GE DS200TCEAG1AGB Turbine Overspeed Board
Request verified availability, condition, replacement risk review, packing options and courier lead time for DS200TCEAG1AGB.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- GE
- Primary Part Number
- DS200TCEAG1AGB
- Product Type
- Turbine Control Board
- Series / Family
- Mark VI
- Manufacturer
- General Electric (GE)
- Country of Origin
- US
- Model Function
- Emergency Overspeed Protection Board
- Catalog Category
- Relays & Protection
- Warranty
- 12 months from date of shipment
GE DS200TCEAG1AGB Emergency Overspeed Protection Board — A Procurement Manager’s Sourcing Guide
When a turbine trips unexpectedly, the financial exposure is immediate: lost generation revenue, emergency maintenance mobilization, and the cascading risk of contractual penalties. The GE DS200TCEAG1AGB Emergency Overspeed Protection Board is the hardware standing between controlled operation and catastrophic mechanical failure inside a Mark VI Turbine Control System. For procurement teams managing MRO budgets across power generation, petrochemical, or heavy industrial facilities, the sourcing strategy for this board deserves the same rigor applied to any capital-intensive asset decision.
The DS200TCEAG1AGB is not a commodity item. It is a safety-critical PCB module embedded within GE’s Speedtronic Mark VI architecture — a platform that remains operational across hundreds of combined-cycle and simple-cycle gas turbine installations worldwide. OEM lead times for this board routinely extend to 16–26 weeks, a window that is operationally unacceptable for facilities running on tight maintenance schedules. siemensplc.com maintains verified stock and an active global sourcing network specifically to close that gap, delivering confirmed units in 3–21 business days depending on configuration and destination.
This is a board with a well-established installed base, which means the secondary market is mature and pricing is competitive — provided you work with a supplier who has the technical depth to verify authenticity and the logistics infrastructure to deliver reliably. That is precisely the value proposition this page is designed to substantiate.
📩 Request an Official Quote: [email protected] | WhatsApp: +86 18359268345
Procurement Specifications
| Part Number | DS200TCEAG1AGB |
| Manufacturer | General Electric (GE) |
| Series | Mark VI Turbine Control System (Speedtronic) |
| Function | Emergency Overspeed Protection Board |
| Form Factor | PCB Module / VME Rack-Mount Card |
| Compatible Platforms | GE Mark VI, Mark VIe; DS200 Series I/O family |
| Typical Applications | Gas turbine, steam turbine, combined-cycle power plants, refinery turbomachinery |
| Unit Weight | Approx. 980 g |
| Condition Available | New-surplus / Tested-refurbished (specify at inquiry) |
| Warranty | 12 months from date of shipment |
| Lead Time — In-Stock | 3–5 business days (Xiamen warehouse dispatch) |
| Lead Time — Sourced | 7–21 business days (global network procurement) |
| Export Documentation | Commercial invoice, packing list, certificate of origin, HS code classification |
| Payment Terms | T/T bank transfer, PayPal, multi-currency wire (USD, EUR, HKD, CNY) |
| Origin | United States (OEM); supplied via Xiamen, China |
Total Cost of Ownership (TCO) Analysis
Procurement decisions for safety-critical automation components are rarely evaluated on unit price alone — and they should not be. The DS200TCEAG1AGB sits at the intersection of two cost categories that finance and operations teams often account for separately but should analyze together: CAPEX exposure from unplanned downtime and OPEX drag from extended sourcing cycles.
Downtime cost modeling: A mid-size combined-cycle gas turbine generating 400 MW at a capacity factor of 85% represents roughly $15,000–$40,000 per hour in lost revenue depending on power purchase agreement terms and spot market conditions. An overspeed board failure that grounds a unit for 10 days while waiting on OEM supply translates directly into six-figure exposure — before accounting for emergency labor, expedited freight, and regulatory reporting obligations. Sourcing a verified spare from siemensplc.com at a fraction of OEM pricing, with a 3–5 day delivery window, converts a potential $300,000+ downtime event into a manageable maintenance line item.
Inventory carrying cost vs. sourcing risk: Many facilities choose not to carry a DS200TCEAG1AGB as a shelf spare due to its unit cost. This is a defensible position when a reliable third-party supplier can guarantee sub-week delivery. The effective carrying cost of maintaining a supplier relationship with siemensplc.com — zero — compares favorably to the working capital tied up in a self-managed spare parts inventory program.
Warranty and lifecycle value: The 12-month warranty included with every unit from siemensplc.com directly reduces OPEX by eliminating the risk of absorbing a second procurement cost within the same budget cycle. For facilities operating under fixed O&M contracts, this warranty coverage translates into a quantifiable risk transfer that strengthens the business case for third-party sourcing over OEM channels.
Supplier consolidation efficiency: Procurement teams managing multi-brand automation environments — GE Mark VI alongside Siemens SIMATIC, ABB, or Rockwell platforms — benefit from consolidating sourcing through a specialist distributor rather than managing separate OEM relationships for each brand. siemensplc.com’s cross-brand inventory capability reduces purchase order overhead, simplifies vendor qualification processes, and shortens the approval cycle for emergency requisitions.
Quality & Compliance Assurance
Every DS200TCEAG1AGB unit shipped from siemensplc.com carries a 100% genuine parts commitment. We do not list, stock, or knowingly source counterfeit, unauthorized reproduction, or non-conforming components. Our verification process includes visual inspection against GE reference documentation, serial number traceability cross-check, and functional bench testing where applicable.
All export transactions are processed through Xiamen Customs in full compliance with Chinese export regulations. Shipments are accompanied by a complete documentation package: commercial invoice, packing list, certificate of origin, and HS code classification (typically 8537.10 for programmable control boards). This documentation set is designed to satisfy import clearance requirements in the EU, North America, Southeast Asia, and the Middle East without additional preparation on the buyer’s side.
Payment flexibility is a practical compliance consideration for multinational procurement teams operating under treasury policies that restrict certain payment channels. siemensplc.com supports multi-currency settlement including USD, EUR, HKD, and CNY via T/T bank transfer, PayPal, and trade assurance platforms — removing friction from the purchase authorization process regardless of your organization’s financial controls.
Strategic Sourcing from Xiamen
Xiamen is not an arbitrary logistics point. It is one of China’s five original Special Economic Zones and home to Xiamen Gaoqi International Airport — a cargo hub with direct freight connections to Frankfurt, Amsterdam, Los Angeles, Dubai, and Singapore. The Port of Xiamen ranks among the top 15 container ports globally by throughput, with established sea freight lanes to every major industrial economy.
For industrial buyers, this geography translates into practical advantages. Air freight from Xiamen to European destinations via DHL or FedEx typically clears customs within 5–7 business days. Sea freight consolidation is available for multi-unit orders where cost efficiency outweighs speed. The proximity to Shenzhen and Guangzhou electronics manufacturing clusters also means that siemensplc.com’s sourcing network can access secondary market inventory across the Pearl River Delta with shorter internal transit times than suppliers based in inland provinces.
Xiamen’s established free trade zone infrastructure further simplifies re-export documentation for buyers in Southeast Asia and the Middle East who require bonded warehouse handling or triangular trade arrangements. This is a meaningful operational advantage for regional procurement hubs managing supply chains across multiple jurisdictions.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Website: siemensplc.com
Response time: within 4 business hours for standard inquiries; emergency sourcing requests prioritized.
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.