Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Woodward In Stock OK

WOODWARD 5464-414 Speed Sensor Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for 5464-414.

Exact part5464-414 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandWoodward Part Number5464-414 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 5464-414

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Woodward
Primary Part Number
5464-414
Product Type
Speed Sensor Module
Product Family
Other series
Manufacturer
WOODWARD
Country of Origin
US
Catalog Category
Sensors & Switches
Operating Temp.
−20°C to +70°C
Warranty
12 months from date of shipment
Model confirmed for inquiry 5464-414 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

WOODWARD 5464-414 Digital Micro Process Speed Sensor — Procurement Strategy for Industrial Buyers

For procurement managers and reliability engineers responsible for turbine governors, compressor protection systems, and safety instrumented functions, the WOODWARD 5464-414 represents a mission-critical component where sourcing decisions carry direct financial and operational consequences. This page is structured to support your vendor qualification process, total cost of ownership modelling, and supply chain risk assessment — not to sell you a product, but to help you make the right decision.

The 5464-414 belongs to WOODWARD’s Digital Micro Process series — a platform that has been deployed across gas turbine power plants, LNG compressor trains, and marine propulsion systems for decades. Its longevity in the field means two things for procurement: first, installed base is enormous, creating sustained demand that keeps the secondary market active and pricing competitive; second, the component is well-understood by maintenance teams, reducing commissioning risk when sourcing from a qualified third-party supplier. At siemensplc.com, we maintain verified stock of the 5464-414 and can support both spot purchases and scheduled blanket orders for MRO programs.

The 5464-414 is a high-velocity MRO item across power generation and oil & gas sectors. Unlike niche or obsolete modules that require global sourcing campaigns, this part benefits from a healthy secondary market driven by decommissioned turbine fleets and OEM surplus programs. Our Xiamen operations maintain standing inventory with typical lead times of 3–7 business days for in-stock units, and 2–4 weeks for sourced units requiring full inspection. For procurement teams running just-in-time MRO programs or managing critical spare parts lists (CSL), this availability profile translates directly into reduced safety stock requirements and lower carrying costs.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Part Number 5464-414
Manufacturer WOODWARD
Series Digital Micro Process
Module Function Frequency-to-Digital Speed Signal Converter
Input Compatibility Magnetic pickup (MPU), proximity probe, passive speed sensor
Speed Range 0 – 30,000 RPM (configurable via gear tooth count)
Measurement Resolution ±0.01% of full scale
Response Latency <1 ms
Output Signal Digital pulse train + 4–20 mA analog retransmission
Supply Voltage 24 VDC nominal (18–32 VDC operating range)
Operating Temperature −20°C to +70°C
Humidity Rating 5–95% RH, non-condensing
Vibration Standard IEC 60068-2-6
Mounting DIN rail / panel mount
Weight 960 g
Certifications CE, UL, IEC 61511 SIL 2 capable
Country of Origin United States
HS Code (Reference) 9032.89 (electronic automatic regulating instruments)
Standard Lead Time (In-Stock) 3–7 business days from Xiamen
Sourced Lead Time 2–4 weeks with full inspection and documentation
Warranty 12 months from date of shipment
Minimum Order Quantity 1 unit (bulk pricing available for 5+ units)

Total Cost of Ownership (TCO) Analysis

Procurement decisions for industrial automation components are rarely about unit price alone. For a module like the WOODWARD 5464-414 — embedded in overspeed protection and governor control loops — the true cost of a sourcing failure extends far beyond the purchase order. A structured TCO framework reveals why partnering with a qualified third-party supplier such as siemensplc.com consistently delivers lower total expenditure than either OEM-only procurement or unvetted spot-market sourcing.

Downtime Risk Reduction: In gas turbine power generation, an unplanned outage caused by a failed speed sensor module carries a direct cost of USD $50,000–$200,000 per day in lost generation revenue, depending on plant capacity and power purchase agreement terms. For a compressor train in an LNG facility, the figure is higher still. The 5464-414’s role in the protective shutdown chain means that a failed or unavailable spare translates immediately into extended mean time to repair (MTTR). Maintaining a qualified, pre-inspected spare sourced from siemensplc.com — with documented functional test data — eliminates the 2–6 week OEM procurement cycle that typically dominates MTTR in critical spare scenarios. The cost of one avoided downtime event typically exceeds the annual spend on a managed spare parts program by a factor of 10 to 50.

