Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Yokogawa In Stock OK

YOKOGAWA AAT141-S00 S2 Analog I/O Module – CENTUM VP

Request verified availability, condition, replacement risk review, packing options and courier lead time for AAT141-S00.

Exact partAAT141-S00 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandYokogawa Part NumberAAT141-S00 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ AAT141-S00

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Yokogawa
Primary Part Number
AAT141-S00
Product Type
Analog I/O Module
Series / Family
CENTUM VP
Manufacturer
YOKOGAWA Electric Corporation
Country of Origin
JP
Catalog Category
I/O Modules
Operating Temp.
0°C to +55°C
Warranty
12 months against manufacturing defects
Compliance
CE, UL, RoHS, IEC 61508 SIL 2 capable
Model confirmed for inquiry AAT141-S00 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

YOKOGAWA AAT141-S00 S2: Multi-Channel Analog Input Module for CENTUM VP Distributed Control Architecture

The AAT141-S00 S2 is a multi-channel analog input module engineered for deployment within YOKOGAWA’s CENTUM VP Field Control Station (FCS). Its primary function in the control loop is signal conditioning and analog-to-digital conversion of field transmitter outputs — typically 4–20 mA current loops or 1–5 V voltage signals — into digitized process values that the FCS CPU can act upon within its deterministic scan cycle. The module sits on the node unit backplane and communicates with the FCS processor over the internal V-net/IP bus, contributing zero additional latency beyond the backplane arbitration window. In a typical refinery or chemical plant DCS topology, this module serves as the first point of data integrity: any noise, ground loop, or signal drift that is not rejected here propagates directly into the control algorithm. The AAT141-S00 S2 addresses this with per-channel optical isolation rated at 500 V DC, suppressing common-mode interference from long cable runs in electrically noisy field environments.

The S2 hardware revision incorporates an updated analog front-end with a 16-bit successive approximation ADC per channel group, delivering a resolution of approximately 0.0015% of full scale — sufficient for precision flow, pressure, and temperature measurement in closed-loop PID applications. Input range switching is performed via software configuration in CENTUM VP’s Engineering Environment (ENG), eliminating the need for physical jumper changes during range reconfiguration. This reduces maintenance intervention time and the associated risk of wiring errors during range adjustment.

Real-time Stock & RFQ: [email protected] | WhatsApp: +86 18359268345

Technical Parameters

Parameter Specification
Part Number AAT141-S00 S2
Manufacturer YOKOGAWA Electric Corporation
Module Category Analog Input Module
Compatible Platform CENTUM VP / CS 3000 Field Control Station
Number of Input Channels 16 channels (single-ended) / 8 channels (differential)
Input Signal Range 4–20 mA, 1–5 V DC (software-selectable per channel)
ADC Resolution 16-bit
Accuracy ±0.1% of full scale at 25°C
Channel Isolation 500 V DC optical isolation (channel-to-backplane)
Scan Period Configurable: 100 ms / 200 ms / 500 ms / 1 s
Power Consumption ≤ 4.5 W (from backplane 24 V DC rail)
Operating Temperature 0°C to +55°C
Storage Temperature −25°C to +70°C
Relative Humidity 5% to 95% RH (non-condensing)
Communication Interface CENTUM VP internal V-net/IP backplane bus
Mounting Node unit slot (CENTUM VP ANB10D / ANB11D)
Dimensions (W × H × D) Approx. 30 mm × 200 mm × 230 mm
Weight Approx. 200 g
Compliance CE, UL, RoHS, IEC 61508 SIL 2 capable
Warranty 12 months against manufacturing defects
Country of Origin Japan

Hardware Logical Analysis

The AAT141-S00 S2 implements a distributed analog front-end architecture where each channel pair shares a dedicated instrumentation amplifier stage before multiplexing into the ADC. This design choice avoids the cross-channel settling time penalty common in fully multiplexed front-ends, where a high-amplitude channel can corrupt the reading of an adjacent low-amplitude channel during rapid scanning. The instrumentation amplifier stage provides a common-mode rejection ratio (CMRR) of ≥ 80 dB at 50/60 Hz, which is the dominant interference frequency in industrial power environments.

