Honeywell CC-PCNT02 51454551-275 DCS Network Interface Module – Experion PKS C300
Request verified availability, condition, replacement risk review, packing options and courier lead time for CC-PCNT02.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- Honeywell
- Primary Part Number
- CC-PCNT02
- Product Type
- DCS Network Interface Module
- Series / Family
- Experion PKS
- Country of Origin
- US
- Catalog Category
- Communication
- Operating Temp.
- 0°C to +60°C (32°F to 140°F)
- Warranty
- 12 months from date of shipment
Honeywell CC-PCNT02 51454551-275 — Process Controller Network Interface Module for Experion PKS C300 DCS
The CC-PCNT02 (Honeywell manufacturing reference 51454551-275) is the dedicated Process Controller Network Interface Module designed for the C300 Controller platform within Honeywell’s Experion PKS (Process Knowledge System) distributed control architecture. Its function is singular and non-negotiable: it provides the physical and logical communication bridge between the C300 field controller and the plant-wide Fault Tolerant Ethernet (FTE) backbone, as well as the IOLINK field device network. Without an operational CC-PCNT02, the C300 controller is isolated — unable to exchange real-time process data with the Experion server, peer controllers, or field I/O modules. In continuous-process industries where loop scan times are measured in milliseconds and unplanned shutdowns carry six-figure cost penalties per hour, this module occupies a position of absolute criticality in the control hierarchy.
The “02” revision designation reflects Honeywell’s second-generation PCNT architecture, incorporating improvements in network arbitration logic, diagnostic register depth, and thermal management over the original CC-PCNT01. The module mounts directly into the C300 controller chassis backplane, communicating with the C300 CPU via a proprietary high-speed parallel bus. On the network side, it presents dual RJ-45 FTE ports, each connected to an independent Ethernet switch fabric — a hardware-level redundancy scheme that eliminates any single cable, port, or switch failure as a cause of controller isolation.
Real-time Stock & RFQ: [email protected] | WhatsApp: +86 18359268345
Technical Parameters
| Parameter | Specification |
|---|---|
| Honeywell Part Number | CC-PCNT02 |
| Manufacturing Reference | 51454551-275 |
| Module Revision | 02 (second generation) |
| Compatible Platform | Honeywell Experion PKS C300 Controller |
| Network Protocol | FTE (Fault Tolerant Ethernet) / IOLINK |
| Physical Network Interface | Dual RJ-45, 100BASE-TX |
| Backplane Interface | C300 proprietary high-speed parallel bus |
| Form Factor | C300 chassis-mount, single-slot |
| Operating Temperature | 0°C to +60°C (32°F to 140°F) |
| Storage Temperature | -40°C to +85°C |
| Relative Humidity | 5% to 95% non-condensing |
| Power Consumption | Supplied via C300 chassis backplane (5 VDC rail) |
| EMC Compliance | IEC 61000-4 series (ESD, EFT, surge, conducted/radiated immunity) |
| Approvals | CE, UL listed for industrial control equipment |
| Unit Weight | Approx. 350 g |
| Hot-Swap Support | Yes, in redundant C300 configurations |
| Warranty | 12 months from date of shipment |
Hardware Logical Analysis
Dual-Path FTE Architecture and Network Arbitration
The CC-PCNT02 implements Honeywell’s Fault Tolerant Ethernet scheme at the hardware level, not through software failover. Each of the two RJ-45 ports connects to a physically independent Ethernet controller IC on the module’s PCB. Both controllers operate simultaneously in active-active mode, transmitting and receiving identical data frames across two separate switch paths. A dedicated arbitration ASIC on the module continuously monitors frame arrival timestamps from both paths. When a discrepancy exceeding the configured threshold is detected — indicating a path fault — the arbitration logic suppresses the degraded path’s output within a single network cycle, typically under 1 ms, without interrupting the data stream to the C300 CPU. This is a deterministic hardware decision, not a software timeout, which is why FTE path switchover does not generate a controller scan-time overrun event.
Backplane Bus Interface and CPU Coupling
On the controller side, the CC-PCNT02 interfaces with the C300 CPU module via the C300 chassis backplane’s proprietary parallel bus. This bus operates at a fixed clock rate synchronized to the C300 controller’s execution cycle, ensuring that network data is presented to the CPU at a deterministic point in each scan. The module contains a dual-port RAM buffer that decouples the asynchronous Ethernet receive path from the synchronous CPU read cycle — incoming network frames are written to one buffer bank while the CPU reads from the other, eliminating any possibility of a network burst event causing a CPU wait state.
EMC Design and Signal Integrity
The module’s PCB employs a multi-layer stackup with dedicated ground planes separating the digital logic layer from the Ethernet PHY layer. Transformer-coupled RJ-45 magnetics provide 1500 V isolation between the network cable and the module’s internal logic, meeting IEC 61000-4-5 surge immunity requirements at ±2 kV line-to-earth. Ferrite bead arrays on all power supply entry points suppress conducted emissions in the 150 kHz–30 MHz band. The chassis-mount form factor ensures the module’s metal faceplate makes direct contact with the C300 chassis ground rail, providing a low-impedance path for shield currents induced by external electromagnetic fields — a design detail that is particularly relevant in installations near variable-frequency drives or high-current bus bars.
