Honeywell MY2N-J 24VDC 2-M4X10 PYF08A-E Relay Socket
Request verified availability, condition, replacement risk review, packing options and courier lead time for MY2N-J.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- Honeywell
- Primary Part Number
- MY2N-J
- Product Type
- Relay Socket
- Product Family
- Other series
- Manufacturer
- Honeywell
- Country of Origin
- US
- Catalog Category
- Relays & Protection
Honeywell MY2N-J 24VDC 2-M4X10 PYF08A-E — Stop the Clock on Your Downtime
Every minute a line sits idle costs real money. If your control panel just threw a relay fault and you’re staring at a dead PYF08A-E socket, you already know the math. This page exists for one reason: get you the Honeywell MY2N-J 24VDC 2-M4X10 PYF08A-E relay socket — verified original, physically in stock in Xiamen — and put it on a plane to your facility before your next shift change.
We don’t broker. We don’t drop-ship from unknown warehouses. The unit ships from our own bonded stock, inspected before it leaves the shelf. DHL Express or FedEx IP, your choice. That’s the pitch. Everything below is the engineering detail you need to confirm fit and execute the swap correctly.
URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Manufacturer | Honeywell |
| Full Part Number | MY2N-J 24VDC 2-M4X10 PYF08A-E |
| Series | MY Series — Miniature Power Relay |
| Socket Model | PYF08A-E |
| Relay Compatibility | MY2N-J 24VDC (DPDT, 2-pole) |
| Pin Count | 8-Pin |
| Pole Configuration | DPDT (Double Pole Double Throw) |
| Coil Voltage | 24 VDC |
| Terminal Screw | M4 × 10 mm |
| Mounting | 35 mm DIN Rail (EN 60715) |
| Housing Material | Flame-retardant thermoplastic |
| Certifications | CE / UL / RoHS |
| Origin | China (CN) |
| Stock Status | ✅ Ready to Ship — Xiamen Bonded Stock |
| Lead Time | Same-day dispatch for orders confirmed before 15:00 CST |
Troubleshooting & Replacement Tips
Most common failure modes for the PYF08A-E socket in field service:
1. Burnt or pitted terminal contacts. The M4 screw terminals on the PYF08A-E are rated for repeated torque cycles, but in high-vibration environments — conveyors, compressors, press lines — terminal screws back off over time. Arcing follows. If you’re seeing intermittent coil activation with no relay fault code, pull the socket and inspect pins 1, 5 (coil terminals) and 3, 4, 7, 8 (load contacts) under magnification before condemning the relay itself. A pitted socket with a good relay is a common misdiagnosis that wastes a MY2N-J.
2. DIN rail clip fatigue. The snap-fit retention tab on the PYF08A-E can crack after repeated removal cycles — especially in panels that get serviced frequently. If the socket rocks on the rail, the 8-pin contact alignment shifts and you’ll get erratic switching. Replace the socket, not just the relay.
3. Pin corrosion in humid environments. Coastal plants, food processing, and outdoor enclosures with inadequate IP ratings see silver-plated pin oxidation on the 8-pin blade contacts. Resistance climbs, coil current drops below pull-in threshold, relay chatters. Clean with contact cleaner first — if resistance across pins 3–4 or 7–8 exceeds 0.5 Ω under load, the socket is done.
Replacement procedure — step by step:
- De-energize the circuit. Verify zero voltage at coil terminals (pins 1 and 5) with a calibrated meter. Lock out / tag out per your site procedure.
- Photograph the existing wiring layout before disconnecting. The PYF08A-E terminal numbering is printed on the socket body but faded units in old panels cause re-wiring errors.
- Loosen all M4 terminal screws and remove conductors. Note wire ferrule condition — replace any damaged ferrules during this opportunity.
- Press the DIN rail release tab downward and tilt the socket off the rail. Do not pry from the relay body — the MY2N-J plug-in connection is not designed for lateral force.
- Snap the new PYF08A-E onto the rail. Confirm positive engagement — you should hear and feel the clip seat.
- Re-terminate wires to the correct pin positions. Torque M4 screws to 1.2 N·m. Do not over-torque — the thermoplastic body will crack.
- Insert the MY2N-J 24VDC relay into the socket. Align the relay body guide key with the socket slot. Press firmly until fully seated — partial seating causes intermittent contact on pins 3 and 7.
- Re-energize and verify coil pull-in at 24 VDC nominal. Check output contact continuity across the load circuit before returning to service.
Configuration note: The MY2N-J has no DIP switches or firmware. It is a passive electromechanical relay. No addressing, no parameterization. The only configuration variable is coil voltage — confirm your control supply is 24 VDC ±10% before installation. Applying 110 VAC to a 24 VDC coil destroys the relay and may damage the socket terminals.
Reliability in Harsh Conditions
The PYF08A-E socket is built for the kind of environment where relays actually fail. The flame-retardant thermoplastic housing is rated to withstand continuous operating temperatures from -40 °C to +70 °C — covering everything from unheated outdoor enclosures in northern climates to heat-loaded control cabinets in steel mills and foundries.
Vibration resistance is a real design parameter, not a marketing claim. The M4 × 10 terminal screws provide a clamping force that maintains conductor contact under the sustained vibration profiles typical of press lines, compressors, and rotating machinery. The DIN rail snap-fit geometry is designed to resist vertical and lateral shock loads without the socket walking off the rail.
In high-humidity environments — coastal facilities, food processing plants, wash-down areas — the socket’s sealed terminal cavities slow the ingress of moisture and airborne contaminants that accelerate contact oxidation. This is not a substitute for proper enclosure IP rating, but it extends service intervals in marginal installations.
CE, UL, and RoHS certifications are not checkbox compliance. They represent tested performance against IEC 61810 relay standards, UL 508 industrial control equipment requirements, and EU hazardous substance restrictions. Every unit we ship carries full traceability to the original Honeywell production batch.
Global Express Logistics
Our dispatch hub is in Xiamen, Fujian — one of China’s primary export ports with direct DHL and FedEx gateway access. Here’s how the logistics chain works from the moment you confirm your order:
Day 0 (Order Confirmation): Orders confirmed before 15:00 CST are picked, inspected, and packed the same day. Export documentation — commercial invoice, packing list, certificate of origin — is prepared in parallel.
Day 1 (Dispatch): Shipment handed to DHL Express or FedEx International Priority. Tracking number issued to your email within 2 hours of pickup scan. For urgent orders, we can arrange DHL On-Demand Delivery for real-time rerouting if your facility address changes.
Transit Times (estimated from Xiamen):
- Southeast Asia (Singapore, Thailand, Vietnam): 2–3 business days
- Middle East (UAE, Saudi Arabia, Qatar): 3–4 business days
- Europe (Germany, Netherlands, UK): 4–5 business days
- North America (USA, Canada): 4–6 business days
- Australia / New Zealand: 3–5 business days
All shipments include full export customs clearance from the China side. For import clearance, we provide HS code documentation (HS 8536.49 for relay sockets) and MSDS/COC on request to support your customs broker. We have active experience shipping to EU, US, GCC, ASEAN, and South American markets and can advise on destination-specific documentation requirements before you place the order.
For orders of 20+ units, sea freight consolidation via Xiamen port is available with 7–14 day transit to most major ports. Contact us for a freight quote.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.