SCHMERSAL SRB-NA-R-C.35/CH2A-24V Safety Relay Module
Request verified availability, condition, replacement risk review, packing options and courier lead time for SRB-NA-R-C.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- SCHMERSAL
- Primary Part Number
- SRB-NA-R-C
- Product Type
- Safety Relay Module
- Series / Family
- 24VDC Cat.4 PLe SIL3
- Manufacturer
- SCHMERSAL
- Country of Origin
- DE
- Catalog Category
- DCS & Safety Modules
- Operating Temp.
- -25°C to +55°C
SRB-NA-R-C.35/CH2A-24V: Every Minute of Downtime Costs You — We Ship Today
Your line is down. The safety relay tripped and won’t reset. Maintenance has confirmed the SRB-NA-R-C.35/CH2A-24V is dead — burnt input stage, welded output contacts, or a firmware-locked fault that won’t clear. You’ve already lost an hour. The question now is how fast you can get a verified replacement on-site.
We stock the SCHMERSAL SRB-NA-R-C.35/CH2A-24V in Xiamen. Same-day dispatch on confirmed orders before 15:00 CST. DHL Express to most destinations in 2–4 business days. No substitutes, no grey-market units — 100% original SCHMERSAL SRB series with full traceability documentation.
URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Part Number | SRB-NA-R-C.35/CH2A-24V |
| Manufacturer | SCHMERSAL |
| Series | SRB-NA-R-C |
| Supply Voltage | 24V DC (PELV) |
| Input Configuration | Dual-channel (CH2A) with cross-fault detection |
| Safety Category | Category 4 / PLe (EN ISO 13849-1) |
| SIL Rating | SIL 3 (IEC 62061) |
| Output Contacts | 3 × NO safety outputs + 1 × NC auxiliary |
| Response Time | ≤ 20 ms |
| Restart Mode | Manual monitored reset (default) |
| Mounting | 35 mm DIN rail |
| Operating Temperature | -25°C to +55°C |
| Protection Rating | IP40 (panel-mounted) |
| Weight | 1,150 g |
| Standards | EN 60947-5-1, EN ISO 13849-1, IEC 62061, CE |
| Origin | Germany |
| Stock Status | ✔ Ready to Ship — Xiamen Warehouse |
Troubleshooting & Replacement Tips
Most common failure modes on the SRB-NA-R-C.35/CH2A-24V:
1. Relay won’t reset after E-stop release
Ninety percent of the time this is a wiring issue, not a dead relay. Before condemning the unit, check: (a) both input channels A1/A2 are seeing 24VDC simultaneously — a single-channel open will lock the relay in a safe-off state; (b) the reset button circuit is wired to S33/S34 with a momentary NO contact, not a maintained switch; (c) the feedback loop on Y1/Y2 is closed — if you have downstream contactors, their NC auxiliary contacts must be in series here. If all three check out and the relay still won’t pull in, the input stage is likely damaged. Replace the unit.
2. Intermittent nuisance trips on a running line
This is almost always vibration-induced contact bounce on the E-stop button or safety gate switch feeding the dual-channel inputs. The SRB-NA-R-C.35/CH2A-24V has a built-in 6 ms input filter, but worn mechanical contacts can generate bounce spikes longer than that. Scope channels A1 and A2 simultaneously — if you see asymmetric dropout timing between the two channels exceeding the module’s cross-fault window, the relay will interpret it as a fault and latch off. Replace the field device first; if trips continue, the relay’s input comparator may have degraded.
3. Output contacts welded — relay energised but machine won’t start
This happens when the downstream load (contactor coil) draws inrush current beyond the relay’s 6A AC-15 rating, or when the contacts were switched under a highly inductive load without adequate arc suppression. The NC auxiliary contact (13/14) will confirm: if it reads open while the relay is de-energised, the NO contacts are welded. Do not attempt to free welded contacts — replace the module immediately. Install RC snubbers or varistors across contactor coils to protect the replacement unit.
