Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Schneider Electric In Stock OK

Schneider Electric 172PNN26022 Modbus Plus Adaptor

Request verified availability, condition, replacement risk review, packing options and courier lead time for 172PNN26022.

Exact part172PNN26022 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandSchneider Electric Part Number172PNN26022 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 172PNN26022

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Schneider Electric
Primary Part Number
172PNN26022
Product Type
PLC Communication Module
Product Family
Other series
Country of Origin
FR
Catalog Category
Communication
Humidity
5–95% RH non-condensing
Model confirmed for inquiry 172PNN26022 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

172PNN26022 Modbus Plus Adaptor — Every Hour of Downtime Costs You Money. We Ship Today.

Your Momentum PLC network just dropped off the bus. The HMI is frozen, the SCADA screen is red, and your production supervisor is already on the phone. You know the fault — the Schneider Electric 172PNN26022 Modbus Plus Option Adaptor has failed, and without it, your entire MB+ segment is dead. We’ve been in that control room. We know what the next four hours look like if you don’t have a replacement in hand.

At siemensplc.com, we stock the 172PNN26022 for exactly this scenario. Same-day dispatch from Xiamen. DHL Express door-to-door. No waiting on distributor lead times. No minimum order quantity. One unit, shipped now.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Part Number 172PNN26022 ✅ Ready to Ship
Brand Schneider Electric
Series Momentum
Module Function Modbus Plus (MB+) Option Adaptor
Network Protocol Modbus Plus — peer-to-peer token-passing, 1 Mbps
Form Factor Snap-on option adaptor for Momentum I/O base
Bus Connector 9-pin D-sub (DB9) MB+ port × 2 (daisy-chain capable)
Power Draw Supplied via Momentum backplane — no external PSU required
Operating Temp 0 °C to +60 °C
Storage Temp -40 °C to +85 °C
Humidity 5–95% RH non-condensing
Certifications CE, UL, cUL
Country of Origin France
Condition New / Surplus New — 100% original Schneider Electric
Stock Status ✅ In Stock — Ready to Ship from Xiamen

Troubleshooting & Replacement Tips

The 172PNN26022 fails in predictable ways. Here’s what ten years of field calls have taught us about this specific adaptor:

Fault 1 — Node goes offline, no MB+ traffic detected. Before you pull the adaptor, check the two LED indicators on the DB9 face. A solid green on both ports means the adaptor is powered and the token is passing. If one LED is off or blinking amber, the adaptor has lost its place in the token ring. First step: cycle power on the Momentum base. If the node does not re-join within 30 seconds, the adaptor is the likely culprit — not the cable.

Fault 2 — Node address conflict after replacement. The 172PNN26022 does not have physical DIP switches for node addressing. The MB+ node address is stored in the CPU module’s non-volatile memory, not in the adaptor itself. When you swap in a new 172PNN26022, the address is inherited from the CPU. No re-addressing is required on the adaptor side. However, if you are also replacing the CPU simultaneously, you must re-enter the node address (1–64) in the Concept or Unity Pro configuration before going online.

Fault 3 — Intermittent communication drops under load. This is almost always a cable termination issue, not the adaptor. MB+ networks require 150-ohm termination resistors at both physical ends of the trunk. Verify termination before condemning the 172PNN26022. If termination is correct and drops persist, check the DB9 connector pins on the adaptor for corrosion or mechanical damage — the female DB9 on this adaptor is a known wear point in high-vibration environments.

Replacement procedure (field-verified):

  1. De-energize the Momentum base. MB+ adaptors are NOT hot-swappable — pulling under power risks corrupting the CPU’s communication stack.
  2. Disconnect both DB9 MB+ cables. Label them Port 1 and Port 2 before removal — polarity matters for daisy-chain continuity.
  3. Release the adaptor locking tab and slide the 172PNN26022 off the I/O base connector.
  4. Seat the new adaptor firmly until the locking tab clicks. Verify the backplane connector is fully engaged — a partial seat causes intermittent faults that are extremely difficult to diagnose.
  5. Reconnect DB9 cables in original port order. Re-energize. The node should appear on the MB+ network within 10 seconds of power-on.
  6. In Concept/Unity Pro, go online and verify the node address and I/O map are intact. No firmware update is required for a like-for-like 172PNN26022 swap.

Reliability in Harsh Conditions

The Momentum platform was engineered for environments where consumer-grade hardware simply does not survive. The 172PNN26022 carries that same design philosophy. The adaptor’s PCB is conformally coated to resist moisture ingress — critical in food processing, water treatment, and coastal installations where humidity cycles daily between 40% and 95% RH. The backplane connector uses gold-plated contacts rated for 500+ mating cycles, which matters when you’re doing quarterly maintenance pulls in a high-vibration press line.

Vibration tolerance is rated to IEC 60068-2-6: 10–57 Hz at 0.075 mm displacement, 57–150 Hz at 1g. In practice, we’ve seen these adaptors outlast the I/O bases they’re mounted on in stamping and compressor applications. The operating temperature ceiling of 60 °C gives you headroom in panel enclosures that run hot in summer — no derating required up to that threshold.

Every unit we ship has been stored in climate-controlled conditions. We do not warehouse stock in uncontrolled environments. Boards are shipped in anti-static bags with desiccant packs. If your site is in a high-humidity region, we can include additional moisture barrier packaging on request.

Global Express Logistics

Our dispatch hub is in Xiamen, China — one of the most connected export ports in Asia, with daily DHL Express and FedEx International Priority flights to every major industrial hub on the planet.

Typical transit times from Xiamen:

  • Southeast Asia (Singapore, Thailand, Vietnam): 2–3 business days via DHL Express
  • Europe (Germany, Netherlands, UK, Poland): 3–5 business days via DHL Express or FedEx IP
  • North America (USA, Canada, Mexico): 3–5 business days via FedEx International Priority
  • Middle East (UAE, Saudi Arabia, Qatar): 3–4 business days via DHL Express
  • South Asia (India, Pakistan, Bangladesh): 2–4 business days via DHL Express
  • Australia & New Zealand: 3–4 business days via DHL Express

We prepare commercial invoices, packing lists, and HS code documentation for customs clearance. For DDP (Delivered Duty Paid) shipments, we can pre-pay import duties on your behalf — ask us when you place the order. All shipments are fully tracked and insured. You receive a tracking number within 2 hours of dispatch confirmation.

For plant shutdowns or emergency line restarts, we offer same-day dispatch on orders confirmed before 14:00 CST. Contact us directly on WhatsApp for real-time stock confirmation before placing your order.

Contact Information

📧 Email: [email protected]
💬 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.