GE IC698CHS017 PLC Backplane Rack
Request verified availability, condition, replacement risk review, packing options and courier lead time for IC698CHS017.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- GE
- Primary Part Number
- IC698CHS017
- Product Type
- PLC Backplane Rack
- Series / Family
- PACSystems
- Country of Origin
- US
- Catalog Category
- PLCs & Controllers
GE IC698CHS017 — Procurement Strategy for Mission-Critical PACSystems RX7i Infrastructure
For procurement managers and maintenance engineers operating PACSystems RX7i-based control architectures, the IC698CHS017 represents one of the highest-consequence single points of failure in the entire control cabinet. This 17-slot VME backplane is not a commodity component — it is the physical and electrical foundation upon which every CPU, I/O module, and communication card in the RX7i chassis depends. When this part fails or becomes unavailable through OEM channels, the downstream impact on production continuity is immediate and measurable.
The GE PACSystems RX7i platform has reached end-of-active-production status, which fundamentally changes the sourcing calculus for asset-intensive industries. Procurement teams that relied exclusively on OEM distribution channels are now encountering extended lead times, minimum order constraints, and price volatility that did not exist during the platform’s active lifecycle. The IC698CHS017, as the largest standard rack in the RX7i family, is among the most frequently requested components in the global surplus and MRO market — and availability windows can close quickly when multiple facilities are competing for the same pool of genuine stock.
siemensplc.com maintains active sourcing relationships across verified industrial surplus networks in North America, Europe, and Asia-Pacific, enabling us to locate and qualify IC698CHS017 units that meet the functional and cosmetic standards required for production-environment deployment. Every unit offered through our platform is subject to physical inspection, connector integrity verification, and part-number authentication before quotation.
Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
- Part Number: IC698CHS017
- Manufacturer: GE Automation & Controls (General Electric)
- Platform Series: PACSystems RX7i
- Backplane Architecture: VME (Versa Module Europa) bus
- Total Module Slots: 17
- Usable I/O Slots: Up to 15 (dependent on CPU and power supply slot allocation)
- Compatible Power Supplies: IC698PSA100, IC698PSA350, IC698PSD300
- Compatible CPUs: IC698CPE010, IC698CPE020, IC698CPE030, IC698CPE040
- Chassis Mounting: 19-inch rack panel mount, standard EIA spacing
- Operating Temperature Range: 0°C to 60°C
- Relative Humidity: 5% to 95%, non-condensing
- Certifications: CE, UL listed
- Unit Weight: Approximately 800 g
- Lifecycle Status: End of active OEM production; available through qualified surplus channels
- Lead Time: Standard availability: 3–10 business days from confirmed stock. For units requiring cross-regional sourcing, lead time is typically 10–21 business days. Expedited options available upon request — contact our team with your required delivery date and we will confirm feasibility within 24 hours.
- Minimum Order Quantity: 1 unit
- Accepted Currencies: USD, EUR, CNY, HKD, and other major currencies by arrangement
Total Cost of Ownership (TCO) Analysis
When evaluating the true cost of sourcing the IC698CHS017, procurement teams should move beyond unit price and apply a full TCO framework that accounts for downtime risk, sourcing friction, and warranty coverage.
Downtime Cost Exposure: In process-continuous industries — power generation, petrochemical, automotive assembly — an unplanned PLC rack failure can halt production at a rate of USD 5,000 to USD 50,000 per hour depending on line throughput and product value. A 48-hour sourcing delay on a critical backplane, compounded by customs clearance and logistics, can translate into six-figure losses that dwarf the cost of the component itself. Maintaining a qualified spare-parts relationship with a responsive supplier like siemensplc.com is not a procurement luxury — it is a risk mitigation strategy with a calculable return.
OEM Channel Limitations: With the RX7i platform in end-of-life status, GE’s authorized distribution network has progressively reduced stocking commitments for the IC698CHS017. Procurement teams relying solely on OEM channels report lead times of 8–16 weeks for new units, when available at all. This creates a structural gap between operational demand and supply that third-party specialist suppliers are uniquely positioned to fill.