4. Replacement unit installed — machine still won’t run
Check these in order: (a) Confirm 24VDC is present at A1 and A2 — not just at the terminal block, but measured at the relay pins with a meter. Corroded terminals are common in humid environments. (b) Verify the reset sequence: power up → both input channels closed → momentary reset pulse on S33/S34 → relay should pull in within 300 ms. (c) If the relay pulls in but the machine PLC still shows a safety fault, the PLC’s safety input card may have latched its own fault independently — clear it via the PLC programming software (e.g., Siemens TIA Portal: reset the F-DI channel in the safety program). (d) Confirm the new unit’s firmware revision matches your system’s validated configuration if you are operating under a certified safety assessment — SCHMERSAL occasionally releases hardware revisions that require re-validation.
5. Cross-fault detection triggering on a known-good circuit
The CH2A input monitors both channels for simultaneous switching within a defined time window. If your E-stop button cable run is long (>50 m) and routed near high-voltage conductors, induced capacitive coupling can cause one channel to lag the other. Use shielded cable, ground the shield at one end only, and keep safety signal cables in a dedicated conduit away from power wiring.
Reliability in Harsh Conditions
The SRB-NA-R-C.35/CH2A-24V is not a lab instrument — it is built for the floor. The housing is rated to withstand continuous vibration per EN 60068-2-6 (10–55 Hz, 0.35 mm amplitude), which covers the resonance frequencies typical of press brakes, compressors, and conveyor drive frames. The internal relay mechanism uses gold-flashed silver-nickel contacts with a rated mechanical life of 10 million operations — at one E-stop cycle per shift, that is over 27,000 years of mechanical life. The limiting factor in practice is electrical erosion from inductive load switching, which is why proper arc suppression on downstream contactors is non-negotiable.
Thermal performance is equally robust. The module is rated to +55°C ambient without derating, and the internal components are selected for operation up to +70°C junction temperature. In practice, a well-ventilated panel running at 40°C ambient will see the relay operating well within its thermal envelope. Humidity resistance is validated to 95% RH non-condensing — adequate for most factory environments, though coastal or washdown applications should consider an IP65-rated enclosure for the panel itself.
The PCB conformal coating on production units provides additional protection against airborne contaminants — metallic dust, cutting fluid mist, and flux residues that are endemic in machining and fabrication environments. This is a detail that matters when you are installing a replacement in a panel that has been running for ten years and has accumulated a layer of conductive debris on every horizontal surface. Clean the panel before installing the new unit.
Global Express Logistics
Our warehouse is located in Xiamen, Fujian — one of China’s primary export hubs with direct access to DHL Express, FedEx International Priority, and UPS Worldwide Express gateways. For urgent orders confirmed before 15:00 CST, same-day dispatch is standard. Here is what the transit timeline looks like in practice:
- Southeast Asia (Singapore, Thailand, Malaysia, Vietnam): DHL Express 1–2 business days
- East Asia (Japan, South Korea, Taiwan): DHL/FedEx 1–2 business days
- Middle East (UAE, Saudi Arabia, Qatar): DHL Express 2–3 business days
- Europe (Germany, Netherlands, UK, Poland): FedEx IP or DHL Express 3–4 business days
- North America (USA, Canada, Mexico): FedEx IP 3–5 business days
- South America (Brazil, Chile, Colombia): DHL Express 4–6 business days
- Australia / New Zealand: DHL Express 3–4 business days
All shipments include: commercial invoice with accurate HS code (8536.49), packing list, certificate of origin, and SCHMERSAL conformity documentation where available. For orders requiring import duty minimisation, we can advise on applicable FTA provisions. Tracking numbers are issued within 2 hours of dispatch. For time-critical shipments, we recommend DHL Express — their Xiamen hub has direct freighter connections to Frankfurt, Chicago, and Singapore, which eliminates the intermediate sort delays that add 12–24 hours to economy services.
If your procurement team requires a formal quotation with lead time confirmation before raising a PO, we can turn that around within 30 minutes during business hours. Send your RFQ to [email protected] with quantity, delivery address, and required delivery date.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.