CAPEX Reduction via Third-Party Sourcing: OEM list pricing for the WOODWARD 5464-414 through authorized distribution channels typically carries a 40–70% premium over qualified secondary market pricing, reflecting OEM channel margin structures rather than any difference in the physical component. For capital projects specifying multiple speed monitoring channels — a 4-unit gas turbine power plant may require 12–24 speed sensor modules across governor and protection systems — the delta between OEM and qualified third-party pricing represents a material CAPEX line item. Procurement teams with approved vendor lists (AVL) that include qualified third-party suppliers routinely achieve 25–45% savings on automation hardware without compromising functional performance or warranty coverage.

OPEX Reduction via Warranty and Inspection Coverage: Our 12-month warranty on every 5464-414 unit shipped covers functional failure under normal operating conditions, with replacement or credit issued within 10 business days of confirmed fault. This warranty structure converts an unpredictable OPEX exposure — emergency procurement at spot-market premiums during a plant-down event — into a predictable, budgeted maintenance cost. Combined with our pre-shipment functional bench test (simulated MPU input across 10 Hz–500 Hz, digital output and 4–20 mA retransmission verified against factory specification), the probability of receiving a non-functional unit is reduced to near zero, eliminating the hidden cost of incoming inspection failures that plague unvetted secondary market purchases.

Inventory Carrying Cost Optimization: For MRO managers optimizing critical spare parts lists, the 3–7 business day lead time from our Xiamen stock enables a leaner safety stock posture. Rather than holding 3–5 units on-site to buffer against OEM lead times of 8–16 weeks, a procurement team with siemensplc.com on their AVL can reduce on-site spare holdings to 1–2 units, freeing working capital and reducing the risk of holding obsolete stock through turbine fleet upgrades.

Quality & Compliance Assurance

Every WOODWARD 5464-414 unit shipped from siemensplc.com is subject to a documented four-stage inspection protocol before dispatch. Visual and physical inspection covers board-level examination for corrosion, component damage, counterfeit markings, and date code verification. Functional bench testing applies a simulated magnetic pickup signal across the full frequency range and verifies both digital output and 4–20 mA retransmission against WOODWARD factory specifications. Calibration verification confirms speed measurement accuracy at five test points across the operating range. Documentation assembly compiles all available original WOODWARD certification, inspection records, and a certificate of conformance (CoC) issued by siemensplc.com.

Our sourcing policy is unambiguous: we procure exclusively through authorized WOODWARD distributors, certified industrial surplus channels with full chain-of-custody documentation, and direct OEM decommissioning programs from verified power generation and oil & gas operators. We do not source from unverified secondary markets or grey-channel brokers.

100% Genuine Parts Commitment: Each unit is accompanied by a siemensplc.com Certificate of Authenticity. If any unit is found to be non-genuine within the warranty period, we provide full replacement and cover all associated logistics costs — no dispute process, no deductibles.

Xiamen Customs Compliance: All exports are processed through Xiamen Customs with full commercial invoice, packing list, certificate of origin, and HS code declaration. We support multi-currency invoicing in USD, EUR, CNY, and HKD, and accept T/T bank transfer, L/C, and major international payment platforms. Our export documentation package is structured to meet the import compliance requirements of EU, US, Middle East, and Southeast Asian customs authorities.

Strategic Sourcing from Xiamen

Xiamen is one of China’s five Special Economic Zones and home to one of the country’s most active international container ports — Xiamen Port, ranked among the top 15 globally by container throughput. For industrial automation components destined for power plants, petrochemical facilities, and marine operators across Asia-Pacific, the Middle East, and Europe, Xiamen’s logistics infrastructure provides a material advantage in transit time and freight cost compared to sourcing from inland Chinese distribution centers or European intermediaries.

Direct air freight connections from Xiamen Gaoqi International Airport serve major industrial hubs including Singapore, Dubai, Rotterdam, Houston, and Tokyo, with transit times of 3–5 days for DHL Express and FedEx International Priority shipments. For buyers in Southeast Asia — a region with rapidly expanding gas-fired power generation capacity — Xiamen-origin shipments typically arrive 2–4 days faster than equivalent shipments from European or North American distribution points, at 30–50% lower freight cost. Our logistics team coordinates with freight forwarders experienced in handling industrial automation equipment, ensuring proper packaging, ESD protection, and export documentation for sensitive electronic modules.

For procurement teams managing multi-site MRO programs across different regions, our Xiamen base enables consolidated shipment of mixed automation hardware — combining WOODWARD, Siemens, ABB, and other brand components into a single export consignment, reducing per-unit freight cost and simplifying import clearance at the destination port.

Contact Information

To request a quote, confirm stock availability, or discuss a blanket order arrangement for your MRO program, contact our industrial supply team directly:

Response time: within 24 business hours. Expedited response available for plant-down and AOG situations.

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.