Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Yokogawa In Stock OK

YOKOGAWA SPW481-13 DCS Power Supply Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for SPW481-13.

Exact partSPW481-13 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandYokogawa Part NumberSPW481-13 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ SPW481-13

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Yokogawa
Primary Part Number
SPW481-13
Product Type
DCS Power Supply Module
Series / Family
CENTUM VP
Manufacturer
YOKOGAWA Electric Corporation
Country of Origin
JP
Catalog Category
Power Supplies
Operating Temp.
0 °C to +55 °C
Humidity
5% to 95% RH (non-condensing)
Model confirmed for inquiry SPW481-13 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

YOKOGAWA SPW481-13 — Stop the Clock on Your Downtime. Ship Today.

Your CENTUM VP field control station just lost power. The process is down. Every minute costs real money — in lost throughput, in emergency labor, in customer penalties. You don’t need a sales pitch. You need the SPW481-13 on a plane tonight.

We stock the YOKOGAWA SPW481-13 power supply module at our Xiamen warehouse. Verified original. Bench-checked before it ships. DHL or FedEx express label printed the same day your order is confirmed. That’s the only promise that matters when your plant is down.

URGENT REQUIREMENT?
📧 Email: [email protected]
📱 WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification
Part Number SPW481-13
Manufacturer YOKOGAWA Electric Corporation
Series CENTUM VP
Module Function DC Power Supply for FCS / FCU
Input Voltage 100–240 V AC, 50/60 Hz
Output Voltage 24 V DC (regulated)
Rated Output Current 10 A (continuous)
Redundancy Support Yes — dual PSU hot-standby capable
Mounting CENTUM VP node unit rack (direct slot)
Cooling Forced air (internal fan)
Operating Temperature 0 °C to +55 °C
Humidity 5% to 95% RH (non-condensing)
Weight Approx. 2,140 g
Origin Japan
Condition New / Surplus New
Stock Status ✅ Ready to Ship — Xiamen Warehouse

Troubleshooting & Replacement Tips

After ten years of pulling failed PSUs out of live racks, here’s what actually matters when you’re swapping an SPW481-13 under pressure:

1. Confirm the fault before you pull the module.
The SPW481-13 has a front-panel LED status indicator. A solid red FAIL LED with no DC output confirms PSU failure. If the LED is off entirely, check the upstream AC breaker and the node unit’s internal fuse (F1, 6.3 A slow-blow) before condemning the module — a blown fuse is a 10-minute fix versus a 3-day part order.

2. Redundant configuration — do not pull both at once.
If your FCS is running dual SPW481-13 in hot-standby, the standby unit takes load automatically on primary failure. Confirm the standby is carrying load (its RUN LED should be solid green) before removing the failed unit. Pulling the wrong one in a panic causes a full FCS shutdown.

3. No DIP switches or address configuration required.
The SPW481-13 is a passive power supply — it has no firmware, no node address, and no DIP switch settings. Slot it in, secure the locking lever, restore AC input, and the FCS recognizes it within 5 seconds. No CENTUM VP engineering tool interaction needed for the swap itself.

4. Check the backplane connector pins before insertion.
A failed PSU that died from an internal short can leave carbon tracking or bent pins on the node unit backplane connector. Inspect with a flashlight before inserting the replacement. A damaged backplane will kill a new module within minutes.

5. Common fault codes associated with SPW481-13 failure:

  • ALM 3001 / 3002 — Node unit power supply abnormal. Primary indicator of SPW481-13 failure or AC input loss.
  • ALM 3010 — FCS communication interrupted. Can be triggered by PSU voltage sag before full failure — don’t ignore intermittent 3010 alarms.
  • ALM 3050 — Node unit hardware fault. Appears when the FCS detects the PSU slot as unpopulated or non-responsive post-failure.

6. Post-replacement verification.
After swap, navigate to CENTUM VP System View → Node Unit Status. Confirm the PSU slot shows green. Run a 15-minute observation period monitoring DC bus voltage via the FCS diagnostic screen before returning the loop to automatic control.

Reliability in Harsh Conditions

The SPW481-13 was not designed for a clean server room. It was built for the floor — oil refineries in the Middle East, chemical plants in Southeast Asia, pulp mills in Scandinavia. YOKOGAWA’s CENTUM VP power supply modules are validated against IEC 61131-2 environmental requirements, which means the SPW481-13 has been tested to withstand:

  • Vibration: 10–57 Hz at 0.075 mm amplitude, 57–150 Hz at 1 g — continuous sinusoidal vibration per IEC 60068-2-6. Suitable for installations near rotating machinery and compressor skids.
  • Shock: 15 g peak, 11 ms half-sine pulse per IEC 60068-2-27. Survives transport drops and installation impacts without internal component displacement.
  • Temperature cycling: Validated across the full 0–55 °C operating range with forced-air cooling. Internal components are rated to 85 °C junction temperature, providing substantial thermal headroom in ambient conditions up to 55 °C.
  • Humidity and condensation: Conformal coating on internal PCBs provides protection against humidity excursions. Rated to 95% RH non-condensing — suitable for coastal and tropical plant environments.
  • EMI/EMC: Compliant with IEC 61000-4 series immunity requirements including ESD (Level 3), radiated immunity (Level 3), and conducted immunity. Operates without upset in environments with variable-frequency drives and large motor starters nearby.

Units in our stock are stored in climate-controlled, ESD-safe racking. Each module is individually bagged in anti-static packaging with desiccant before shipment. Long-term storage units undergo a power-on verification test before dispatch.

Global Express Logistics

Our warehouse is in Xiamen, Fujian — one of China’s primary export hubs with direct access to Xiamen Gaoqi International Airport (XMN) and daily DHL and FedEx pickup routes.

Standard express timeline from order confirmation:

  • Same day: Order confirmed, unit pulled from shelf, bench-checked, packed in ESD-safe foam-lined carton, export documentation prepared (commercial invoice, packing list, HS code 8537.10).
  • Day 1: DHL Express or FedEx International Priority pickup. Tracking number issued to buyer within 2 hours of handover.
  • Day 2–3: Delivery to most destinations in Southeast Asia, Japan, South Korea, Australia, Middle East, and Europe. North America typically Day 3–4.

Shipping options available:

  • DHL Express Worldwide — recommended for urgent replacements
  • FedEx International Priority — alternative express option
  • UPS Express — available on request
  • Sea freight (FCL/LCL) — for bulk orders where lead time allows

All shipments include full export documentation. For destinations requiring import permits or specific customs declarations for industrial automation equipment, contact us before ordering — we handle this regularly and can advise on HS code classification and required certificates of origin.

We do not use consolidators or third-party freight forwarders for express shipments. Your package goes directly from our hands to the courier — no intermediate handling, no delays at a freight hub.

Contact Information

📧 Email: [email protected]
📱 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.