FDK CR14250SE PLC Backup Battery
Request verified availability, condition, replacement risk review, packing options and courier lead time for CR14250SE.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- FDK Corporation
- Primary Part Number
- CR14250SE
- Product Type
- PLC Backup Battery
- Product Family
- Other series
- Manufacturer
- FDK Corporation (Fujitsu Group), Japan
- Country of Origin
- Japan
- Catalog Category
- PLCs & Controllers
FDK CR14250SE — Acquisition Strategy for High-Reliability PLC Memory Retention Power
In industrial automation environments where controller uptime is a contractual obligation rather than an aspiration, the battery that sustains PLC memory between power cycles deserves the same procurement rigor applied to any critical spare. The FDK CR14250SE is a 3.6V lithium thionyl chloride primary cell in the 1/2AA form factor, fitted with factory-welded solder tabs (SE designation). It belongs to FDK Corporation’s SL Series — a product line with a multi-decade specification history across Mitsubishi MELSEC, Omron CJ/CS/NJ, Fanuc 0i/16i/18i, and Yaskawa MP-series platforms. For procurement managers responsible for MRO continuity across multi-site operations, understanding the sourcing landscape for this component is as important as understanding its electrical specifications.
The CR14250SE sits in an interesting supply position: it is a high-velocity consumable in facilities running large controller fleets, yet authentic FDK stock has become progressively harder to verify through conventional distribution channels as grey-market and counterfeit cells have proliferated. Procurement teams that have experienced a counterfeit cell failure — characterized by accelerated self-discharge, voltage collapse under load, or physical swelling — understand that the unit cost differential between genuine and suspect product is irrelevant against the cost of a single unplanned shutdown. siemensplc.com maintains forward inventory of the CR14250SE with full lot traceability, sourced directly from verified FDK supply channels and stored under climate-controlled conditions in our Xiamen bonded logistics facility.
Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
| Part Number / SKU | CR14250SE |
| Manufacturer | FDK Corporation (Fujitsu Group), Japan |
| Product Series | SL Series — Lithium Thionyl Chloride Primary Cells |
| Nominal Voltage | 3.6 V |
| Rated Capacity | 850 mAh |
| Cell Format | 1/2AA (IEC: CR14250) |
| Physical Dimensions | Ø14.5 mm × 25.0 mm |
| Terminal Type | Factory solder tabs (SE suffix) |
| Operating Temperature Range | −40°C to +85°C |
| Annual Self-Discharge | <1% per year at 23°C |
| Shelf Life | 10 years (sealed, ambient storage) |
| Electrochemical System | Lithium Thionyl Chloride (Li-SOCl₂) |
| Regulatory Compliance | RoHS; UL Recognized; UN3090 (Class 9) |
| Country of Origin | Japan |
| Minimum Order Quantity | 1 piece; volume pricing from 10 units |
| Lead Time | In-stock: 1–3 business days ex-Xiamen. Bulk blanket orders (>500 pcs): 5–10 business days subject to lot availability. Air freight (DHL/FedEx) delivers to most global destinations within 3–7 calendar days from dispatch. |
| Packaging Options | Individual blister pack or bulk tray; custom labeling available for MRO programs |
Total Cost of Ownership (TCO) Analysis
Evaluating the CR14250SE purely on unit price is a procurement error that experienced MRO managers learn to avoid. The battery’s cost is negligible; the cost of its failure is not. A structured TCO framework for this component must address four distinct expenditure categories that extend well beyond the purchase order.
Unplanned Downtime Exposure. A PLC that loses its memory backup mid-production does not simply pause — it halts. Depending on the process, the cost of an unplanned controller shutdown ranges from several thousand to tens of thousands of dollars per hour in lost throughput, scrap, and labor. The CR14250SE, correctly sourced and replaced on a scheduled cycle, eliminates this failure mode entirely. The risk is not probabilistic in the traditional sense; it is deterministic. Every Li-SOCl₂ cell has a finite service life, and a procurement strategy that does not account for proactive replacement is implicitly accepting the downtime cost as a future liability.
