Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB 3GAA082004-E AC Induction Motor

Request verified availability, condition, replacement risk review, packing options and courier lead time for 3GAA082004-E.

Exact part3GAA082004-E RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part Number3GAA082004-E ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 3GAA082004-E

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
3GAA082004-E
Product Type
AC Induction Motor
Product Family
Other series
Country of Origin
SE
Catalog Category
Industrial Automation Spares
Warranty
12 months from date of dispatch
Model confirmed for inquiry 3GAA082004-E Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB 3GAA082004-E M2AA IE2 Aluminium Induction Motor: A Procurement Manager’s Acquisition Strategy

When a plant engineer raises a purchase requisition for the ABB 3GAA082004-E, the procurement team faces a decision that extends well beyond unit price. This IEC Frame 80, IE2-class aluminium induction motor from ABB’s M2AA series sits at the intersection of high-volume availability and exacting application requirements. Understanding where this component fits in your supply chain — and how to source it without exposing your operation to avoidable risk — is the core purpose of this page.

The 3GAA082004-E is a workhorse component. It appears in pump skids, HVAC air handling units, conveyor auxiliaries, and OEM-assembled equipment across dozens of industries. Because it is a high-turnover, widely specified part, the primary procurement risk is not scarcity — it is counterfeit exposure and grey-market substitution. A motor that passes visual inspection but carries a non-genuine rotor or substandard winding insulation will fail prematurely, often at the worst possible moment. siemensplc.com sources this model through verified channels and subjects every unit to pre-dispatch inspection, giving procurement teams a documented, auditable acquisition path.

For MRO buyers managing multi-site operations, consolidating ABB motor procurement through a single specialist distributor reduces administrative overhead, simplifies warranty claims, and creates a consistent paper trail for asset management systems. siemensplc.com supports purchase orders, proforma invoices, and multi-currency settlement — removing the friction that typically slows cross-border industrial procurement.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Part Number / SKU 3GAA082004-E
Brand ABB
Series M2AA (Aluminium Frame)
Frame Size IEC 80
Efficiency Class IE2 (High Efficiency, IEC 60034-30-1)
Enclosure Rating IP55 — Dust-tight, water-jet protected
Insulation Class Class F (155°C thermal limit)
Duty Rating S1 — Continuous operation
Cooling Method IC411 — Totally Enclosed Fan Cooled (TEFC)
Mounting Options B3 (foot), B14 (flange), B34 (combined)
Frame Material Die-cast aluminium alloy
Approx. Weight 2.45 kg
Applicable Standards IEC 60034-1, EN 60034, CE, RoHS
Country of Origin Germany
Lead Time (In-Stock) Ships within 2–5 business days from Xiamen
Lead Time (Bulk / Special Config) 10–21 business days; confirm at time of order
Minimum Order Quantity 1 unit; volume pricing available from 5 units
Warranty 12 months from date of dispatch

Total Cost of Ownership (TCO) Analysis

Procurement decisions evaluated on purchase price alone routinely underestimate the true cost of an industrial motor. For a component like the ABB 3GAA082004-E — installed in continuous-duty applications — the acquisition price typically represents less than 15% of the total cost over a five-year service horizon. Energy consumption, maintenance labour, unplanned downtime, and replacement logistics account for the remainder.

Energy Cost Reduction via IE2 Compliance. The M2AA series meets IE2 efficiency standards, which translates to measurable energy savings compared to legacy IE1 motors of equivalent output. For a motor running 6,000 hours per year, even a 2–3 percentage point efficiency gain reduces annual electricity expenditure by a meaningful margin — savings that compound across multi-motor installations.

Downtime Risk and Its Real Cost. Unplanned motor failure in a pump or fan application rarely results in just the cost of a replacement unit. Production stoppages, emergency sourcing premiums, expedited freight charges, and technician overtime can multiply the direct replacement cost by a factor of five or more. Sourcing from a distributor with verified stock — rather than relying on spot-market availability at the moment of failure — is a risk mitigation strategy, not merely a convenience. siemensplc.com maintains forward stock of high-turnover ABB M2AA frame motors precisely to support customers who cannot afford extended lead times.

Warranty Coverage and Maintenance Budget Predictability. The 12-month warranty provided on every unit sourced through siemensplc.com allows maintenance planners to exclude warranty-period repair costs from their OPEX forecasts. For facilities operating under fixed maintenance budgets, this predictability has direct value. A failed unit within the warranty window is replaced or credited — no negotiation, no ambiguity.

Third-Party Specialist vs. OEM Direct Channel. Sourcing through a specialist distributor like siemensplc.com reduces both CAPEX and OPEX in ways that OEM direct channels typically cannot match. Competitive unit pricing lowers the initial capital outlay. Faster order processing, flexible payment terms, and consolidated invoicing reduce the administrative cost embedded in each purchase transaction. For procurement teams managing hundreds of line items, these operational savings are real and recurring.

Quality & Compliance Assurance

Every ABB 3GAA082004-E unit dispatched from siemensplc.com is subject to a pre-shipment inspection protocol covering physical integrity, nameplate verification, shaft and bearing condition, and packaging adequacy. We do not list units we cannot physically verify.

  • 100% Genuine Product Commitment: All units are sourced through traceable supply channels. We do not knowingly handle counterfeit or remanufactured-as-new components. Documentation is available upon request.
  • Xiamen Customs Compliance: Export declarations are prepared in accordance with Chinese customs regulations. HS code classification, commercial invoices, and packing lists are issued accurately to support smooth import clearance at the destination country.
  • Multi-Currency Payment Support: We accept USD, EUR, HKD, and CNY. Wire transfer, PayPal, and trade finance arrangements are available for qualified buyers. Contact us to discuss payment terms for volume orders.
  • Documentation Package: Certificate of conformity, commercial invoice, packing list, and — where available — original ABB factory test records are provided with each shipment.

Strategic Sourcing from Xiamen

Xiamen is one of China’s five original Special Economic Zones and has developed into a mature international logistics hub with direct sea freight connections to major ports across Southeast Asia, Europe, the Middle East, and the Americas. Xiamen Gaoqi International Airport provides air freight capacity for time-critical shipments, with connections to major cargo hubs including Hong Kong, Singapore, and Frankfurt.

For industrial buyers, this geographic positioning translates into practical advantages. Standard sea freight from Xiamen to European ports runs 25–32 days. Air freight to the Middle East or Southeast Asia typically clears in 3–5 business days. Express courier services (DHL, FedEx, UPS) are available for single-unit or small-parcel orders requiring rapid delivery.

siemensplc.com’s Xiamen base also means direct access to China’s bonded warehouse infrastructure, enabling efficient consolidation of multi-line orders and reducing per-unit freight costs for buyers sourcing multiple part numbers in a single purchase order. For procurement teams managing global MRO supply chains, this consolidation capability is a tangible cost lever.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.