Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB SAFT113POW Power Supply Board

Request verified availability, condition, replacement risk review, packing options and courier lead time for SAFT113POW SAFT 113 POW.

Exact partSAFT113POW SAFT 113 POW RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberSAFT113POW SAFT 113 POW ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ SAFT113POW SAFT 113 POW

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
SAFT113POW SAFT 113 POW
Product Type
Power Supply Board
Product Family
Other series
Manufacturer
ABB
Country of Origin
SE
Model Function
Power Supply Board – supplies regulated DC rails to drive control electronics
Catalog Category
Industrial Automation Spares
Warranty
12 months
Model confirmed for inquiry SAFT113POW SAFT 113 POW Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB SAFT113POW Power Supply Board – Stop the Clock on Your Downtime

Every minute your line is down, you’re bleeding money. A failed power supply board in your ABB SAFT-series drive doesn’t just halt one machine — it can cascade into a full production stoppage. The SAFT113POW is the heart of the drive’s control electronics: when it fails, nothing moves. We stock it. We ship it today. That’s the only thing that matters right now.

We maintain physical inventory of the SAFT113POW at our Xiamen warehouse specifically because procurement lead times from OEM channels can stretch 8–16 weeks. Our clients — plant engineers, MRO buyers, and maintenance managers across Southeast Asia, the Middle East, and Europe — call us when the official channel has failed them. We deliver.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Value
Manufacturer ABB
Part Number SAFT113POW
Series SAFT (AC Drive Control Board Series)
Function Power Supply Board – supplies regulated DC rails to drive control electronics
Compatible Drives ABB ACS / SAMI series AC variable-speed drives using SAFT control architecture
Output Rails ±15 V, +5 V (verify against your drive’s service manual)
Mounting Direct board-to-board / backplane connector, no DIP switch configuration required
Firmware Dependency None – hardware power supply board, firmware-independent
Weight 1,060 g (approx.)
Condition New / Surplus New
Origin OEM ABB production (Germany)
Warranty 12 months
Availability ✔ Ready to Ship – Xiamen Stock

Troubleshooting & Replacement Tips

Field experience shows the SAFT113POW fails in predictable patterns. Here’s what to check before you pull the trigger on a replacement — and what to watch when you install the new board.

Common Failure Signatures:

  • Drive trips on “UNDERVOLTAGE” or “SUPPLY FAULT” — The +5 V or ±15 V rails have collapsed. Measure at the board’s output test points with a calibrated DMM. If rails are absent or fluctuating >5%, the SAFT113POW is the primary suspect.
  • Intermittent drive restarts with no fault code — Classic symptom of a failing electrolytic capacitor on the power supply board. The board powers up, capacitors charge, drive runs — then thermal stress causes a dropout. Replace the board; recapping in the field is not reliable.
  • Control board (SAFT110CON) shows no LED activity — Before condemning the control board, verify the SAFT113POW is delivering power. A dead power supply will make a healthy control board look faulty.
  • Burning smell or visible scorch marks on PCB — Do not attempt to power up. Replace immediately. Inspect the drive’s input rectifier and DC bus capacitors for secondary damage before reinstalling.

Replacement Procedure (Field Notes):

  1. Isolate and lock out the drive. Verify DC bus voltage has discharged below 50 V before touching any internal components — this can take 5–10 minutes after power-off.
  2. Photograph the existing board orientation and connector positions before removal. The SAFT113POW uses a keyed backplane connector, but document anyway.
  3. Remove the board by releasing the retention clips and pulling straight out. Do not rock or lever — the backplane connector pins are fragile.
  4. Inspect the backplane connector on the drive chassis for bent pins or corrosion. Clean with isopropyl alcohol if needed before installing the replacement.
  5. Seat the new SAFT113POW firmly until the retention clips engage. No DIP switch or address configuration is required — this board is not self-addressing.
  6. Power up the drive and verify the control board LEDs illuminate correctly before closing the cabinet. Check fault history for any residual codes and clear them.
  7. Run the drive at no-load for 5 minutes, then verify output voltage rails at the test points if accessible. Confirm stable operation before returning to production.

Firmware Note: The SAFT113POW is a pure hardware power supply board with no embedded firmware. No firmware matching or parameter backup is required for this replacement — unlike control or pulse adapter boards in the same series.

Reliability in Harsh Conditions

The SAFT113POW was engineered for the environments where drives actually live — not climate-controlled server rooms. ABB designed the SAFT series for continuous duty in heavy industrial settings: steel mills, paper machines, offshore platforms, and chemical processing plants.

The board’s power components are rated for operation across a wide ambient temperature range, with thermal management handled by the drive’s internal airflow system. The PCB uses conformal coating on production variants to resist condensation and airborne contaminants — a critical feature in coastal and high-humidity installations like those common in Southeast Asia and the Middle East.

Vibration resistance is inherent in the board’s mechanical design: the backplane connector provides a rigid, multi-point electrical and mechanical interface that outperforms flying-lead wiring in high-vibration applications such as compressor drives and marine propulsion systems.

Every unit we ship has been stored in controlled conditions — anti-static packaging, humidity-controlled warehouse, away from UV exposure. Surplus stock that has been improperly stored degrades. Ours hasn’t.

Global Express Logistics

Our Xiamen warehouse is positioned for fast export to every major industrial market. Here’s how a typical urgent order moves:

  • Order confirmed before 14:00 CST → Same-day dispatch in most cases.
  • DHL Express / FedEx International Priority → Transit times: Southeast Asia 1–2 days, Middle East 2–3 days, Europe 3–4 days, Americas 3–5 days.
  • Export documentation → Commercial invoice, packing list, certificate of origin, and our inspection certificate are prepared and attached to the shipment. HS code 8537.10 is pre-declared for smooth customs clearance.
  • Tracking → AWB number sent to you within 2 hours of dispatch. Real-time tracking link provided.
  • Bulk orders → For quantities requiring sea freight (LCL/FCL), we coordinate with freight forwarders and provide full export documentation. Contact us for a freight quotation.

We have shipped to over 40 countries. Customs delays are rare when documentation is complete — and ours always is.

Contact Information

When your line is down, don’t fill out a web form and wait. Call us directly.

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.