ABB 1SAR330020R0000 CT-ARS Time Delay Relay
Request verified availability, condition, replacement risk review, packing options and courier lead time for CT-ARS.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- ABB
- Primary Part Number
- CT-ARS
- Product Type
- Time Delay Relay
- Series / Family
- Fast Replacement
- Manufacturer
- ABB Ltd.
- Country of Origin
- SE
- Model Function
- Star-Delta Motor Starting Time Delay
- Catalog Category
- Relays & Protection
- Operating Temp.
- −25 °C to +55 °C
ABB 1SAR330020R0000 Down? Every Minute of Downtime Costs You Money — We Ship Today
Your star-delta starter just tripped and the CT-ARS timing relay is the culprit. The motor won’t start, the line is cold, and your maintenance window is closing fast. You don’t need a lecture on relay theory — you need a verified, ready-to-ship ABB 1SAR330020R0000 in your hands before the next shift. That’s exactly what we do.
We stock the ABB 1SAR330020R0000 CT-ARS star-delta time delay relay in Xiamen, China, with same-day dispatch on confirmed orders. DHL Express puts it on your bench in 2–5 business days, anywhere on the planet. No sourcing delays, no grey-market gambles, no excuses. While your competitors are still waiting on a quote, your line is already back up.
URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Parameter | Specification |
|---|---|
| Part Number | 1SAR330020R0000 |
| Manufacturer | ABB Ltd. |
| Series | CT-ARS (Star-Delta Timing) |
| Function | Star-Delta Motor Starting Time Delay |
| Timing Range | 1 – 30 s (front-panel adjustable) |
| Supply Voltage | 24 – 240 V AC/DC (universal input) |
| Frequency | 50 / 60 Hz |
| Output Contacts | 2 CO (SPDT) — Star + Delta changeover |
| Contact Rating | 8 A / 250 V AC (resistive) |
| Mounting | 35 mm DIN rail |
| Housing Width | 22.5 mm |
| Protection Rating | IP20 (front panel, finger-safe) |
| Operating Temperature | −25 °C to +55 °C |
| Certifications | CE, UL, cUL, CCC, RoHS |
| Weight | 140 g |
| Stock Status | ✅ Ready to Ship — Xiamen Warehouse |
Troubleshooting & Replacement Tips
Common failure modes on the CT-ARS in the field:
- Relay fires immediately on power-up (no star delay): The timing potentiometer wiper has worn to minimum resistance — common after 5+ years of vibration. Confirm by measuring resistance across timing terminals before condemning the contactor. Replace the relay; do not attempt to re-calibrate the pot.
- Star-to-delta transition never occurs (motor stays in star): Check the output CO contact continuity with a multimeter at the relay terminals. If the delta contact never closes after the set time, the internal timer IC has failed — typically caused by a voltage spike from an upstream contactor without surge suppression. Fit RC snubbers or varistors across all contactor coils before installing the replacement.
- Erratic timing (varies ±30% between cycles): Almost always a supply voltage issue. The CT-ARS universal input handles 24–240 V AC/DC, but severe voltage sags during motor starting can reset the internal timing circuit. Measure supply voltage at the relay terminals during a start attempt. If it dips below 20 V, add a dedicated 24 V DC supply for the control circuit.
- Relay chatters on transition: Worn delta contactor main contacts causing a voltage dip that momentarily drops the relay supply. Replace the delta contactor simultaneously — a CT-ARS failure is often a symptom, not the root cause.
Step-by-step replacement procedure (zero-downtime swap):
- Isolate and lock out the MCC section. Verify dead with a calibrated voltage tester at the contactor terminals.
- Photograph the existing relay wiring before disconnecting — terminal numbering on the CT-ARS is A1/A2 (coil supply), 15/16 (star NO), 25/26 (delta NO), 18/28 (common). Do not rely on memory.
- Note the timing potentiometer setting on the old relay (count dial graduation marks). Set the replacement to the same position before installation.
- The CT-ARS requires no DIP switch configuration or firmware — it is purely hardware-timed. No address setting, no parameter download required.
- After installation, perform a no-load test start: verify star contactor closes first, then delta contactor closes after the set delay, and star contactor drops out simultaneously. Any overlap indicates a wiring error at terminals 15/16 vs 25/26.
- Log the replacement in your CMMS with the new relay’s lot number for traceability.
Reliability in Harsh Conditions
The CT-ARS series was designed for the realities of industrial panel environments — not a climate-controlled lab. The universal input circuit tolerates supply voltage swings from 24 V DC to 240 V AC without component changes, which matters when your control transformer is undersized or the site voltage is unstable. The −25 °C lower operating limit means cold-start reliability in unheated substations and outdoor switchrooms in northern climates.
The 22.5 mm housing is built to IEC 60068-2-6 vibration test standards, making it suitable for panels mounted directly on compressor skids, pump bases, and mobile equipment where constant mechanical excitation would destroy lesser relays within months. The screw-clamp terminals accept up to 2.5 mm² conductors and maintain contact force under thermal cycling — a detail that matters in panels that see 40 °C daily temperature swings.
IP20 front protection with finger-safe terminal shrouds means the relay can be replaced safely in a live panel during a controlled maintenance window without requiring full panel de-energisation — a practical advantage when you’re working in a 24/7 production environment where a full shutdown is not an option.
Every unit we ship has been stored in a controlled-humidity warehouse. Electrolytic capacitors in timing circuits degrade in high-humidity storage — we do not stock product in uncontrolled environments, and we rotate inventory on a FIFO basis to ensure you receive a relay with full remaining service life.
Global Express Logistics
Our dispatch hub is in Xiamen, China — one of the country’s primary export ports with direct DHL and FedEx gateway access. Here’s what happens after you confirm your order:
- Same business day (order before 15:00 CST): Order verified, unit pulled from stock, inspected, and packed in anti-static inner bag → original ABB retail box → double-wall export carton with moisture barrier.
- Day 1: Shipment collected by DHL Express or FedEx International Priority. Tracking number sent to your email within 2 hours of pickup.
- Days 2–5: Delivery to most destinations in Southeast Asia (1–2 days), Middle East (2–3 days), Europe (3–4 days), North America (3–5 days). Exact transit time confirmed at order.
- Customs clearance: Full commercial invoice, packing list, HS code 8536.49 declaration, and country-of-origin documentation included in every shipment. We have zero customs holds on record for this product category.
- Bulk orders: For quantities above 10 units, we can consolidate with other parts on your BOM and ship as a single consignment to reduce your per-unit freight cost. Contact us to discuss.
If your plant is in a remote location or a country with complex import requirements, contact us before ordering — we have experience shipping to offshore platforms, mining sites, and restricted-import markets and can advise on the most efficient routing.
Contact Information
📧 Email: [email protected]
💬 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.