12-Month Warranty Coverage: siemensplc.com provides a 12-month warranty on all IC698CHS017 units — significantly longer than the 90-day coverage typical of the surplus market. This warranty directly reduces OPEX by eliminating the cost of repeat sourcing events within the warranty period. For facilities running multiple RX7i systems, the cumulative warranty benefit across a spare-parts program can represent meaningful budget protection over a 12-month maintenance cycle.
CAPEX Optimization: Sourcing through siemensplc.com allows procurement teams to avoid the capital expenditure associated with full platform migration. Replacing a functional RX7i architecture with a current-generation PLC platform involves not only hardware costs but also engineering hours for system redesign, software migration, I/O rewiring, and commissioning — a project that routinely exceeds USD 200,000 for a mid-size installation. Extending the operational life of existing RX7i infrastructure through qualified spare-parts sourcing is, in most cases, the lower-CAPEX decision by a significant margin.
OPEX Reduction Through Supplier Consolidation: Working with a single, technically specialized supplier for RX7i components reduces the administrative overhead of managing multiple vendor relationships, purchase orders, and quality audits. siemensplc.com serves as a consolidated sourcing point for the full RX7i module ecosystem, enabling procurement teams to streamline their MRO workflows.
Quality & Compliance Assurance
Every IC698CHS017 unit offered through siemensplc.com is subject to a structured quality verification process before it is made available for sale. Physical inspection covers chassis integrity, VME connector pin condition, slot guide rail alignment, and manufacturer markings. Part numbers and date codes are cross-referenced against GE’s published documentation to confirm authenticity. Units that do not meet our acceptance criteria are not listed.
siemensplc.com operates with a 100% genuine parts commitment. We do not knowingly source or sell counterfeit, remarked, or non-original components. In the event that a unit is found to be non-conforming after delivery, our 12-month warranty provides a clear remediation path — replacement or full refund, at the buyer’s discretion.
All export transactions are processed through Xiamen Customs in full compliance with Chinese export regulations. Commercial invoices, packing lists, certificates of origin, and export declarations are prepared accurately and provided with every shipment. For buyers requiring specific documentation formats — such as those mandated by EU customs authorities or US CBP — our logistics team can accommodate these requirements at the time of order confirmation.
Payment flexibility is a core part of our compliance posture. We accept T/T (bank wire transfer), L/C (letter of credit), and other B2B payment instruments in USD, EUR, CNY, HKD, and additional currencies by arrangement. Multi-currency invoicing is available for buyers operating in regions with specific foreign exchange requirements.
Strategic Sourcing from Xiamen
Xiamen is one of China’s five original Special Economic Zones and has developed into a mature international trade and logistics hub over four decades of export-oriented growth. The city’s port — Xiamen Port — ranks among the top 20 container ports globally by throughput volume, with direct shipping routes to major industrial economies including the United States, Germany, Japan, South Korea, the Netherlands, and Australia.
For industrial buyers, Xiamen’s logistics infrastructure translates into practical advantages: competitive freight rates on both FCL and LCL shipments, access to multiple international courier networks (DHL, FedEx, UPS, TNT) for small-parcel express delivery, and established relationships with freight forwarders experienced in handling industrial electronics with the documentation requirements that cross-border trade demands.
Xiamen Customs has a well-established track record for processing industrial automation components. Export declarations for PLC hardware, backplane racks, and associated electronics are routine transactions for the local customs authority, which reduces the risk of clearance delays that can affect shipments originating from less-experienced export points. For buyers in the EU, UK, or other jurisdictions with specific import compliance requirements, our team coordinates with local customs brokers to ensure smooth inbound clearance.
Air freight from Xiamen Gaoqi International Airport provides an expedited option for urgent requirements, with transit times of 3–7 business days to most major industrial markets. For buyers with non-urgent requirements, sea freight from Xiamen Port offers a cost-effective alternative with transit times of 15–35 days depending on destination.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.