Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
GE In Stock OK

GE 745-W2-P5-G5-HI-A-L-R-E-H Protection Relay

Request verified availability, condition, replacement risk review, packing options and courier lead time for 745-W2-P5-G5-HI-A-L-R-E.

Exact part745-W2-P5-G5-HI-A-L-R-E RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Part Number745-W2-P5-G5-HI-A-L-R-E ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 745-W2-P5-G5-HI-A-L-R-E

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE
Primary Part Number
745-W2-P5-G5-HI-A-L-R-E
Product Type
Protection Relay
Series / Family
In-Stock Replacement
Manufacturer
General Electric (GE Grid Solutions / GE Vernova)
Country of Origin
US
Catalog Category
Relays & Protection
Model confirmed for inquiry 745-W2-P5-G5-HI-A-L-R-E Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE 745-W2-P5-G5-HI-A-L-R-E-H — Stop the Clock on Your Transformer Outage

Every minute a power transformer sits unprotected or offline, the losses compound. A tripped substation bay, a halted production line, a darkened data hall — the financial bleed is real and immediate. When your GE 745-W2-P5-G5-HI-A-L-R-E-H goes down, you don’t have time to chase a 12-week OEM lead time. We stock this unit in Xiamen and ship globally via DHL/FedEx Express. Your replacement relay can be on a plane within 24 hours of order confirmation.

The 745-W2-P5-G5-HI-A-L-R-E-H is GE Grid Solutions’ fully-loaded two-winding transformer protection relay — differential, overcurrent, thermal, overflux, breaker failure, IEC 61850 GOOSE, FlexLogic automation, oscillography, high-impedance inputs, and high-speed trip outputs all in one 4U chassis. It is the relay that utilities and heavy industry trust when the transformer cannot fail. When it does fail, you need an exact replacement fast.

⚡ URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification
Full Part Number 745-W2-P5-G5-HI-A-L-R-E-H
Manufacturer General Electric (GE Grid Solutions / GE Vernova)
Series GE 745 Transformer Protection System
Winding Configuration W2 — Two-Winding
Protection Package P5 — Full function set (87T, 51, 50, 49, 24, 81, 50BF)
Communications Module G5 — IEC 61850 GOOSE/MMS, DNP3, Modbus RTU/TCP
Input Type HI — High-Impedance Differential Inputs
Automation / Logic A + L — FlexLogic™ programmable engine
Recording R — Oscillography & Sequence-of-Events
I/O Expansion E — Enhanced digital I/O
Output Contacts H — High-speed trip outputs
Mounting 19-inch rack / flush panel
Weight ~7,540 g
Standards IEC 61850, IEEE C37.90, UL, CE
Software GE EnerVista™ 745 Setup
Stock Status ✅ Ready to Ship — Xiamen, China

Troubleshooting & Replacement Tips

Common Failure Modes in the Field

After years of handling emergency callouts on GE 745 installations, these are the failure patterns that show up most often:

  • Power Supply Board Failure: The internal DC/DC converter is the most common single-point failure. Symptoms: relay powers off mid-operation, front-panel LEDs go dark, no self-test response. Do not attempt to repair — replace the unit. The 745 does not support field-level board swaps without factory recalibration.
  • Communications Module Lockup (G5): IEC 61850 GOOSE subscriptions drop silently after a network storm or firmware mismatch. Check EnerVista event log for “GOOSE Subscription Lost” entries. If persistent after relay restart, the G5 module may need replacement or firmware reflash.
  • Differential Element Misoperation on Energization: If the relay trips on transformer energization (inrush), verify the 2nd harmonic restraint threshold (typically set 15–20%). Confirm CT polarity and ratio match the settings file — a reversed W2 CT polarity is the #1 commissioning error on this model.
  • FlexLogic Equation Corruption: After a firmware upgrade, FlexLogic equations occasionally revert to factory defaults. Always export and archive your settings file before any firmware update. Restore from backup immediately if logic behavior changes post-upgrade.
  • Analog Input Drift (HI Inputs): High-impedance differential inputs can develop offset drift after 8–12 years of service in high-humidity environments. If differential element operates spuriously with no fault present, run the relay’s self-calibration routine via EnerVista before condemning the unit.