Diagnostic Register Architecture
The revision 02 design expands the module’s internal diagnostic register set relative to the original PCNT01. The CC-PCNT02 maintains per-port frame error counters (CRC errors, alignment errors, late collisions), FTE path health status bits, backplane communication watchdog status, and module temperature sensor data — all accessible to the Experion PKS server via the standard C300 diagnostic data highway. This register depth allows maintenance engineers to trend network degradation over time rather than responding only to hard faults, enabling condition-based maintenance scheduling.
System Integration Benefits
- Zero-Interruption Path Redundancy: Active-active FTE operation means a cable pull, switch port failure, or NIC fault on one path produces no detectable disruption to the C300 controller’s scan cycle — the redundant path absorbs the full traffic load within one arbitration cycle.
- Deterministic Scan-Time Preservation: The dual-port RAM buffer architecture ensures that Ethernet receive events never introduce jitter into the C300 CPU’s execution cycle, maintaining loop scan times within ±0.1 ms of the configured setpoint even under peak network load.
- Transparent Fault Reporting to Experion Server: All module-level faults — path degradation, frame errors, temperature exceedance, backplane watchdog trips — are reported as structured alarm objects to the Experion PKS server, appearing in the operator’s alarm summary with full timestamp and severity classification without requiring custom scripting.
- Hot-Swap Replacement Without Process Interruption: In a redundant C300 pair, the CC-PCNT02 on the standby controller can be replaced while the primary controller maintains full process control. After reinsertion, the module performs an automatic self-test sequence and rejoins the FTE network, after which the redundancy manager re-synchronizes the standby controller’s data image — the entire procedure generates no process disturbance.
- Backward Compatibility Across Experion PKS Releases: The CC-PCNT02 is compatible with Experion PKS R400 through current releases, allowing facilities to upgrade their Experion server software without requiring simultaneous hardware replacement of installed PCNT modules.
- Support for Universal I/O Architecture: The module’s IOLINK interface supports Honeywell’s Universal I/O (UIO) field termination assemblies, enabling mixed analog, discrete, and HART signal termination on a single I/O chassis without dedicated module types per signal category.
- Reduced Spare Parts Inventory Complexity: Because the CC-PCNT02 is common across all C300 controller chassis sizes (4-slot through 12-slot), a single spare module covers the entire installed C300 fleet at a facility, reducing the number of unique spare part numbers that must be stocked and managed.
- Integrated Watchdog Timer for Fail-Safe Behavior: The module’s backplane watchdog timer independently monitors the C300 CPU’s heartbeat signal. If the CPU fails to update the watchdog within the configured timeout window, the CC-PCNT02 asserts a hardware fault signal on the backplane, triggering the C300 redundancy manager to initiate a controlled switchover to the standby controller before the process loop loses its last valid output.
Quality Assurance & Global Logistics
Every CC-PCNT02 51454551-275 unit supplied by siemensplc.com is sourced as genuine Honeywell original equipment — not third-party compatible or counterfeit. Our procurement chain traces each module to authorized industrial surplus channels or decommissioned OEM-maintained facilities, with full traceability documentation available on request.
Incoming Inspection Protocol: Each unit undergoes a structured incoming inspection covering physical condition assessment (connector pin integrity, PCB surface inspection, label authenticity verification), power-on self-test (POST) pass confirmation, and FTE port continuity verification. Modules that do not pass all inspection checkpoints are quarantined and not offered for sale.
ESD-Safe Packaging: All modules are packed in anti-static shielding bags, placed in foam-lined inner boxes, and shipped in double-wall corrugated outer cartons. Humidity indicator cards are included for shipments to high-humidity destinations. Each carton is sealed with tamper-evident tape.
Export Documentation: Standard shipping documentation includes commercial invoice, packing list, and certificate of origin (Xiamen, China). Additional documents — CITES certificates, end-user declarations, or destination-country import permits — are prepared upon request at no additional charge.
Logistics from Xiamen, China: Our warehouse is located in Xiamen, Fujian Province, with direct access to Xiamen Gaoqi International Airport and Xiamen Port — two of China’s primary export hubs for industrial goods. Standard international shipments are dispatched via DHL Express, FedEx International Priority, or UPS Worldwide Expedited, with typical transit times of 3–5 business days to Europe, North America, and Southeast Asia. Sea freight consolidation is available for multi-unit orders. All shipments are fully insured against loss and damage in transit.
12-Month Warranty: All units carry a 12-month warranty from the date of shipment against defects in materials and workmanship. Warranty claims are processed with a target replacement dispatch time of 5 business days from fault confirmation.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
Location: Xiamen, China
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.