Siemens 6GK5116-0BA00-2AC2 Industrial Ethernet Switch
Request verified availability, condition, replacement risk review, packing options and courier lead time for 6GK5116-0BA00-2AC2.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- Siemens
- Primary Part Number
- 6GK5116-0BA00-2AC2
- Product Type
- Industrial Ethernet Switch
- Series / Family
- SIMATIC
- Country of Origin
- DE
- Catalog Category
- Sensors & Switches
- Operating Temp.
- -40 °C to +70 °C
6GK5116-0BA00-2AC2 Down? Every Minute Costs Money — Ship Today from Xiamen
Your line is stopped. The SCALANCE X116 is dead. You’ve already pulled the module and confirmed the fault — now you need a verified replacement on-site before the next shift, not next week. The Siemens 6GK5116-0BA00-2AC2 is in stock at our Xiamen warehouse. We process same-day for orders confirmed before 15:00 CST. DHL Express to most destinations in 2–4 business days. No MOQ. No waiting on distributor lead times.
This is not a listing for browsing. This is a listing for engineers who are already in the middle of a breakdown and need a part number confirmed, a price, and a tracking number — in that order.
⚡ URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Part Number | 6GK5116-0BA00-2AC2 |
| Series | SCALANCE X116 (X-100 Unmanaged Family) |
| Port Count | 16 × RJ45, 10/100 Mbit/s, Auto-MDI/MDIX |
| Switch Type | Unmanaged (plug-and-play, no IP config required) |
| Supply Voltage | 24 V DC (dual redundant input terminals) |
| Operating Temperature | -40 °C to +70 °C |
| Protection Rating | IP30 |
| Mounting | 35 mm DIN rail |
| Certifications | CE, UL, cUL, ATEX Zone 2, IECEx, GL, DNV |
| Standards | IEEE 802.3, IEEE 802.3u |
| Weight | Approx. 200 g |
| Origin | Germany |
| Stock Status | ✅ Ready to Ship — Xiamen Warehouse |
Troubleshooting & Replacement Tips
Common failure modes on the 6GK5116-0BA00-2AC2:
1. Total loss of link on all 16 ports simultaneously. Nine times out of ten this is a power supply issue, not the switch itself. Before condemning the 6GK5116-0BA00-2AC2, measure voltage at both L+ terminals under load. The switch draws up to 3.5 W; a marginal 24 V PSU that reads 23.1 V at no-load can sag below the undervoltage lockout threshold when the switch initializes. Swap the PSU first if you have one available — it’s a 5-minute test that can save you a replacement order.
2. Intermittent port dropouts on specific ports (not all). This is almost always a connector or cable issue in industrial environments — vibration works RJ45 plugs loose over months. Re-seat each cable on the affected port. If the fault follows the cable to a different port, the cable is the culprit. If the fault stays on the same port regardless of cable, the port’s magnetics are damaged — the switch needs replacement.
3. Switch powers on (PWR LED green) but no traffic passes. On an unmanaged switch this is unusual. Check for a broadcast storm: if one connected device is flooding the network, the switch’s MAC table can thrash and effectively block unicast forwarding. Disconnect devices one at a time until traffic resumes to isolate the offending node.
Replacement procedure — zero-config swap:
The 6GK5116-0BA00-2AC2 is fully unmanaged. There is no IP address, no firmware to match, no DIP switch to set, no PROFINET device name to assign. The replacement procedure is mechanical only:
- De-energize the 24 V DC feed at the upstream breaker or fuse. Do not rely on hot-swap — the switch is not rated for live insertion under load.
- Label each RJ45 cable with port number before removal. With 16 ports in a compact housing, re-insertion errors are common under time pressure.
- Release the DIN-rail clip (bottom latch) and slide the unit off the rail. The clip is spring-loaded — press down firmly before pulling forward.
- Mount the replacement unit. Verify the DIN-rail clip snaps fully — a partially seated unit will vibrate loose.
- Re-insert cables in documented port order. Reconnect power. All 16 port LEDs should cycle through a brief initialization sequence (approximately 2 seconds) then settle to steady green for active links.
- Verify PROFINET IO cycle times in TIA Portal diagnostics if the switch feeds a PROFINET segment. Unmanaged switches introduce no additional latency configuration, but confirm no ghost faults were latched in the IO controller during the outage.
Firmware note: This is an unmanaged switch — there is no firmware to update, no bootloader to match, and no compatibility matrix to check against your PLC firmware version. Any 6GK5116-0BA00-2AC2 unit is a direct drop-in for any other unit of the same part number.
Reliability in Harsh Conditions
The SCALANCE X116 was not designed for a server room. It was designed for the inside of a control cabinet bolted to a press, a conveyor frame, or an outdoor substation enclosure. The -40 °C lower limit is not a marketing figure — it reflects the conformal coating on the PCB and the component selection (industrial-grade capacitors rated for low-temperature ESR, not consumer-grade electrolytics that go high-impedance in the cold).
At the upper end, +70 °C continuous operation means the switch survives inside a sealed steel enclosure on a summer day in a non-air-conditioned facility — a condition that kills consumer-grade hardware within months. The housing is designed for convective airflow along the DIN-rail axis; mount it vertically on the rail as intended and the thermal path works as engineered.
Vibration resistance is validated to IEC 60068-2-6 (sinusoidal) and IEC 60068-2-27 (shock). In practice, this means the unit survives being mounted on a machine frame that runs a 3-shift stamping operation — the kind of environment where standard RJ45 connectors work-harden and crack within a year. The 6GK5116-0BA00-2AC2’s connector retention force and PCB mounting are specified to handle this.
EMC immunity is certified to EN 61000-6-2 (industrial immunity), covering conducted and radiated immunity levels that reflect real factory-floor interference from VFDs, contactors, and welding equipment. If you’re seeing intermittent network faults that correlate with drive starts or contactor switching, the switch is not the weak point — check your cable shielding and grounding before replacing hardware.
Global Express Logistics
Our warehouse is located in Xiamen, Fujian — one of China’s primary export hubs with direct access to DHL, FedEx, and UPS international gateways. Transit times from order confirmation to delivery:
- Southeast Asia (SG, MY, TH, VN, ID): DHL Express 1–2 business days
- Middle East (AE, SA, QA, KW): DHL / FedEx 2–3 business days
- Europe (DE, NL, PL, ES, IT, FR): DHL Express 3–4 business days
- North America (US, CA, MX): FedEx International Priority 3–5 business days
- Australia / New Zealand: DHL Express 3–4 business days
- South America (BR, CL, CO): FedEx 4–6 business days (customs clearance variable)
Orders confirmed before 15:00 CST Monday–Friday are processed same day. You receive a tracking number within 2 hours of dispatch. All shipments include a commercial invoice, packing list, and certificate of origin — the documentation your customs broker needs to clear the shipment without delays. HS code for this product: 8517.62 (network switches). We do not ship via postal services for industrial components — only express courier with full tracking and insurance.
For projects requiring multiple units or phased delivery schedules, contact us directly. We can hold allocated stock against a purchase order and ship in tranches aligned with your installation schedule.
Contact Information
📧 Email: [email protected]
💬 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.