Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB SS823 3BSE038226R1 DCS Power Voting Unit

Request verified availability, condition, replacement risk review, packing options and courier lead time for SS823-3BSE038226R1.

Exact partSS823-3BSE038226R1 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberSS823-3BSE038226R1 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ SS823-3BSE038226R1

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
SS823-3BSE038226R1
Product Type
DCS Power Module
Series / Family
AC800M
Manufacturer
ABB (ASEA Brown Boveri)
Country of Origin
SE
Model Function
Power Voting Unit — Redundant Power Arbitration
Catalog Category
I/O Modules
Operating Temp.
0°C to +55°C
Model confirmed for inquiry SS823-3BSE038226R1 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB SS823 3BSE038226R1 — Enterprise Procurement Strategy for AC800M DCS Power Voting Units

For procurement managers and plant engineers operating ABB AC800M distributed control systems, securing a reliable supply of the SS823 (3BSE038226R1) Power Voting Unit is not a routine purchase — it is a risk management decision. This unit sits at the heart of redundant power arbitration within S800 I/O stations, and its absence from a spare-parts inventory can translate directly into unplanned downtime events that cost far more than the component itself. At siemensplc.com, we approach every SS823 inquiry as a supply chain continuity challenge, not a catalog transaction.

The SS823 is classified as a moderately scarce legacy component within the ABB AC800M ecosystem. While ABB continues to support the S800 I/O platform, original factory lead times for this specific voting unit can stretch from four to twelve weeks depending on regional distributor stock positions and production scheduling. For facilities running continuous processes — refineries, chemical plants, power generation assets — that lead time is operationally unacceptable. Our global sourcing network, anchored in Xiamen and extending across verified industrial surplus channels in Europe, North America, and Southeast Asia, allows us to compress that window significantly while maintaining full traceability and authenticity standards.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Manufacturer ABB (ASEA Brown Boveri)
Model Number SS823
ABB Part Number 3BSE038226R1
Product Series S800 I/O / AC800M DCS
Function Power Voting Unit — Redundant Power Arbitration
Mounting Interface S800 I/O Station / DIN Rail
Communication Bus S800 I/O Internal Bus
Operating Temperature 0°C to +55°C
Storage Temperature −40°C to +70°C
Relative Humidity 5–95% RH, non-condensing
Protection Rating IP20
Unit Weight Approx. 870 g
Certifications CE, UL (verify against current ABB datasheet)
Country of Origin Sweden
Condition Available New-in-box; tested surplus (clearly stated per listing)
Standard Lead Time 3–7 business days for in-stock units; 2–5 weeks for global sourcing orders
Shipping Terms EXW Xiamen, FOB Xiamen, CIF, DDP — negotiable by order volume
Minimum Order Quantity 1 unit (bulk pricing available from 3 units)
Payment Currencies USD, EUR, CNY, HKD, GBP — T/T, PayPal, LC accepted

Total Cost of Ownership (TCO) Analysis

Procurement teams evaluating the SS823 3BSE038226R1 often focus on unit price as the primary cost variable. In practice, the unit price represents a fraction of the true financial exposure associated with this component. A structured TCO framework reveals a more complete picture.

Downtime Risk Quantification: In a continuous-process facility — a petrochemical cracker, a power generation unit, a pharmaceutical batch reactor — an unplanned shutdown attributable to a failed power voting unit carries a direct production loss that typically ranges from USD 50,000 to USD 500,000 per day, depending on throughput and product margin. The SS823 governs whether dual power supplies operate in a validated redundant state. A degraded or failed unit does not necessarily cause an immediate trip, but it eliminates the redundancy buffer, converting a fault-tolerant system into a single-point-of-failure architecture. The risk premium of operating without a qualified spare on the shelf is therefore not theoretical — it is actuarial.

