Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Siemens In Stock OK

Siemens A5E32100313 6SR0960-0CC07-1 I/O Board

Request verified availability, condition, replacement risk review, packing options and courier lead time for 6SR0960-0CC07-1.

Exact part6SR0960-0CC07-1 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandSiemens Part Number6SR0960-0CC07-1 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 6SR0960-0CC07-1

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Siemens
Primary Part Number
6SR0960-0CC07-1
Product Type
I/O Board
Series / Family
SINAMICS
Manufacturer
Siemens AG
Country of Origin
DE
Catalog Category
I/O Modules
Model confirmed for inquiry 6SR0960-0CC07-1 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

Siemens A5E32100313 / 6SR0960-0CC07-1 I/O Board — Stop the Clock on Your Downtime

Every minute a SINAMICS S120 drive sits dead on the floor, your production line is bleeding money. The Siemens A5E32100313 (Order No. 6SR0960-0CC07-1) I/O Board is the nerve center of the S120 drive’s signal routing — when it fails, the entire axis goes dark. We stock this board in Xiamen and ship same-day via DHL Express or FedEx International Priority. No waiting on factory lead times. No broker markups. Just the part, on your bench, fast.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Value
Part Number A5E32100313
Order Number 6SR0960-0CC07-1
Description I/O Board — Input/Output Signal Interface Card
Compatible Series SINAMICS S120 (Booksize & Chassis)
Manufacturer Siemens AG
Origin Germany
Weight 80 g
Condition New / Surplus New
Availability ✔ Ready to Ship — Xiamen Stock
Dispatch Same day if ordered before 15:00 CST

Troubleshooting & Replacement Tips

The A5E32100313 I/O Board handles all digital and analog I/O signal routing between the S120 Control Unit and external field devices. In the field, this board fails in predictable patterns — knowing them cuts your diagnostic time from hours to minutes.

Common Fault Signatures:

  • F07900 / F07901 (Drive: Motor encoder fault) — Often misdiagnosed as an encoder cable issue. If swapping the cable doesn’t clear it, the I/O board’s encoder interface circuitry is the next suspect. Check DRIVE-CLiQ port X200/X201 for bent pins or corrosion before condemning the board.
  • F30015 (Power unit: Phase failure) — When this fault appears without an actual phase loss at the incoming supply, the I/O board’s voltage sensing circuit may have failed. Verify with a multimeter at the DC bus before replacing.
  • A07850 (Drive: Motor overtemperature) — If the motor is confirmed cold but the alarm persists, the analog input channel on the I/O board reading the KTY/PTC sensor has likely drifted or shorted. Resistance-check the sensor circuit at the board connector.
  • No DRIVE-CLiQ communication / topology error after power cycle — The I/O board manages DRIVE-CLiQ node addressing. A corrupted address table causes the CU320-2 to reject the axis on startup. This is not recoverable by parameter reset alone — board replacement is required.

Replacement Procedure — Key Steps:

  • 1. Safe isolation first. Confirm DC bus voltage is below 50 V before touching any internal component. The S120 chassis units hold charge for up to 5 minutes after power-off. Use a calibrated meter — not the drive’s own display.
  • 2. Export parameters before removal. Use STARTER or TIA Portal to back up the drive’s parameter set (p0971 = 1 to save to memory card). The replacement board does not carry your axis configuration.
  • 3. Note the DIP switch positions. On certain S120 variants, the I/O board carries address DIP switches for PROFIBUS node ID or analog I/O range selection (0–10 V vs. 4–20 mA). Photograph the existing board before removal. Replicate exactly on the new unit.
  • 4. DRIVE-CLiQ re-topology. After fitting the new board, the CU320-2 will detect a topology change on first power-up. Accept the new topology in STARTER (p9905 / p9906 sequence) or via TIA Portal’s drive commissioning wizard. Do not skip this step — the drive will fault immediately if topology is not confirmed.
  • 5. Firmware version check. The A5E32100313 board must be compatible with the firmware version running on your CU320-2. Cross-reference the firmware release notes (available on Siemens Industry Online Support) before powering up. Mismatched firmware versions cause F01018 (firmware incompatible) and prevent the drive from running.
  • 6. Functional test under no-load. Before reconnecting the motor, run the drive in speed control with the motor decoupled. Verify all I/O signals (enable, fault reset, speed reference) are responding correctly. Only then reconnect the mechanical load.

Reliability in Harsh Conditions

The SINAMICS S120 platform — and the A5E32100313 I/O Board within it — is engineered to operate where most electronics would fail. Siemens validates this board against IEC 60068 environmental stress standards, which means it has been subjected to the same punishment your plant floor delivers every shift.

Vibration resistance is tested to IEC 60068-2-6 (sinusoidal) and IEC 60068-2-64 (random), covering the frequency ranges generated by heavy presses, compressors, and conveyor drives. The PCB layout uses conformal coating on critical signal traces, preventing micro-shorts caused by condensation in high-humidity environments — a common failure mode on cheaper aftermarket boards that skip this step.

Operating temperature range spans -10 °C to +55 °C (derating above 40 °C per Siemens specifications), with storage tolerance down to -40 °C. In foundry and steel mill applications where ambient temperatures routinely exceed 45 °C, the board’s thermal design — including copper pour heat spreading and low-ESR capacitor selection — provides the margin that keeps the drive running through a full production shift rather than tripping on thermal overload.

Humidity tolerance is rated to 95% RH non-condensing. The conformal coating and sealed connector housings prevent the creepage failures that take down unprotected boards in coastal or chemical processing environments. If your plant runs wet processes or is located near the sea, this matters more than any spec sheet number.

Global Express Logistics

Our warehouse is located in Xiamen, Fujian, China — one of China’s primary export hubs with direct access to DHL, FedEx, and UPS international gateways. This geography is deliberate: Xiamen’s port and air freight infrastructure means your part moves from our shelf to an international flight within hours, not days.

Standard Express Routing:

  • Southeast Asia (Singapore, Thailand, Vietnam, Malaysia): DHL Express — 1 to 2 business days from dispatch.
  • Europe (Germany, UK, Netherlands, Poland): FedEx International Priority — 3 to 4 business days from dispatch.
  • Middle East (UAE, Saudi Arabia, Qatar): DHL Express — 2 to 3 business days from dispatch.
  • North America (USA, Canada, Mexico): FedEx International Priority — 3 to 5 business days from dispatch.
  • Australia & New Zealand: DHL Express — 3 to 4 business days from dispatch.

Every shipment includes a full commercial invoice, packing list, and certificate of origin — all pre-prepared to clear customs without delay. For customers in the EU, we provide the necessary documentation for CE compliance verification. For customers in regulated industries (oil & gas, nuclear, aerospace), we can provide additional traceability documentation on request.

Orders placed before 15:00 CST are dispatched the same business day. You receive a tracking number within 2 hours of dispatch. We monitor all express shipments and proactively contact you if a customs hold or routing delay occurs — you are never left chasing a parcel in the dark.

Contact Information

For urgent requirements, stock confirmation, or technical pre-sales support, reach our engineering team directly:

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.