Allen-Bradley 81000-199-52-R Weigh Scale Module
Request verified availability, condition, replacement risk review, packing options and courier lead time for 81000-199-52-R.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- Allen-Bradley
- Primary Part Number
- 81000-199-52-R
- Product Type
- Weigh Scale Module
- Product Family
- Other series
- Manufacturer
- Allen-Bradley / Rockwell Automation
- Country of Origin
- US
- Catalog Category
- PLCs & Controllers
- Warranty
- 12 months from invoice date
- Compliance
- CE, UL (confirm against current datasheet)
Allen-Bradley 81000-199-52-R Weigh Scale Module: A Procurement Manager’s Acquisition Strategy
For procurement teams operating in process-intensive industries — food & beverage, chemical batching, bulk material handling, or pharmaceutical manufacturing — the Allen-Bradley 81000-199-52-R represents a mission-critical asset. This rack-mounted weigh scale module interfaces directly with Allen-Bradley PLC backplanes, delivering high-resolution load cell signal conditioning and real-time weight data to the host controller. When this component fails or becomes unavailable, entire production lines can halt within minutes.
At siemensplc.com, we approach this SKU not merely as a line item but as a supply chain risk variable. Whether your facility runs this module as a high-turnover consumable or relies on it as a low-volume, hard-to-source legacy component, our sourcing infrastructure is built to respond. We maintain active relationships with certified surplus distributors, authorized channel partners, and international logistics networks — ensuring that your requisition is fulfilled with speed, traceability, and commercial confidence.
📩 Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
| Parameter | Detail |
|---|---|
| Part Number | 81000-199-52-R |
| Manufacturer | Allen-Bradley / Rockwell Automation |
| Module Category | Weigh Scale / Analog Input Module |
| Form Factor | Rack-mount plug-in module |
| Input Signal | Load cell / strain gauge (mV/V) |
| Excitation Voltage | 5–10 VDC (load cell excitation) |
| Communication Interface | Proprietary Allen-Bradley backplane bus |
| Compatible Platforms | PLC-5 series (native); SLC 500 (verify slot/backplane) |
| Resolution | High-resolution A/D conversion |
| Unit Weight | Approx. 3,400 g |
| Compliance | CE, UL (confirm against current datasheet) |
| Lifecycle Status | Legacy / End-of-Life (Rockwell Automation) |
| Standard Lead Time (In-Stock) | 1–3 business days from Xiamen warehouse |
| Extended Lead Time (Sourced) | 7–18 business days via global procurement network |
| Warranty | 12 months from invoice date |
| Origin | United States (manufactured); dispatched from Xiamen, China |
Lead times are indicative and subject to real-time stock confirmation. Contact us for a binding delivery commitment before raising your purchase order.
Total Cost of Ownership (TCO) Analysis
Procurement decisions for industrial automation components are rarely about unit price alone. The true financial exposure lies in what happens when a module fails unexpectedly — and how long it takes to restore production. For the Allen-Bradley 81000-199-52-R, a TCO-aware sourcing strategy must account for three cost dimensions: acquisition cost, downtime cost, and maintenance cost.
Downtime Risk Reduction: In a mid-scale batching facility, an unplanned line stoppage caused by a failed weigh scale module can cost between USD 5,000 and USD 40,000 per hour depending on throughput and product value. The 81000-199-52-R is a legacy component — meaning OEM replacement channels are constrained. Procurement teams that rely solely on the original manufacturer’s distribution network often face lead times of 4–12 weeks for end-of-life parts. By contrast, siemensplc.com maintains pre-positioned stock and an active global sourcing desk, reducing your mean time to replacement (MTTR) from weeks to days. This single variable can represent tens of thousands of dollars in avoided production losses per incident.
CAPEX Optimization: Replacing an entire PLC rack or migrating to a newer platform (e.g., ControlLogix 1756 series) to accommodate a discontinued module carries significant capital expenditure — often USD 15,000–80,000 per line when engineering, commissioning, and software re-validation costs are included. Sourcing a genuine 81000-199-52-R replacement through siemensplc.com allows your facility to defer that migration investment, preserving CAPEX budget for higher-priority modernization projects.
OPEX Reduction via Warranty Coverage: Our 12-month warranty on every unit eliminates the cost of repeat procurement within the warranty window. For maintenance teams managing multiple lines, this translates directly into reduced spare parts budget volatility. A single warranty claim honored — rather than a second purchase at market price — can recover the full cost of the original procurement. Combined with our quality inspection protocol, the probability of early failure is materially lower than unverified surplus channels.
Inventory Carrying Cost: We advise clients to evaluate a consignment or blanket order arrangement for high-criticality legacy modules. By reserving stock at siemensplc.com under a forward purchase agreement, your facility avoids the carrying cost of holding physical spares on-site while guaranteeing availability within 24–48 hours. This model is particularly effective for multi-site operations where the 81000-199-52-R appears across several production lines.
Quality & Compliance Assurance
- 100% Genuine Parts Commitment: Every Allen-Bradley 81000-199-52-R unit supplied by siemensplc.com is sourced exclusively from traceable, certified channels. We do not deal in counterfeit, cloned, or non-OEM components. Supplier documentation and batch traceability records are available upon request for regulated industries.
- Pre-Shipment Inspection: Each unit undergoes visual inspection, functional verification, and packaging integrity assessment before dispatch. Units failing inspection are quarantined and not shipped.
- Xiamen Customs Compliance: All international shipments are processed through Xiamen Customs with full commercial invoice documentation, accurate HS code classification, and compliant export declarations. This ensures smooth clearance at destination ports and eliminates the risk of customs holds that can add days to your delivery timeline.
- Multi-Currency Payment Support: We accept USD, EUR, HKD, CNY, and other major currencies. Wire transfer, PayPal, and trade finance arrangements are available for qualified buyers. Invoices are issued in your preferred currency with full VAT/tax documentation where applicable.
- Anti-Counterfeit Protocol: Our procurement team applies a multi-point authentication check on all legacy Allen-Bradley components, including label verification, date code analysis, and physical inspection against known OEM specifications.
Strategic Sourcing from Xiamen
Xiamen is one of China’s premier international trade and logistics hubs, home to Xiamen Gaoqi International Airport and the Port of Xiamen — both ranked among the top freight gateways in Southeast China. For industrial buyers in Europe, Southeast Asia, the Middle East, and the Americas, Xiamen offers a compelling combination of transit speed, freight cost efficiency, and customs infrastructure.
Our warehouse and operations center in Xiamen provides direct access to major express carriers (DHL, FedEx, UPS, TNT) and sea freight consolidators. Standard air freight to European destinations averages 3–5 business days; to North America, 4–7 business days; to Southeast Asia, 2–4 business days. For time-critical orders, same-day dispatch is available for in-stock units confirmed before 14:00 CST.
Beyond logistics, Xiamen’s position as a free trade zone participant means that certain export procedures are streamlined, reducing administrative lead time between order confirmation and physical dispatch. For buyers operating under just-in-time (JIT) procurement models, this geographic and regulatory advantage translates into a measurable reduction in total order cycle time.
siemensplc.com has built its fulfillment infrastructure around the needs of B2B industrial buyers — not consumer e-commerce. Every shipment is accompanied by a commercial invoice, packing list, and certificate of origin. For buyers requiring additional documentation (e.g., MSDS, test reports, or third-party inspection certificates), these can be arranged at the time of order.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.