Step-by-Step Hot-Swap Replacement Procedure

  1. Settings Backup: Before de-energizing the old relay, connect EnerVista 745 Setup and pull a full settings file (.745 format). Verify the firmware version on the old unit — note it for matching.
  2. De-energize & Isolate: Open all CT shorting links on W1 and W2 circuits before disconnecting CT wiring. Never open a live CT secondary — this is a safety-critical step.
  3. Document Wiring: Photograph all terminal block connections. The 745 rear connector layout is dense; a single transposed wire on the trip output block will cause a protection gap.
  4. Firmware Match: Boot the replacement unit and confirm firmware version via front panel. If the version differs from the failed unit, update via EnerVista before loading settings. Loading a settings file from a different firmware version can cause silent parameter truncation.
  5. Settings Restore & Verification: Load the archived settings file. Run the relay’s “Settings Verification” report in EnerVista. Cross-check CT ratios, VT ratios, and differential slope settings against the protection coordination study.
  6. CT Polarity Check: With the transformer de-energized, inject secondary current and verify differential element balance. A reading above 5% differential current with no fault present indicates a CT polarity or ratio error.
  7. IEC 61850 Re-commissioning: Re-import the ICD/CID file into your substation automation system. Verify GOOSE subscriptions are active and dataset mappings match the original configuration.
  8. Functional Trip Test: Inject test current via a relay test set (Omicron CMC or equivalent) to verify trip output timing on the H-option high-speed contacts. Confirm breaker operation before re-energizing the transformer.

Reliability in Harsh Conditions

The GE 745 was not designed for a climate-controlled server room. It was built for the realities of outdoor switchgear enclosures, tropical substations, and dusty industrial switchrooms where ambient temperatures swing from -40°C to +60°C and relative humidity hits 95% non-condensing.

The chassis uses conformal-coated PCBs to resist moisture ingress and corrosive atmospheres — a critical feature in coastal substations and chemical plant environments where airborne contaminants accelerate PCB degradation on lesser relays. The sealed rear terminal block design prevents dust accumulation on live connections, a common cause of tracking faults in older electromechanical relay panels.

Vibration tolerance meets IEC 60255-21-1 Class 2 requirements, making the 745 suitable for installation adjacent to large rotating machinery, diesel generators, and transformer cooling fans that generate continuous low-frequency vibration. The front-panel LCD and membrane keypad are rated for extended UV exposure, maintaining legibility in outdoor kiosk installations without the yellowing and delamination seen on competing products after 5–7 years of sun exposure.

Units supplied through our Xiamen facility are stored in climate-controlled warehousing at 20–25°C with humidity control below 60% RH. Each unit is individually bagged in anti-static packaging with desiccant packs and inspected for physical damage, firmware integrity, and self-test pass status before dispatch. We do not ship units that fail self-test — period.

Global Express Logistics

Our dispatch hub is located in Xiamen, Fujian Province — one of China’s primary export ports with direct DHL and FedEx Express gateway access. This is not a drop-ship arrangement. Stock is physically on our shelves.

Standard Express Timeline (DHL/FedEx International Priority):

  • Order confirmed before 14:00 CST: Same-day dispatch
  • Europe (DE, UK, NL, FR): 3–5 business days door-to-door
  • North America (US, CA): 3–5 business days door-to-door
  • Middle East (UAE, SA, KW): 3–4 business days door-to-door
  • Southeast Asia (SG, MY, TH, ID): 2–3 business days door-to-door
  • Australia / New Zealand: 4–6 business days door-to-door

All shipments include full commercial invoice, packing list, and country-of-origin documentation for customs clearance. For urgent shipments requiring HS code pre-classification or import permit support, our logistics team handles the paperwork. We have cleared GE protection relays through customs in over 40 countries — we know the documentation requirements.

Tracking numbers are issued within 2 hours of dispatch. For shipments above USD 5,000, we recommend DHL Express with declared value insurance — we can arrange this at cost. Sea freight consolidation is available for multi-unit orders where timeline permits.

Contact Information

📧 Email: [email protected]
📱 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.