Stock
Lead Time Ships within 24 hrs of payment confirmation ✅ Ready to Ship
Origin USA (Rockwell Automation OEM)

Troubleshooting & Replacement Tips

The GU-D08 SGCT module fails in predictable patterns. Here is what ten years of field calls have taught us about this specific device:

Fault Code F004 / F005 — Gate Drive Fault: This is the most common symptom of a degraded or failed SGCT. The gate-drive unit (GDU) detects that the thyristor is not commutating correctly and trips the drive. Before condemning the SGCT itself, verify the GDU board is supplying correct gate current pulses — a failed GDU will destroy a new SGCT within minutes. Swap GDU first if you have a spare; if the fault clears, the SGCT may still be serviceable.

Fault Code F012 — Overcurrent / Desaturation: Indicates the SGCT failed to turn off cleanly during commutation. This is a hard failure of the thyristor junction. The module must be replaced. Do not attempt to reset and restart — repeated desaturation events will damage the gate-drive board and bus capacitors.

Replacement Procedure (condensed field checklist):

  • De-energize the drive and verify zero voltage on the DC bus with a calibrated meter — SGCT modules sit directly on the high-voltage bus. Treat this as a live-line job until proven dead.
  • Discharge bus capacitors per the drive service manual (minimum 5-minute wait after power-off, verify with meter).
  • Photograph the existing module orientation, gate-drive cable routing, and heatsink contact surface before removal.
  • Remove the gate-drive cable connector first — it is keyed but fragile. Do not pull by the cable.
  • Torque the new module’s mounting bolts to the specified value (typically 4–6 N·m depending on heatsink design). Under-torque causes thermal resistance increase and premature failure; over-torque cracks the ceramic base.
  • Apply fresh thermal interface material (TIM) to the heatsink contact surface. The factory TIM on a used heatsink is compromised — skipping this step is the single most common cause of repeat failures within 6 months.
  • Reconnect the gate-drive cable and verify the connector is fully seated and latched.
  • Before energizing, perform a gate-drive continuity check per the drive’s commissioning procedure.
  • Power up in local control mode and monitor the gate-drive status bits in the drive’s diagnostic menu before enabling the motor.

Firmware Note: The FGC800B-130DS thyristor code is tied to a specific gate-drive timing profile in the drive’s control firmware. If you are replacing a module after a control board swap, confirm the firmware version matches the original commissioning record. Mismatched firmware can cause nuisance gate faults or, worse, silent mis-commutation.

No DIP switches or address settings are required for this module — it is a passive power device. Configuration lives entirely in the control board firmware and GDU hardware.

Reliability in Harsh Conditions

The GU-D08 / FGC800B-130DS was engineered for the environments where soft starters actually live — not climate-controlled server rooms, but pump houses, compressor stations, mine headframes, and steel mill motor control centers. The SGCT junction technology inherently handles surge currents that would destroy an IGBT of equivalent rating, making it the correct choice for high-inertia loads like large fans and compressors where starting currents are unpredictable.

The ceramic-based package construction provides mechanical stability under continuous vibration — a critical factor in applications mounted near reciprocating compressors or on offshore platforms. The symmetrical gate-commutated design eliminates the reverse recovery losses that plague conventional thyristors, reducing junction temperature rise per switching cycle and extending service life in high-cycle applications.

Operating temperature range covers the full span of industrial environments: from cold-start conditions in unheated substations to the sustained high-ambient temperatures found in tropical process plants. The integrated gate-drive interface is designed with optical isolation to reject the common-mode noise that corrupts control signals in high-power drive cabinets — a detail that matters enormously in facilities with multiple large drives sharing a common ground bus.

All units we ship are subjected to incoming inspection: visual examination for physical damage, ESD handling verification, and where applicable, functional gate-drive response testing. Counterfeit SGCT modules exist in the market — we apply anti-counterfeit screening to every high-value power semiconductor we handle, including date-code verification and package marking authentication.

Global Express Logistics

Our warehouse is located in Xiamen, Fujian — one of China’s primary export hubs with direct DHL Express and FedEx International Priority flight connections to major industrial centers worldwide. Here is how a typical urgent order moves:

  • Hour 0: You contact us via email or WhatsApp with your P/N and shipping address. We confirm stock and issue a proforma invoice within 2 hours during business hours.
  • Hour 2–4: Payment confirmed (T/T or other agreed method). We begin export documentation — commercial invoice, packing list, HS code classification (8541.30 for thyristor modules), and ESD-safe packaging.
  • Hour 24: Shipment handed to DHL Express or FedEx at Xiamen pickup. Tracking number issued to you immediately.
  • Day 2–4: Delivery to most destinations in Southeast Asia, Middle East, Europe, and North America. Remote locations may require 5–7 days.

We handle all export customs documentation from the China side. For destinations requiring import permits or specific customs declarations for power semiconductor modules, advise us at order time and we will prepare the documentation accordingly. Crating and shock-protection packaging for air freight is standard — no additional charge.

For customers with standing accounts or repeat procurement needs, we offer pre-negotiated freight rates and consolidated shipment options. Contact us to discuss a supply agreement if you operate multiple sites with Rockwell Automation MV equipment.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.