Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB 1SDA063550R1 Auxiliary Contact Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for SCR-1SDA063550R1.

Exact partSCR-1SDA063550R1 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberSCR-1SDA063550R1 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ SCR-1SDA063550R1

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
SCR-1SDA063550R1
Product Type
Auxiliary Contact Module
Series / Family
SACE
Manufacturer
ABB
Country of Origin
SE
Catalog Category
Industrial Automation Spares
Model confirmed for inquiry SCR-1SDA063550R1 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB 1SDA063550R1 SCR Auxiliary Contact — Stop the Clock on Your Downtime

Every minute your switchgear is offline, production bleeds money. A failed auxiliary contact on your SACE Emax 2 breaker kills position feedback to your PLC, locks out your interlock logic, and grounds your entire distribution panel. The ABB 1SDA063550R1 SCR module is the exact OEM replacement you need — and we have it on the shelf in Xiamen, ready to move today.

We don’t deal in compatible substitutes or grey-market pulls. This is a genuine ABB part, sourced through verified channels, pre-inspected before it leaves our warehouse. If your maintenance window is measured in hours, not days, you’re in the right place.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Part Number 1SDA063550R1  ✅ Ready to Ship
Manufacturer ABB
Series SACE Emax 2
Module Type SCR — Auxiliary / Signaling Contact
Compatible Frames E1.2, E2.2, E4.2, E6.2
Rated Voltage ≤ 250 V AC/DC
Rated Current ≤ 6 A
Contact Material Silver-Nickel Alloy (AgNi)
Mounting Plug-in snap-fit, tool-free
Operating Temperature -25°C to +70°C
Protection Class IP20 (installed)
Standards IEC 60947-2, CE Marked
Country of Origin Italy
Weight ~120 g
Stock Status ✅ In Stock — Ships within 24 hrs

Troubleshooting & Replacement Tips

Common failure symptoms for 1SDA063550R1:

  • PLC digital input for breaker position (Q0.x / I0.x) shows no signal change on OPEN/CLOSE command — contact weld or open-circuit failure in the SCR module.
  • SCADA reports persistent “breaker status unknown” or “feedback timeout” alarm — cam follower worn, contact no longer actuating.
  • Interlock logic refuses to permit bus transfer — position feedback stuck in last state, preventing permissive signal.
  • Intermittent contact bounce causing spurious trip signals in relay logic — silver alloy surface pitting after high-cycle operation.

Replacement procedure (field-verified steps):

  1. De-energize and isolate. Rack the Emax 2 breaker to the TEST or DISCONNECTED position. Verify zero-energy state with a calibrated voltage tester on the auxiliary circuit terminals before touching anything.
  2. Identify the accessory slot. Refer to ABB Doc. 1SDH001000R0002 (Emax 2 Accessory Combination Chart) to confirm the SCR slot position on your specific frame size. On E1.2/E2.2, the SCR typically occupies the right-side accessory bay.
  3. Remove the failed module. Press the release tab and pull the module straight out — no tools required. Inspect the slot for debris or carbon tracking before inserting the replacement.
  4. Insert 1SDA063550R1. Align the module with the slot guide rails and push firmly until the retention clip audibly clicks. Do not force — misalignment will damage the cam follower on first operation.
  5. Verify mechanical actuation. Manually operate the breaker (TEST position) and confirm the auxiliary contact switches state. Use a continuity tester on the terminal block before reconnecting control wiring.
  6. Restore wiring and test under load. Reconnect the auxiliary circuit wiring (shielded twisted-pair recommended for runs >10 m). Perform a full OPEN/CLOSE cycle from the control panel and verify PLC/SCADA feedback registers correctly.
  7. No firmware or address configuration required. The SCR module is a purely mechanical/electrical device — no DIP switches, no addressing, no firmware. Plug in and verify continuity. That’s it.

Critical compatibility check: This module is Emax 2 only. It is NOT interchangeable with first-generation SACE Emax accessories. The mechanical interface changed between generations. Verify your breaker nameplate reads “Emax 2” before ordering.

Reliability in Harsh Conditions

Industrial switchgear rooms are not clean environments. Vibration from nearby motors and compressors, ambient temperatures pushing 55°C in summer, humidity cycling from condensation during plant shutdowns — the 1SDA063550R1 is built to handle all of it without complaint.

ABB’s AgNi silver-nickel contact material maintains stable contact resistance across thousands of switching cycles, resisting the micro-welding and oxidation that kills cheaper contact materials in high-humidity environments. The snap-fit housing is rated to withstand the vibration profiles typical of MCC installations per IEC 60068-2-6, so you won’t see nuisance contact bounce from panel vibration alone.

Operating range of -25°C to +70°C covers everything from unheated outdoor switchgear enclosures in northern climates to hot process areas in petrochemical plants. IP20 protection when installed prevents accidental contact with live parts during panel maintenance — a non-negotiable in facilities with strict arc-flash programs.

Mechanical endurance is rated in line with the Emax 2 breaker’s own operating cycle life — typically exceeding 10,000 operations under standard duty. For high-cycle applications like bus-tie breakers that operate multiple times per day, plan a proactive replacement interval and keep a spare on the shelf. The cost of one unplanned outage dwarfs the price of a spare module.

Global Express Logistics

Our warehouse is located in Xiamen, China — one of the country’s primary export hubs with direct access to DHL, FedEx, and UPS international gateways. Orders confirmed before 15:00 CST ship same day. Here’s what the timeline looks like from your purchase order to your panel room:

  • Day 0 (Order Confirmed): Part pulled from shelf, inspected, packed in anti-static protective packaging. Shipping label generated and handed to carrier by end of business.
  • Day 1–2 (In Transit — Asia/Pacific): DHL Express or FedEx International Priority clears Xiamen customs. Tracking number sent to your email immediately upon pickup scan.
  • Day 2–3 (Delivery — Southeast Asia, Japan, Korea, Australia): Most regional destinations receive within 2–3 business days door-to-door.
  • Day 3–5 (Delivery — Europe, Middle East, Americas): Transatlantic and long-haul routes typically deliver within 3–5 business days depending on destination customs clearance speed.

For genuinely critical situations — plant shutdown with a hard restart deadline — contact us directly on WhatsApp before placing the order. We can confirm real-time stock, arrange priority pick, and coordinate with the carrier for earliest possible flight booking. We’ve done it before. We’ll do it again.

All shipments include a commercial invoice, packing list, and country-of-origin certificate. For projects requiring an ABB Declaration of Conformity or test documentation, request it at time of order and we’ll include it in the shipment package.

Contact Information

📧 Email: [email protected]
💬 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.