Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
GE Fanuc In Stock OK

GE 8920-PS-DC DC Power Supply Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for 8920-PS-DC.

Exact part8920-PS-DC RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Fanuc Part Number8920-PS-DC ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 8920-PS-DC

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE Fanuc
Primary Part Number
8920-PS-DC
Product Type
PLC Power Supply Module
Series / Family
Fanuc
Manufacturer
GE Fanuc Automation
Country of Origin
US
Catalog Category
Power Supplies
Model confirmed for inquiry 8920-PS-DC Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE 8920-PS-DC: Stop the Clock on Your Downtime — DC Power Restored in 24–72 Hours

Every minute your Series 90-30 rack sits dark costs real money. A failed DC power supply module doesn’t announce itself — it just kills the rack, trips the line, and puts your maintenance team in firefighting mode. The GE 8920-PS-DC is the exact module you need to get back online fast. We stock it in Xiamen, we ship it globally via DHL/FedEx, and we’ve done this enough times to know that speed is the only thing that matters when production is stopped.

This is not a generic listing. The 8920-PS-DC is a DC-input power supply module purpose-built for the GE Fanuc Series 90-30 PLC platform. It slots directly into any 5-slot or 10-slot Series 90-30 baseplate — no adapters, no firmware flashing, no re-addressing. Pull the dead unit, seat the replacement, restore power, and your CPU picks up where it left off.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification
Part Number / SKU 8920-PS-DC
Manufacturer GE Fanuc Automation
Platform / Series Series 90-30 PLC
Module Type DC Input Power Supply Module
Input Voltage 24 VDC (nominal); refer to GFK-0356 for revision-specific range
Form Factor Single-slot rack-mount, Series 90-30 native
Compatible Baseplates IC693CHS391 (5-slot), IC693CHS392 (10-slot)
Certifications UL 508, CE (EMC + LVD), RoHS, IEC 61131-2
Weight ~1,500 g
Origin China (Xiamen stocking hub)
Availability ✔ Ready to Ship — Same/Next Business Day

Troubleshooting & Replacement Tips

Symptom pattern that points to the 8920-PS-DC: Rack goes dark with no CPU heartbeat LED, no I/O activity, and no fault code on the programmer — the PSU is the first suspect. If the CPU LED is blinking a fault code but the rack is powered, look elsewhere. If the rack is completely dead, start here.

Step-by-step hot-swap procedure:

  • Step 1 — Isolate: De-energize the DC input feed to the rack. Confirm zero volts at the PSU input terminals with a meter before touching anything. The 8920-PS-DC does not have an internal breaker — upstream isolation is mandatory.
  • Step 2 — Document: Photograph the wiring at the PSU input terminals before disconnecting. Terminal labeling on aged units can be worn. Note the DC polarity — reversed polarity on reinstallation will destroy the replacement unit instantly.
  • Step 3 — Extract: Loosen the two captive screws on the module faceplate. Slide the module straight out of the slot. Do not rock or twist — the backplane connector is fragile on aged baseplates.
  • Step 4 — Inspect the baseplate connector: Before seating the new unit, visually inspect the backplane connector pins for bent contacts or carbon scoring. A damaged backplane will kill a new PSU within minutes of power-up.
  • Step 5 — Seat the replacement: Align the 8920-PS-DC with the slot guides and push firmly until the faceplate is flush. Tighten the captive screws finger-tight plus a quarter turn — over-torquing cracks the faceplate.
  • Step 6 — Reconnect and power up: Reconnect DC input wiring with correct polarity. Restore the upstream feed. The CPU should boot within 3–5 seconds. If the rack powers up but the CPU faults immediately, check for a low-battery condition on the IC693ACC300 memory backup — a dead battery after a power cycle will cause the CPU to lose its program and fault on startup.

