Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
GE Automation In Stock OK

GE IC695CPU320 PLC CPU Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for IC695CPU320.

Exact partIC695CPU320 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Automation Part NumberIC695CPU320 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ IC695CPU320

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE Automation
Primary Part Number
IC695CPU320
Product Type
PLC CPU Module
Series / Family
PACSystems
Country of Origin
US
Catalog Category
PLCs & Controllers
Operating Temp.
0°C to 60°C
Warranty
12 months from date of shipment
Model confirmed for inquiry IC695CPU320 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE IC695CPU320: Strategic Procurement of a High-Availability RX3i CPU for Industrial Operations

Procurement decisions for mission-critical PLC hardware carry consequences that extend well beyond the initial purchase order. The GE IC695CPU320 — a 320 MHz dual-core CPU module within the PACSystems RX3i platform — sits at the intersection of high demand and constrained OEM availability. For maintenance engineers managing aging DCS/PLC infrastructure, and for project managers commissioning new control systems, the sourcing strategy for this module directly determines both capital expenditure exposure and long-term operational risk.

At siemensplc.com, we operate as a specialized third-party industrial automation supplier with deep inventory access across GE Automation’s PACSystems product family. Our Xiamen-based operations give us direct access to verified surplus channels, authorized distributor networks, and cross-border logistics infrastructure — enabling us to fulfill IC695CPU320 orders where OEM lead times stretch to 16–26 weeks or longer. Whether your facility runs a single RX3i rack or a multi-site SCADA architecture, we provide the supply chain continuity that keeps your operations moving.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Part Number IC695CPU320
Brand GE Automation (now Emerson / Proficy)
Platform PACSystems RX3i
Processor 320 MHz Dual-Core (logic + communications isolation)
User RAM 64 MB
Non-Volatile Storage Internal flash + CompactFlash card slot (optional)
Communications Dual 10/100 Mbps Ethernet, RS-232 serial
Supported Protocols SRTP, Modbus TCP, EGD, DNP3 (optional license)
Programming Standard IEC 61131-3 (LD, FBD, ST, IL, SFC) via GE Proficy Machine Edition
Backplane Compatibility IC695CHS007 / IC695CHS012 / IC695CHS016 (RX3i Universal Backplane)
Operating Temperature 0°C to 60°C
Certifications UL, CE, cUL, FM Class I Div 2
Firmware Field-upgradeable via Ethernet or CompactFlash
Weight Approx. 1,400 g (module + packaging)
Lead Time In-stock units: 3–7 business days (DHL/FedEx Express). Sourced units: 10–21 business days depending on origin. EXW Xiamen available for freight forwarder arrangements. Rush fulfillment available upon request.
Warranty 12 months from date of shipment

Total Cost of Ownership (TCO) Analysis

When procurement teams evaluate the IC695CPU320, the unit price is rarely the dominant cost variable. The more consequential figures are the cost of unplanned downtime, the carrying cost of safety stock, and the administrative burden of managing OEM procurement cycles that no longer align with operational realities.

Downtime Risk Reduction: A single unplanned shutdown in a continuous process environment — chemical, power generation, water treatment — can cost anywhere from USD 10,000 to USD 500,000 per hour depending on throughput and contractual penalties. The IC695CPU320 is a single-point-of-failure component in non-redundant RX3i configurations. Maintaining a spare on-site or securing a committed supply relationship with a specialist distributor like siemensplc.com converts that tail risk from a budget emergency into a managed line item. Our 12-month warranty coverage means that if a replacement unit fails within the warranty period, you receive a full replacement at no additional cost — eliminating the double-spend scenario that often follows emergency OEM procurement.

CAPEX Optimization: New RX3i installations sourced through OEM channels carry list-price premiums that can represent 30–60% above market-rate pricing for equivalent verified units. For multi-rack projects or system integrators building out several control panels simultaneously, sourcing IC695CPU320 modules through siemensplc.com delivers measurable CAPEX reduction without compromising technical specification or warranty coverage. Our pricing is structured for volume — contact us for tiered pricing on orders of 3 units or more.

OPEX Reduction: Reactive maintenance — the practice of sourcing replacement hardware only after a failure occurs — consistently produces higher per-unit costs, expedited freight charges, and extended downtime windows. A proactive spare-parts strategy, supported by a reliable third-party supplier with confirmed inventory depth, shifts the cost curve. Our standing inventory of PACSystems RX3i components means your maintenance team can execute a swap within hours rather than weeks, keeping MTTR (Mean Time to Repair) within acceptable SLA bounds.

Firmware and Compatibility Management: The IC695CPU320 supports field-upgradeable firmware, which means units sourced from siemensplc.com can be pre-flashed to your specified firmware revision at no additional charge. This eliminates the compatibility validation step that typically adds 1–3 days to emergency replacement timelines.

Quality & Compliance Assurance

Every IC695CPU320 unit shipped from siemensplc.com undergoes a structured pre-shipment verification process. Visual inspection confirms physical integrity — no bent pins, cracked housings, or label anomalies that indicate counterfeit or refurbished-without-disclosure units. Firmware version is verified and documented. A functional power-on test confirms module initialization and communication port responsiveness before packaging.

We operate under a 100% genuine product commitment. Units are sourced exclusively from authorized distributor channels and verified decommissioned OEM installations with traceable provenance. Serial numbers are cross-referenced against GE Automation’s product database where accessible, and holographic label integrity is confirmed on every unit.

Our export operations are fully compliant with Xiamen Customs regulations. We provide complete export documentation for every international shipment: commercial invoice, packing list, certificate of origin, and ECCN classification documentation. This documentation package is designed to satisfy customs clearance requirements in the EU, North America, Southeast Asia, and the Middle East without additional preparation on the buyer’s side.

Payment flexibility is a practical compliance consideration for procurement teams operating under multi-currency treasury policies. We accept T/T wire transfer (USD, EUR, CNY, HKD), PayPal, and major credit cards — eliminating the friction that often delays PO execution when a single payment method is unavailable.

Strategic Sourcing from Xiamen

Xiamen is one of China’s five original Special Economic Zones and home to one of the country’s most active international cargo ports. The Xiamen Gaoqi International Airport and Xiamen Port together handle millions of tonnes of freight annually, with direct cargo connections to major logistics hubs in Europe, North America, and Southeast Asia. For industrial automation components — which require careful handling, accurate customs classification, and reliable transit times — Xiamen’s logistics infrastructure provides a meaningful operational advantage over suppliers based in inland manufacturing regions.

Our warehouse and operations are located within Xiamen’s bonded logistics zone, which enables faster customs clearance on export shipments and reduces the administrative lead time between order confirmation and carrier pickup. Standard international shipments via DHL Express or FedEx International Priority typically clear Xiamen customs within 24 hours of handover. For buyers in the EU or North America, door-to-door transit times of 3–5 business days are standard for in-stock units.

For buyers who prefer EXW terms — common among system integrators with established freight forwarder relationships — we provide full pre-shipment documentation and coordinate handover at our Xiamen facility. This arrangement gives your logistics team complete control over carrier selection, insurance, and customs brokerage while we handle the export compliance side.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.