CAPEX Reduction Through Third-Party Sourcing: OEM procurement channels for the SS823 carry list prices that reflect distributor margin stacking, regional import duties, and minimum order constraints. Sourcing through siemensplc.com eliminates multiple intermediary layers. For a plant maintaining a recommended spare-parts inventory of three to five SS823 units across redundant DCS cabinets, the per-unit savings achievable through our channel — typically 15–35% below regional OEM list price — translate into meaningful CAPEX reduction without any compromise to component authenticity or warranty coverage.

OPEX Impact of Extended Warranty Coverage: Every SS823 unit supplied by siemensplc.com carries a 12-month warranty from the date of shipment, with a dead-on-arrival replacement policy and documented failure analysis support. For maintenance budgets operating under fixed OPEX envelopes, this warranty structure converts an unpredictable repair cost into a defined, manageable liability. It also reduces the administrative burden on maintenance engineering teams, who would otherwise need to manage OEM warranty claims through regional service centers with variable response times.

Inventory Carrying Cost Optimization: Because our lead times for in-stock SS823 units run 3–7 business days versus the 4–12 week OEM channel, facilities can maintain leaner on-site spare inventories without increasing operational risk. Reducing on-hand spare stock from five units to two — while relying on our rapid-fulfillment capability as a virtual buffer — can free meaningful working capital that would otherwise be tied up in slow-moving MRO inventory.

Quality & Compliance Assurance

Every SS823 3BSE038226R1 unit dispatched from siemensplc.com passes through a documented pre-shipment verification process. Visual inspection confirms label integrity, housing condition, and the absence of rework indicators. Functional verification confirms that the unit powers up correctly and that communication bus interfaces are intact. Anti-static packaging with humidity indicator cards is standard for all DCS module shipments.

We maintain a 100% genuine product commitment. Units are sourced exclusively through verified industrial automation supply channels with documented chain-of-custody records. Serial number cross-referencing against ABB manufacturing records is performed where the database is accessible. Batch traceability documentation is available on request for customers with audit or regulatory compliance requirements.

All export documentation is prepared in full compliance with Xiamen Customs regulations, including accurate HS code classification, commercial invoice, packing list, and certificate of origin where required. We support multi-currency invoicing in USD, EUR, CNY, HKD, and GBP, and accept payment via telegraphic transfer, PayPal, and letter of credit for qualified institutional buyers. Our export compliance team ensures that all shipments meet the destination country’s import requirements, reducing the risk of customs delays that could compromise your maintenance schedule.

Strategic Sourcing from Xiamen

Xiamen occupies a structurally advantaged position within the global industrial components supply chain. As one of China’s five original Special Economic Zones, the city hosts a mature ecosystem of bonded warehouses, freight forwarders, and customs brokers with deep experience in industrial automation hardware. Xiamen Gaoqi International Airport and Xiamen Port together provide daily air freight connections to major industrial hubs across Europe, the Middle East, Southeast Asia, and the Americas, with typical transit times of 3–7 days for air freight and 18–35 days for sea freight depending on destination port.

For buyers in time-critical situations — a plant shutdown with a hard restart deadline, a commissioning project with contractual milestone penalties — our Xiamen base allows us to consolidate multi-brand orders, clear customs efficiently, and dispatch via DHL Express, FedEx Priority, or UPS Worldwide with same-day or next-day cut-off processing. For volume buyers on scheduled maintenance programs, we offer consignment stock arrangements and blanket purchase order fulfillment from our bonded inventory, eliminating per-shipment administrative overhead and smoothing cash flow across the procurement cycle.

Our sourcing team maintains active relationships with industrial surplus dealers and authorized sub-distributors across Germany, the Netherlands, the United States, Japan, and Singapore — markets where decommissioned ABB AC800M systems generate a steady flow of verified, low-hour components. This geographic reach is what allows us to locate and qualify SS823 units that are simply not visible through standard OEM distribution channels, particularly for end-of-life or allocation-constrained part numbers.

Contact Information

To request a formal quotation, confirm real-time stock availability, or discuss a blanket purchase agreement for the ABB SS823 3BSE038226R1, please reach out through any of the following channels:

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.