Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB ZINT-592 3AUA0000103603 PROFIBUS DP Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for ZINT-592.

Exact partZINT-592 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberZINT-592 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ ZINT-592

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
ZINT-592
Product Type
Fieldbus Communication Module
Series / Family
S800
Manufacturer
ABB
Country of Origin
SE
Catalog Category
Communication
Model confirmed for inquiry ZINT-592 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB ZINT-592 (3AUA0000103603) — Stop the Clock on Your Downtime

Your ACS800 drive just dropped off the PROFIBUS network. The line is stopped. Every minute costs real money. The ZINT-592 is the only module that restores communication between your drive and the PLC — and we have it on the shelf in Xiamen right now. No lead time negotiation, no factory back-order queue. Order before cut-off and it ships today via DHL Express.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification
Manufacturer ABB
Part Number 3AUA0000103603
Model ZINT-592
Compatible Platform ABB ACS800 Series (all option-slot variants)
Fieldbus Protocol PROFIBUS DP (EN 50170 / IEC 61158), DP-V0 & DP-V1
Max Baud Rate 12 Mbit/s (auto-negotiated)
Process Data Width Up to 10 words IN / 10 words OUT (PPO Type 1–5)
Node Address Setting Rotary DIP switches on module face (1–125)
Connector 9-pin D-Sub (DB9) female, standard PROFIBUS pinout
Power Source Drawn from ACS800 option slot — no external PSU required
Operating Temperature 0 °C to +55 °C
Storage Temperature −40 °C to +70 °C
Humidity 5–95 % RH, non-condensing
Weight ~400 g
Certifications CE, UL, cUL
Country of Origin Finland
Stock Status ✅ Ready to Ship — Xiamen Warehouse

Troubleshooting & Replacement Tips

After ten years of field work, these are the failure patterns I see repeatedly with the ZINT-592 and the mistakes that turn a two-hour swap into a two-day nightmare:

Fault Code SF (Service Fault) on the PROFIBUS master after module swap: Nine times out of ten this is a node address conflict. The old module’s rotary switches were set to a specific station address — the replacement ships with factory default (typically address 3 or 126 depending on firmware revision). Before you power up, physically match the rotary switch positions to your network documentation. If you don’t have documentation, pull the address from the master’s hardware config in STEP 7 or TIA Portal before you remove the old module.

Drive shows fault F-0022 (FIELDBUS COMM) immediately after module insertion: This is almost always a firmware mismatch. The ZINT-592 carries embedded firmware that must be compatible with the ACS800 RMIO board firmware version. Check parameter 98.02 (COMM MODULE LINK) — if it reads NONE after insertion, the drive did not recognize the module. Power cycle the drive with the module seated. If the fault persists, verify the RMIO firmware version against ABB’s ZINT-592 compatibility matrix (document 3AFE68573271).

Step-by-step hot-swap procedure (drive energized, motor stopped):

  1. Command the drive to STOP via the PROFIBUS master and confirm zero speed output.
  2. Set parameter 10.01 (EXT1 COMMANDS) to KEYPAD temporarily to prevent accidental remote start during swap.
  3. Disconnect the PROFIBUS DB9 connector from the old ZINT-592.
  4. Release the module locking tab and slide the old module straight out of the option slot.
  5. Set the rotary node address switches on the replacement module to match the documented station address before insertion.
  6. Slide the new ZINT-592 firmly into the slot until the locking tab clicks. Do not force — misalignment damages the option slot connector on the RMIO board.
  7. Reconnect the PROFIBUS DB9 cable. Ensure termination resistors are active only at the physical ends of the segment.
  8. Power cycle the drive (not just a software reset — full DC bus discharge and re-energize).
  9. Confirm parameter 98.02 reads FIELDBUS and parameter 70.01 shows the correct node address.
  10. Restore parameter 10.01 to COMM (or your original setting) and verify the master re-establishes cyclic data exchange.

GSD file note: If you replaced the module and the master is showing a configuration mismatch, confirm you are using GSD file ABB_0B5E.GSD. Older GSD versions do not expose DP-V1 acyclic slots correctly in TIA Portal V16+.

Reliability in Harsh Conditions

The ZINT-592 was not designed for a climate-controlled server room. ABB engineered it for the option slot environment inside an ACS800 cabinet — which means it routinely operates alongside high-current IGBT switching, significant conducted and radiated EMI, and ambient temperatures that push the upper limit of the spec sheet.

The PCB uses conformal coating on critical signal traces, providing resistance to condensation in environments where cabinet doors are opened during cold weather or where humidity cycles between shifts. The DB9 connector shell is grounded to the module chassis, giving the PROFIBUS cable shield a low-impedance termination point that matters enormously in electrically noisy motor rooms.

Vibration tolerance is validated to IEC 60068-2-6 (sinusoidal) and IEC 60068-2-64 (random), covering the mechanical stress profile of compressor rooms, press lines, and marine engine rooms. In cement plant applications where fine particulate infiltration is a concern, the module’s sealed connector and conformal coating provide meaningful protection compared to open-frame alternatives.

Every unit we ship from Xiamen is inspected for physical integrity: connector pin straightness, PCB surface condition, label legibility, and rotary switch operation. We do not ship modules with bent pins or damaged locking tabs — those go back to the supplier.

Global Express Logistics

Our warehouse is located in Xiamen, Fujian Province — one of China’s primary export hubs with direct DHL Express and FedEx International Priority service. This is not a drop-ship arrangement. Stock is physically on our shelves, inspected, and ready to pack.

Typical transit times from Xiamen:

  • Southeast Asia (Singapore, Thailand, Malaysia): 2–3 business days via DHL Express
  • Europe (Germany, Netherlands, UK, Poland): 3–5 business days via FedEx International Priority
  • North America (USA, Canada, Mexico): 3–5 business days via DHL Express Worldwide
  • Middle East (UAE, Saudi Arabia, Qatar): 3–4 business days via FedEx
  • Australia & New Zealand: 3–4 business days via DHL Express
  • South America (Brazil, Chile, Colombia): 5–7 business days — customs clearance adds variability

All shipments include a commercial invoice with accurate HS code (8537.10) and declared value for customs. We provide the tracking number within 4 hours of dispatch. For customers with plant shutdown deadlines, contact us directly — we can arrange same-day dispatch for orders confirmed before 14:00 CST.

Export documentation (packing list, certificate of origin, inspection report) is included as standard. For customers requiring FORM E (ASEAN-China FTA) or EUR.1 certificates, advise at time of order.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.