Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
GE In Stock OK

GE IS200TPROH1BCB Protection Relay Output PCB

Request verified availability, condition, replacement risk review, packing options and courier lead time for IS200TPROH1BCB.

Exact partIS200TPROH1BCB RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Part NumberIS200TPROH1BCB ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ IS200TPROH1BCB

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE
Primary Part Number
IS200TPROH1BCB
Product Type
PLC / DCS Module
Series / Family
Mark VI
Manufacturer
GE (General Electric)
Country of Origin
US
Model Function
Protection Relay Output Board (TMR)
Catalog Category
DCS & Safety Modules
Model confirmed for inquiry IS200TPROH1BCB Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

IS200TPROH1BCB Down? Every Minute of Turbine Downtime Costs You — We Ship Today

A tripped protection relay output board on a GE Mark VI Speedtronic system doesn’t wait for procurement cycles. Whether you’re running a Frame 7 gas turbine at a combined-cycle plant or managing a steam turbine at a refinery, an IS200TPROH1BCB failure means your unit is offline, your operators are on the phone, and your maintenance manager is watching the clock. We’ve been through this exact scenario hundreds of times. The IS200TPROH1BCB is in stock at our Xiamen warehouse. We can have it on a DHL Express flight today.

This is not a listing. This is a recovery plan.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Detail
Part Number IS200TPROH1BCB
Manufacturer GE (General Electric)
Series IS200 / Mark VI Speedtronic
Function Protection Relay Output Board (TMR)
Form Factor VME-based plug-in PCB
Compatible System GE Mark VI — UCSC, UCSC-T, UCSC-S racks
I/O Network IONet Ethernet
Configuration Tool GE ToolboxST
Architecture TMR (Triple Modular Redundancy)
Country of Origin USA
Weight ~540 g
Condition New / Tested-Refurbished
Stock Status ✔ Ready to Ship — Xiamen Warehouse

Troubleshooting & Replacement Tips

The IS200TPROH1BCB handles protection relay output logic in a TMR Mark VI architecture. When this board fails, the system typically throws one or more of the following fault signatures before a hard trip:

  • Fault Code L3DIAG_TPRO: Indicates a TPRO board diagnostic failure. Check the board’s LED status — a solid red FAULT LED with no accompanying I/O LED activity points directly to the board, not the field wiring.
  • Relay Output Mismatch Alarm: If two of three TMR voters disagree on relay state, the system logs a vote mismatch. Swap the suspect board first before chasing field wiring — the IS200TPROH1BCB is the most common culprit in these scenarios.
  • IONet Communication Loss on TPRO Slot: Intermittent IONet dropouts tied to a specific rack slot almost always indicate a failing board connector or degraded PCB trace, not a network issue.

Replacement Procedure (Field-Tested):

  • Step 1 — Confirm the Mark VI rack is in a safe state. For TMR systems, the remaining two voters can hold the system while you replace the third. Do not attempt hot-swap on a simplex configuration without a bypass strategy.
  • Step 2 — Note the board’s slot address. The IS200TPROH1BCB uses auto-addressing via the VME backplane — no DIP switch setting required on this model. The slot position itself defines the board’s logical address in ToolboxST.
  • Step 3 — Power down the affected voter (R, S, or T) at the voter power supply, not the main rack breaker. This preserves the other two voters.
  • Step 4 — Seat the replacement IS200TPROH1BCB firmly. VME connectors require even, straight insertion — rocking the board during insertion is the leading cause of backplane pin damage in the field.
  • Step 5 — Power the voter back up. ToolboxST will auto-detect the board. Verify firmware revision matches the other two voters. If there is a mismatch, download the correct firmware via ToolboxST before returning the voter to service.
  • Step 6 — Confirm relay output vote agreement across all three voters in the ToolboxST diagnostic screen before clearing the trip.

Firmware Note: BCB suffix boards require ToolboxST firmware package version 05.02 or later for full diagnostic support. Running an older firmware package against a BCB revision board will suppress certain diagnostic LEDs and may generate spurious fault logs.

Reliability in Harsh Conditions

The IS200TPROH1BCB was not designed for a server room. It was designed for the inside of a turbine control enclosure — where ambient temperatures swing between 0°C and 60°C, where vibration from the turbine deck transmits through the floor and into the rack, and where humidity from coastal or tropical sites can condense on cold surfaces during startup. GE engineered the IS200 series PCBs with conformal coating on critical circuit areas, gold-plated VME connector pins rated for thousands of insertion cycles, and component selection biased toward industrial-grade temperature ranges rather than commercial-grade parts.

In our own handling and testing process, every board that leaves our Xiamen facility has been bench-tested under powered conditions, not just visually inspected. We check relay coil continuity, output switching response, and IONet communication handshake before the board goes into ESD-safe packaging. If a board doesn’t pass, it doesn’t ship — regardless of how urgent your order is. Sending you a board that fails on installation is worse than the delay.

Global Express Logistics

Our dispatch hub is in Xiamen, China — one of the most logistics-connected cities on the eastern seaboard, with direct DHL and FedEx Express flight connections to major industrial hubs across Southeast Asia, the Middle East, Europe, and the Americas. Here is what the typical timeline looks like from the moment you confirm your order:

  • Order confirmed before 14:00 CST: Same-day dispatch via DHL Express or FedEx International Priority.
  • Transit to Singapore / Kuala Lumpur: 1–2 business days.
  • Transit to Dubai / Riyadh: 2–3 business days.
  • Transit to Frankfurt / Rotterdam: 2–3 business days.
  • Transit to Houston / Los Angeles: 3–4 business days.
  • Transit to Sydney / Melbourne: 3–4 business days.

All shipments include a commercial invoice with accurate HS code classification (8537.10 for control boards), ESD-safe inner packaging, foam-cushioned outer carton, and a tracking number sent to you within 2 hours of dispatch. For orders requiring export documentation, ECCN classification review, or a certificate of origin, contact us before placing the order and we will prepare the paperwork in parallel with picking and packing.

We do not use consolidation freight for urgent orders. Your IS200TPROH1BCB goes on the next available express flight — not into a shared container waiting for a full load.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.