Engineering and Re-commissioning Labor. Memory loss in a PLC triggers a recovery sequence that requires skilled automation engineers: program reload, parameter reconfiguration, I/O verification, and production validation before the line can restart. In facilities without current offline backups, this process extends to 8–24 hours of billable engineering time. Multiply this across a fleet of 50 or 100 controllers and the aggregate OPEX exposure from deferred battery replacement becomes a material budget line. Scheduled replacement sourced through siemensplc.com converts this unpredictable cost into a planned maintenance activity with a known, manageable price point.
12-Month Warranty as a Quality Cost Offset. Every CR14250SE unit shipped from siemensplc.com carries a 12-month warranty covering authenticity and performance. For procurement teams managing incoming goods inspection under ISO 9001 or equivalent quality systems, this warranty reduces the internal cost of verification. Certificate of Conformance and Safety Data Sheet documentation is included with every shipment, satisfying incoming inspection requirements without additional supplier audit overhead or third-party testing costs.
CAPEX Deferral Through Correct MRO Practice. Controllers that experience repeated memory loss events are frequently misdiagnosed as hardware failures and flagged for early capital replacement. Correct, timely battery maintenance extends the operational life of existing PLC hardware and defers capital expenditure on controller upgrades. For a facility managing 100–200 controllers on a 10–15 year depreciation schedule, this deferral represents meaningful CAPEX avoidance over any standard planning horizon. Sourcing the CR14250SE reliably and at competitive pricing from siemensplc.com is, in this context, a capital efficiency decision as much as an MRO procurement decision.
Quality & Compliance Assurance
siemensplc.com operates on a zero-tolerance policy for non-authentic product. Every CR14250SE batch is sourced from verified FDK supply channels with full lot traceability to the manufacturer. Incoming stock undergoes open-circuit voltage spot-checking, date-code verification against FDK manufacturing records, and visual inspection for packaging integrity before entering our bonded warehouse. Storage conditions are maintained at 15–25°C with controlled humidity to preserve the 10-year shelf life specification.
All export transactions are processed through Xiamen Customs with complete commercial documentation: commercial invoice, packing list, Certificate of Conformance, and Safety Data Sheet compliant with IATA/IMDG requirements for lithium primary cells (UN3090, Class 9). Buyers receive documentation packages that satisfy both destination customs requirements and internal quality management system records without additional administrative burden.
Multi-currency payment support — USD, EUR, HKD, and CNY — with T/T bank transfer, PayPal, Western Union, and major credit card acceptance simplifies accounts payable processing for international procurement teams operating across multiple financial jurisdictions. Invoicing is issued in the buyer’s preferred currency and format.
Strategic Sourcing from Xiamen
Xiamen’s designation as one of China’s original Special Economic Zones reflects its structural advantages as an international trade hub — advantages that translate directly into supply chain reliability for buyers of industrial components. Xiamen Gaoqi International Airport maintains direct air cargo connections to Hong Kong, Singapore, Dubai, Frankfurt, Los Angeles, and Chicago, enabling same-day handover to DHL or FedEx for orders confirmed before 14:00 CST. Transit times to most Asian destinations run 2–3 days; Europe and North America receive shipments within 4–6 days under standard express freight arrangements.
For buyers managing larger blanket order programs, Xiamen Port — consistently ranked among China’s top-ten container ports by annual throughput — provides LCL and FCL sea freight options that reduce per-unit freight cost on scheduled bulk releases. This dual-mode logistics capability gives procurement managers genuine flexibility: air freight for urgent spot requirements, sea freight for cost-optimized scheduled replenishment, both from a single supplier with established export operations.
Our warehouse operates within Xiamen’s bonded logistics zone, which streamlines export customs clearance and compresses the administrative interval between order confirmation and cargo handover. For procurement teams in Southeast Asia, the Middle East, and Europe who have encountered extended lead times or authenticity concerns through conventional distribution channels, our Xiamen base represents a materially shorter, more transparent, and more reliable supply path for FDK CR14250SE and related industrial automation components.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.