EMC hardening on this module follows IEC 61000-4 series test criteria. The PCB layout routes analog signal traces on an inner layer sandwiched between ground planes, reducing susceptibility to radiated electric fields. Decoupling capacitors are placed within 2 mm of each amplifier supply pin, and ferrite beads are inserted on the backplane power rails to attenuate high-frequency switching noise originating from adjacent digital modules in the same node unit.

The optical isolation barrier between the field-side analog circuitry and the backplane-side digital logic is implemented using high-speed optocouplers with a propagation delay of < 1 µs, ensuring that the isolation does not introduce measurable phase error into the digitized signal at the configured scan rates. The isolation also provides a defined creepage and clearance distance compliant with IEC 60664-1 for 300 V working voltage environments, covering the majority of industrial field wiring scenarios.

Fault detection logic within the module monitors input current for open-circuit conditions (signal below 3.6 mA) and over-range conditions (signal above 21 mA), generating a channel-level alarm that propagates to the FCS alarm management system without requiring a separate hardware watchdog. This self-diagnostic capability reduces the mean time to detect (MTTD) for field transmitter failures from hours to seconds in continuously scanned loops.

System Integration Benefits

  • Deterministic scan cycle alignment: The module’s configurable scan period synchronizes with the FCS CPU’s control execution cycle, ensuring analog inputs are always sampled at a consistent phase offset relative to the PID calculation — eliminating jitter-induced process variability in tight control loops.
  • Zero-configuration channel range switching: Input range changes are applied through CENTUM VP Engineering Environment without module removal or physical modification, reducing planned maintenance windows and eliminating wiring-error risk during reconfiguration.
  • Integrated open-circuit and over-range diagnostics: Per-channel fault flags are surfaced directly in the CENTUM VP HIS operator display and alarm historian, providing diagnostic transparency without additional field instrumentation or SCADA logic.
  • Hot-swap capability: The module supports online replacement within a powered node unit (subject to FCS configuration), allowing corrective maintenance without process shutdown — a critical requirement in continuous-process industries.
  • SIL 2 capable architecture: When deployed in a redundant FCS configuration with appropriate proof-test intervals, the AAT141-S00 S2 contributes to a Safety Instrumented Function (SIF) meeting IEC 61508 SIL 2 requirements, enabling use in safety-critical measurement loops.
  • Backward compatibility with CS 3000: The module’s electrical and mechanical interface is compatible with YOKOGAWA CS 3000 node units, protecting capital investment in existing DCS infrastructure during phased migration to CENTUM VP.
  • Reduced field wiring complexity: Support for both current and voltage input types on the same module eliminates the need for separate module types for mixed transmitter installations, reducing spare parts inventory and slot consumption in the node unit.
  • Alarm prioritization support: Channel-level diagnostic alarms can be assigned priority levels within CENTUM VP’s alarm management framework, enabling operators to distinguish between process alarms and instrument health alarms without custom logic development.

Quality Assurance & Global Logistics

Every AAT141-S00 S2 unit supplied by siemensplc.com is sourced through verified distribution channels and subjected to a structured incoming inspection protocol. Physical inspection covers label integrity, connector pin condition, hardware revision marking, and housing seal condition. Units are cross-referenced against YOKOGAWA’s published hardware revision history to confirm the S2 designation is correctly matched to the physical PCB revision.

Functional verification is performed where test fixtures are available, confirming backplane connector continuity and basic power-on self-test (POST) completion. Units that do not pass inspection are quarantined and not dispatched. Each shipment includes a siemensplc.com inspection record, commercial invoice, and packing list. OEM certificates of conformity and IEC 61508 functional safety documentation are available upon written request for safety-critical procurement processes.

Logistics operations are based in Xiamen, China, with established carrier accounts with DHL Express, FedEx International Priority, and UPS Worldwide for time-critical shipments. Standard in-stock orders are dispatched within 1–3 business days. Sea freight consolidation is available for bulk project orders requiring cost-optimized delivery. Export documentation — including HS code classification, certificate of origin, and customs invoice — is prepared in compliance with applicable export control regulations for each destination country.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
Location: Xiamen, China
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.