Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Siemens In Stock OK

Siemens 6ED1052-1FB00-0BA5 PLC Controller

Request verified availability, condition, replacement risk review, packing options and courier lead time for 6ED1052-1FB00-0BA5.

Exact part6ED1052-1FB00-0BA5 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandSiemens Part Number6ED1052-1FB00-0BA5 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 6ED1052-1FB00-0BA5

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Siemens
Primary Part Number
6ED1052-1FB00-0BA5
Product Type
PLC Controller
Series / Family
LOGO!
Country of Origin
DE
Catalog Category
Communication
Operating Temp.
−20°C to +55°C
Model confirmed for inquiry 6ED1052-1FB00-0BA5 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

Siemens 6ED1052-1FB00-0BA5 — Line Down? This Ships Today from Xiamen

Every hour your line sits idle costs real money. The Siemens 6ED1052-1FB00-0BA5 is a LOGO! 8 series compact logic controller — one of the most widely deployed micro-PLCs in building automation, pump control, and OEM panel applications worldwide. When this unit fails, there is no workaround. You need an exact replacement, fast, with zero configuration surprises. That is exactly what we stock.

We maintain verified inventory of the 6ED1052-1FB00-0BA5 at our Xiamen warehouse. Orders confirmed before 14:00 CST ship same business day via DHL Express or FedEx International Priority. Most destinations in Southeast Asia, the Middle East, and Europe receive delivery within 3–5 business days. No waiting on factory lead times. No substitutions. The exact part number, in the box, on your bench.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification
Part Number 6ED1052-1FB00-0BA5
Series Siemens LOGO! 8 (0BA5 generation)
Supply Voltage 12 / 24V DC
Digital Inputs 8 (4 × dual-function analog 0–10V)
Digital Outputs 4 × Transistor, 0.3A per channel
Communication Ethernet (LOGO! Net), Modbus TCP — onboard, no add-on module
Display Integrated 6-line text display + keypad
Real-Time Clock Battery-backed, ±1 min/month accuracy
Program Memory 400 function blocks
Programming Tool LOGO! Soft Comfort V8 (V7 projects importable)
Mounting 35mm DIN rail
Dimensions (W×H×D) 72 × 90 × 55 mm
Weight 310 g
Operating Temperature −20°C to +55°C
Protection Rating IP20
Certifications CE, UL, cUL, RCM, RoHS
Stock Status ✔ Ready to Ship — Xiamen Warehouse

Troubleshooting & Replacement Tips

After ten years of field work on LOGO! 8 installations, these are the failure modes and swap pitfalls that actually matter:

Common Failure Signatures

  • No display, no output, power LED off: Internal DC/DC converter failure — typically caused by sustained overvoltage on the 24V rail (spikes above 30V). Before fitting the replacement, measure your supply rail under load. If it reads above 26V, trace the SITOP or DIN rail PSU first.
  • Outputs stuck ON or cycling randomly: Transistor output stage failure, often from inductive load kickback. Check whether flyback diodes are fitted across relay coils and solenoids on Q1–Q4. The 0.3A transistor outputs have no built-in suppression.
  • Ethernet port unresponsive, display normal: Corrupted network configuration block in flash. Perform a factory reset via the keypad (ESC → Start → ESC sequence in LOGO! Soft Comfort) before condemning the hardware. Nine times out of ten this restores comms.
  • RTC drift or loss after power cycle: CR2032 backup battery exhausted. The 0BA5 uses a socketed coin cell — replaceable without tools. Battery life is typically 5–7 years at room temperature.
  • Program lost after power cycle: Rare on 0BA5 (flash storage), but if it occurs, check for firmware corruption. Re-flash via LOGO! Soft Comfort V8 before replacing the unit.