Common fault codes associated with PSU failure on Series 90-30:

  • PLC FAULT TABLE — POWER SUPPLY FAULT: Logged when the PSU output drops below regulation threshold. Often precedes complete failure by hours or days — treat this as a warning to pre-stage a replacement.
  • CPU LED: Solid Red / No Blink: Indicates the CPU is not receiving adequate power. Confirm PSU output rails before condemning the CPU module.
  • Intermittent rack resets with no fault logged: Classic symptom of a PSU with failing bulk capacitors. The module appears functional under light load but collapses under full I/O load. Swap the PSU first.

Configuration notes — no DIP switches, no addressing: The 8920-PS-DC requires zero configuration. There are no DIP switches, no rotary address selectors, and no firmware to match. It is a passive power conversion module — seat it and it works. The only variable is input DC voltage; confirm your plant’s DC bus voltage matches the module’s rated input range per GFK-0356 before installation.

Reliability in Harsh Conditions

The Series 90-30 platform was designed for the factory floor, not the server room, and the 8920-PS-DC reflects that. The module’s internal construction uses industrial-grade bulk capacitors rated for extended temperature ranges, not the consumer-grade components found in counterfeit or grey-market substitutes. This matters when your control panel is sitting next to a furnace, a press, or a washdown station.

Vibration is the silent killer of rack-mount electronics. The 8920-PS-DC’s backplane connector and internal PCB mounting are designed to IEC 61131-2 mechanical stress requirements, which include sinusoidal vibration testing across the 10–57 Hz range at 0.075 mm amplitude and 57–150 Hz at 1g. In practice, this means the module survives the constant low-frequency vibration of compressor rooms, stamping presses, and mobile equipment enclosures without connector fretting or solder joint fatigue.

Thermal performance is equally critical. Industrial panels routinely see internal temperatures of 50–60°C in summer without forced cooling. The 8920-PS-DC is rated for operation across the full Series 90-30 ambient temperature envelope. Units sourced from siemensplc.com are inspected for capacitor bulge and thermal damage before shipment — a failed capacitor in a PSU is not always visible externally, which is why functional testing under load is part of our pre-ship verification.

Humidity and condensation are the third axis of failure. The module’s conformal coating on the PCB provides a baseline level of protection against moisture ingress in non-condensing environments. For installations in high-humidity environments such as coastal facilities or outdoor enclosures, ensure the panel has adequate thermal management to prevent condensation cycles — no PSU module, regardless of brand, survives repeated condensation without eventual failure.

Global Express Logistics

Our stocking hub is in Xiamen, China — one of the most logistics-connected cities in Southeast Asia, with direct DHL and FedEx service to every major industrial hub globally. When you place an urgent order before 14:00 CST, the unit ships the same business day. Here is what the timeline looks like in practice:

  • Order confirmed → Packed and labeled: Within 2 hours of payment confirmation during business hours.
  • Xiamen → DHL/FedEx hub: Same-day pickup by carrier. Tracking number issued to you within 4 hours of shipment.
  • Xiamen → Southeast Asia (SG, MY, TH, VN): 1–2 business days, DHL Express.
  • Xiamen → Middle East (AE, SA, QA): 2–3 business days, FedEx International Priority.
  • Xiamen → Europe (DE, NL, PL, UK): 3–4 business days, DHL Express Worldwide.
  • Xiamen → North America (US, CA, MX): 3–5 business days, FedEx International Priority.
  • Xiamen → Australia / New Zealand: 3–4 business days, DHL Express.

All shipments include commercial invoice, packing list, and country-of-origin documentation. For customers requiring formal import clearance support or HS code documentation (HS 8537.10 for PLC modules), we provide the necessary paperwork at no additional charge. Customs duties and import VAT are the buyer’s responsibility and vary by destination country.

For orders requiring split shipment, partial delivery, or freight consolidation with other automation parts, contact us directly — we handle complex logistics requirements for MRO procurement teams and EPC contractors regularly.

Contact Information

Ready to order or need a formal quotation for your procurement team?

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.