KUKA 00-194-763 CCU0000194763 Cabinet Control Unit Board
Request verified availability, condition, replacement risk review, packing options and courier lead time for 00-194-763.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- KUKA
- Primary Part Number
- 00-194-763
- Product Type
- Cabinet Control Unit Board
- Series / Family
- 3 CCU0000194763 KR C Series
- Country of Origin
- DE
- Catalog Category
- Industrial Automation Spares
KUKA 00-194-763 CCU0000194763 KR C Series Cabinet Control Unit — A Procurement Director’s Sourcing Brief
When a KUKA robot controller cabinet goes offline, every minute of unplanned downtime translates directly into production loss, schedule compression, and escalating labor costs. The KUKA 00-194-763 (cross-reference: CCU0000194763) Cabinet Control Unit board is the central communication and supervisory hub within the KR C2 and KR C4 controller enclosures. It governs real-time data exchange between the robot’s drive electronics, safety circuits, and the teach pendant interface. Without a functioning CCU, the entire robot cell is inoperable — making this component one of the highest-criticality spare parts in any KUKA-equipped facility.
At siemensplc.com, we specialize in the strategic sourcing of exactly these high-stakes automation components. Our procurement infrastructure is built around one principle: your production line should never stop because a critical board is unavailable. Whether you maintain a buffer stock program or operate on a just-in-time basis, we provide the supply chain flexibility to match your operational model.
Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
- Part Number: 00-194-763
- Cross Reference / Alternate PN: CCU0000194763
- Component Classification: Cabinet Control Unit (CCU) Board
- Compatible Platform: KUKA KR C Series — KR C2 & KR C4 Controller Cabinets
- OEM Manufacturer: KUKA Roboter GmbH
- Country of Manufacture: Germany
- Unit Weight: 380 g
- Condition Available: New OEM / Tested Refurbished (specify at inquiry)
- HS Code (Reference): 8537.10 — Boards, panels, consoles for electric control
- Lead Time: In-stock units dispatch within 1–3 business days from Xiamen. For units sourced on-demand from our global network, typical lead time is 7–15 business days. Expedited sourcing available for critical shutdowns — contact us directly for priority handling.
- Minimum Order Quantity: 1 unit (volume pricing available for 3+ units)
- Export Documentation: Commercial invoice, packing list, certificate of origin, and customs declaration provided as standard
Total Cost of Ownership (TCO) Analysis
Procurement decisions for industrial automation spares are rarely evaluated on unit price alone. A rigorous TCO framework must account for four cost vectors: acquisition cost, downtime exposure, maintenance burden, and end-of-life replacement frequency. The KUKA 00-194-763 sits at the intersection of all four.
Downtime Risk Quantification: In a typical automotive or heavy manufacturing environment, a single robot cell generates between USD 5,000 and USD 20,000 per hour in direct production value. A CCU board failure that grounds a KR C2 or KR C4 cabinet for 48–72 hours while a replacement is sourced through slow channels represents a downtime cost that dwarfs the component’s acquisition price by a factor of 10 to 50. Maintaining even a single buffer unit of the 00-194-763 in your MRO inventory eliminates this exposure entirely.
Third-Party Specialist vs. OEM Channel: Sourcing through the original equipment manufacturer’s service network typically involves extended lead times (4–12 weeks for legacy KR C2 components), mandatory service contracts, and premium pricing structures that reflect the OEM’s overhead rather than the component’s market value. A specialist distributor like siemensplc.com operates with a leaner cost structure, direct access to secondary market inventory, and the flexibility to source globally — translating into 20–40% lower acquisition cost and dramatically shorter lead times for the same genuine part.
12-Month Warranty Coverage: Every unit shipped from siemensplc.com carries a 12-month warranty against manufacturing defects and functional failure. This warranty period directly reduces your OPEX by eliminating the need to budget for early-failure replacement within the first year of service. For facilities running multi-shift operations, this assurance is a measurable line-item reduction in your annual maintenance reserve.
CAPEX Deferral Through Reliable Spares: When a robot controller cabinet can be restored to service with a verified replacement CCU board rather than replaced as a complete unit, the capital expenditure associated with a full controller upgrade is deferred — often by several years. The 00-194-763, properly sourced and installed, extends the productive life of your existing KR C infrastructure without requiring a platform migration or retraining investment.
Inventory Carrying Cost Optimization: For procurement managers balancing working capital against operational risk, siemensplc.com offers consignment-style arrangements and volume pricing tiers that allow you to maintain adequate spare coverage without tying up excessive capital in slow-moving inventory. Our real-time stock visibility and rapid replenishment capability mean you can carry leaner buffer stock with confidence.
Quality & Compliance Assurance
Every KUKA 00-194-763 / CCU0000194763 unit processed through siemensplc.com undergoes a documented verification workflow before dispatch. This is not a checkbox exercise — it is a structured quality gate designed to protect your production environment from counterfeit or substandard components, which remain a genuine risk in the global industrial spare parts market.
- 100% Genuine OEM Commitment: We source exclusively from verified industrial distributors and authorized secondary market channels. No third-party clones, no remarked boards, no counterfeit risk. Supply chain documentation is available on request for any unit.
- Physical Inspection Protocol: Each board is examined for label integrity, PCB condition, connector pin alignment, and absence of thermal damage or corrosion before it is listed or dispatched.
- Functional Verification: Where test infrastructure permits, boards undergo bench-level power-on and communication protocol testing to confirm operational status prior to shipment.
- Xiamen Customs Compliance: All exports are processed through Xiamen Customs with full commercial documentation — commercial invoice, packing list, certificate of origin, and HS code declaration. We operate in full compliance with Chinese export regulations and international trade law, ensuring your import clearance process is straightforward in any destination country.
- Multi-Currency Payment Support: We accept payment in USD, EUR, HKD, CNY, and other major currencies via T/T bank transfer, PayPal, and trade finance instruments. Flexible payment terms available for established accounts.
- ESD-Safe Packaging: All boards are shipped in anti-static ESD bags with foam cushioning and moisture barrier packaging, ensuring the component arrives in the same condition it left our facility.
Strategic Sourcing from Xiamen
Xiamen is not simply a geographic location — it is one of China’s premier international trade and logistics hubs, purpose-built for the efficient movement of industrial goods to global markets. Xiamen Gaoqi International Airport and Xiamen Port together provide direct freight access to major industrial centers across North America, Europe, Southeast Asia, the Middle East, and beyond.
For time-critical shipments, DHL Express and FedEx International Priority services from Xiamen deliver to most major industrial cities within 2–5 business days. For bulk MRO procurement, sea freight consolidation from Xiamen Port offers cost-effective delivery with reliable transit schedules. Our logistics team manages the full export process — freight booking, customs declaration, insurance, and tracking — so your procurement team receives a single point of contact from order confirmation to delivery.
Xiamen’s position within China’s free trade zone framework also provides regulatory advantages for cross-border industrial trade, including streamlined customs procedures and access to bonded warehouse facilities that support just-in-time delivery models for international buyers.
Contact Information
Our industrial sourcing team is available to assist with technical verification, stock confirmation, volume pricing, and export logistics for the KUKA 00-194-763 CCU0000194763 and all related KR C Series components.
- Email: [email protected]
- WhatsApp: +86 18359268345
- Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.