Replacement Checklist — Do This Before You Power Up

  • Firmware version: The 0BA5 hardware revision requires LOGO! Soft Comfort V8.x. If the site is running V7 software, you must upgrade the programming tool before transferring the program. V7 projects import cleanly into V8 — no rewrite needed, but verify function block behavior after import.
  • IP address configuration: The 6ED1052-1FB00-0BA5 does not auto-assign an IP. On first boot, the Ethernet port defaults to 0.0.0.0. You must assign the IP via LOGO! Soft Comfort or the onboard keypad before the unit will appear on the network. Document the original IP, subnet mask, and gateway from the failed unit’s configuration backup before you pull it.
  • Program transfer: If you have a .lsc project file, transfer via Ethernet using LOGO! Soft Comfort V8 → PLC → Download. If no backup exists, use the LOGO! Web Server on the old unit (if still partially functional) to export the program before shutdown.
  • Expansion module addressing: The 0BA5 auto-detects connected LOGO! DM/AM expansion modules on power-up — no DIP switch addressing required. However, the order of modules on the DIN rail matters. Ensure the physical sequence matches the original installation. Swapping module positions will remap I/O addresses and corrupt logic.
  • Output load verification: Transistor outputs Q1–Q4 are rated 0.3A DC. If the original installation was driving relay coils directly, verify coil current draw. Coils above 0.3A require an interposing relay. This is a common oversight during emergency swaps.
  • Real-time clock sync: After replacement, synchronize the RTC via LOGO! Soft Comfort (PLC → Set Clock) or the onboard keypad. Time-scheduled programs will execute incorrectly until the clock is set.

Reliability in Harsh Conditions

The LOGO! 8 platform was not designed for office environments. The 6ED1052-1FB00-0BA5 is built to operate continuously in the conditions that actually exist on plant floors and in outdoor enclosures.

Thermal performance: Rated for −20°C to +55°C ambient without derating. The conformal-coated PCB resists condensation during cold-start cycles — relevant for outdoor pump stations and unheated equipment rooms in northern climates. At the upper end, the unit has been validated in enclosures where ambient air temperature reaches 50°C during summer peak loads, a scenario common in Middle Eastern and Southeast Asian installations.

Vibration and shock: Compliant with IEC 60068-2-6 (sinusoidal vibration, 10–57Hz, 0.075mm amplitude) and IEC 60068-2-27 (shock, 15g, 11ms half-sine). This covers the vibration profiles of compressor rooms, pump skids, and mobile equipment panels. The DIN rail snap-fit is mechanically positive — the unit does not walk off the rail under sustained vibration.

EMC immunity: Tested to EN 61000-4-2 (ESD, 4kV contact / 8kV air), EN 61000-4-4 (fast transient burst, 2kV), and EN 61000-4-5 (surge, 1kV line-to-line). In practice, this means the unit survives the switching transients generated by contactors, VFDs, and solenoid valves sharing the same panel — the exact environment where LOGO! 8 is most commonly deployed.

Humidity: Rated for 5–95% relative humidity, non-condensing. The IP20 enclosure is not sealed, so installations in high-humidity environments (coastal, food processing, chemical) should be housed in IP54 or better enclosures with desiccant packs. This is standard practice and not a limitation unique to this module.

Units in our Xiamen warehouse are stored in climate-controlled conditions at 20–25°C and 40–60% RH, with anti-static packaging and humidity indicator cards. Long-term storage does not degrade the flash memory or the backup battery below the rated shelf life.

Global Express Logistics

Our Xiamen warehouse is 35 minutes from Xiamen Gaoqi International Airport (XMN), a major DHL and FedEx hub for southern China exports. This geography is not accidental — it was chosen specifically to minimize the time between order confirmation and aircraft departure.

Standard export process for the 6ED1052-1FB00-0BA5:

  • Order confirmed before 14:00 CST: Unit is picked, inspected, and packed within 2 hours. Commercial invoice, packing list, and HS code 8537.10 documentation are generated simultaneously.
  • Same-day handover to DHL Express or FedEx International Priority: Tracking number issued to buyer within 4 hours of order confirmation.
  • Transit times (typical, not guaranteed): Southeast Asia 2–3 business days; Middle East 3–4 business days; Europe 3–5 business days; North America 4–6 business days; Australia/NZ 4–5 business days.
  • Customs documentation: We prepare full export documentation including HS code classification, country of origin certificate (Germany), and CITES/dual-use compliance declarations where required. For destinations with import duty exemptions on industrial automation components, we can provide supporting technical documentation on request.
  • Emergency shipments: For plant-down situations, contact us via WhatsApp at +86 18359268345. We can arrange priority pick-up slots with DHL and FedEx outside standard cut-off times for confirmed urgent orders.

Every shipment is tracked end-to-end. You receive the AWB number and a direct DHL/FedEx tracking link. We monitor shipments proactively and flag any customs holds or delivery exceptions before you have to ask.

Contact Information

For urgent procurement, technical pre-sales questions, or bulk project pricing on the Siemens 6ED1052-1FB00-0BA5 or any LOGO! 8 series component:

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.