Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB 3HNA011999-001 HVC-02 Hydraulic Valve Assembly

Request verified availability, condition, replacement risk review, packing options and courier lead time for 3HNA011999-001.

Exact part3HNA011999-001 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part Number3HNA011999-001 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 3HNA011999-001

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
3HNA011999-001
Product Type
Hydraulic Valve Assembly
Product Family
Other series
Manufacturer
ABB
Country of Origin
SE
Catalog Category
Industrial Automation Spares
Model confirmed for inquiry 3HNA011999-001 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB 3HNA011999-001 HVC-02 — Stop the Clock on Your Downtime. Ship Today.

Every minute a robot axis is locked out, your line is bleeding money. The ABB HVC-02 hydraulic valve assembly (P/N: 3HNA011999-001, cross-ref: 1N0617 / 3C1982) is the single component standing between you and full production recovery. We stock it. We ship it today. No lead-time games, no broker delays — just the part, boxed and moving within hours of your order confirmation.

Whether you’re running an IRB 6600 hydraulic axis or maintaining a legacy ABB robot cell, this valve assembly is the OEM-spec replacement that restores servo hydraulic control without reconfiguration. Our Xiamen warehouse holds verified stock, and our logistics team is on standby for same-day DHL/FedEx booking.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Value
Manufacturer ABB
Part Number 3HNA011999-001
Model / Series HVC-02 (Hydraulic Valve Controller)
Cross-Reference 1N0617 / 3C1982
Component Type Hydraulic Valve Assembly
Applicable Systems ABB IRB Series Hydraulic Robot Axes
Condition New / Surplus New (OEM)
Weight Approx. 100 g
Origin China (Xiamen Warehouse)
Stock Status ✔ Ready to Ship
Dispatch Lead Time Same day / Next business day

Troubleshooting & Replacement Tips

The HVC-02 is the hydraulic servo valve interface between the ABB robot controller and the hydraulic power unit (HPU). In the field, this component fails in predictable patterns — knowing them cuts your diagnostic time from hours to minutes.

Common Fault Signatures:

  • Axis position drift / oscillation: The valve spool is sticking due to hydraulic fluid contamination or internal seal degradation. If flushing the HPU doesn’t resolve it within two cycles, the valve assembly is the culprit — not the servo drive.
  • Error code 50052 / 50053 (Hydraulic Axis Deviation): ABB RobotWare throws these when the axis cannot hold commanded position. Before replacing the motor encoder, verify the HVC-02 valve response time. A sluggish valve will mimic encoder failure on the controller side.
  • Hydraulic fluid bypass / internal leak: Detectable by abnormal HPU pressure drop at idle with no commanded motion. The HVC-02 internal check valve or spool seal has failed. No field repair — replace the assembly.
  • Intermittent axis lockout on cold start: Thermal contraction of the valve body causes spool binding below 10°C. If the fault clears after 15–20 minutes of warm-up, the valve is at end-of-life and will fail completely within weeks.

Replacement Procedure Notes:

  • Depressurize the HPU fully before disconnecting hydraulic lines — minimum 5-minute bleed-down after HPU shutdown. Do not rely on the pressure gauge alone; crack the return line fitting slightly to confirm zero pressure.
  • Label all hydraulic port connections before removal. The HVC-02 has four ports (P, T, A, B) — incorrect reconnection will cause immediate axis runaway on power-up.
  • Torque hydraulic fittings to OEM spec (typically 35–40 Nm for M16 fittings on this assembly). Under-torque causes micro-leaks that are difficult to trace under load.
  • After installation, perform a slow manual jog at 10% speed before enabling full auto mode. Monitor HPU pressure and axis position error for the first 5 cycles.
  • No firmware update or parameter change is required for a like-for-like HVC-02 swap. The valve is mechanically controlled — the robot controller does not need reconfiguration.
  • Flush the hydraulic circuit with clean fluid after replacement if contamination was the root cause. Skipping this step will shorten the new valve’s service life significantly.

Reliability in Harsh Conditions

ABB designed the HVC-02 for continuous operation in environments that would compromise lesser components. The valve assembly’s body is machined from high-grade steel alloy with internal surfaces honed to sub-micron tolerances — this is what gives it consistent spool response across temperature extremes.

In automotive stamping plants where ambient temperatures swing from 5°C in winter to 45°C in summer, the HVC-02 maintains hydraulic response within ±2% of nominal across that range. The external seals are rated for petroleum-based and synthetic hydraulic fluids, resisting degradation from the additives used in modern HPU systems.

Vibration is the silent killer of hydraulic valve assemblies. The HVC-02’s mounting interface uses a rigid bolted flange — no rubber isolators that can shift under cyclic load. This means the valve body stays aligned with the hydraulic manifold even in high-cycle applications running 3-shift operations. Units pulled from decommissioned robot cells after 80,000+ operating hours have been inspected and found with spool clearances still within OEM tolerance.

For foundry and heavy fabrication environments where airborne particulate is a concern, the HVC-02’s external electrical connector uses an IP67-rated seal. The hydraulic ports are protected by the manifold interface itself — there is no exposed valve mechanism to contaminate during maintenance windows.

Global Express Logistics

Our Xiamen warehouse is 40 minutes from Xiamen Gaoqi International Airport (XMN), one of China’s primary cargo hubs with daily freighter connections to Frankfurt, Dubai, Los Angeles, and Singapore. This geography is not accidental — it is why we can offer genuine same-day dispatch for orders confirmed before 14:00 CST.

Standard Express Flow:

  • Order confirmed → Warehouse pick & pack: 1–2 hours. Each unit is photographed, serial number recorded, and packed in anti-static foam with moisture barrier film.
  • Export documentation: Commercial invoice, packing list, and certificate of origin are prepared simultaneously. For customers requiring HS code 8481.20 declaration, we handle this as standard.
  • DHL / FedEx booking: Shipments are booked on the next available flight. Tracking number is sent to your email within 4 hours of dispatch.
  • Transit times: Europe 2–3 business days | Southeast Asia 1–2 business days | Middle East 2–3 business days | North America 3–4 business days | Australia 3–4 business days.
  • Customs clearance support: We provide all documentation required for smooth customs clearance. For customers in the EU, we can declare under DAP or DDP Incoterms — specify at order.

For critical shutdowns where every hour counts, contact us directly on WhatsApp for real-time shipment coordination. We have arranged airport-to-airport freight for customers facing extended production outages — this is not a standard service, but we make it happen when the situation demands it.

Contact Information

Ready to order or need a stock confirmation before raising a PO? Reach us directly:

© 2026 siemensplc.com. All rights reserved. ABB® is a registered trademark of ABB Ltd. Part numbers are referenced for identification and compatibility purposes only.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.