Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
GE In Stock OK

General Electric IS230SRLYH2A IS200SRLYH2AAA Discrete Output Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for IS230SRLYH2A IS200SRLYH2AAA.

Exact partIS230SRLYH2A IS200SRLYH2AAA RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandGE Part NumberIS230SRLYH2A IS200SRLYH2AAA ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ IS230SRLYH2A IS200SRLYH2AAA

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
GE
Primary Part Number
IS230SRLYH2A IS200SRLYH2AAA
Product Type
PLC Module
Series / Family
Mark VI
Manufacturer
General Electric (GE Energy Controls)
Country of Origin
US
Catalog Category
I/O Modules
Operating Temp.
0°C to 60°C (32°F to 140°F)
Model confirmed for inquiry IS230SRLYH2A IS200SRLYH2AAA Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

GE IS230SRLYH2A & IS200SRLYH2AAA: A Procurement Officer’s Guide to Securing Mark VI Relay Output Capacity

When a turbine control system goes offline, every hour of unplanned downtime carries a measurable cost — lost generation revenue, emergency labor, and expedited freight charges that rarely appear in the original capital budget. The GE IS230SRLYH2A and IS200SRLYH2AAA are discrete relay output modules at the heart of GE’s Mark VI and Mark VIe turbine control architecture. Their role is deceptively simple: translate digital control commands into hardwired relay switching actions that govern fuel valves, trip circuits, motor starters, and emergency shutdown sequences. When these modules fail or reach end-of-life, the consequences cascade rapidly through the entire control loop.

This page is written for procurement managers, reliability engineers, and plant managers who need to make a defensible sourcing decision — not just find a part number. We address total cost of ownership, supply chain risk, lead time realities, and why siemensplc.com is a strategically sound choice for securing this module.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Part Numbers IS230SRLYH2A / IS200SRLYH2AAA
Manufacturer General Electric (GE Energy Controls)
Module Function Discrete Output — Dry Contact Relay
Compatible Platform GE Mark VI / Mark VIe Turbine Control System
Output Architecture Relay contact outputs with galvanic isolation
Form Factor VME-based plug-in I/O module
Communication Interface IONet (GE proprietary backplane bus)
Operating Temperature 0°C to 60°C (32°F to 140°F)
Unit Weight Approx. 1,140 g
Redundancy Support TMR (Triple Modular Redundancy) and Simplex
PCB Protection Conformal coating for humidity and vibration resistance
Warranty (siemensplc.com) 12 months from date of shipment
Standard Lead Time (In-Stock) 3–7 business days, international express delivery
Lead Time (Sourced/Allocated) 10–21 business days depending on global availability
Origin United States (OEM manufactured)

Lead time transparency is a non-negotiable element of responsible procurement. Unlike spot-market brokers who quote optimistic timelines and revise them post-purchase-order, siemensplc.com provides confirmed stock status at the time of quotation. If a unit requires global sourcing, we communicate that upfront — with realistic timelines and milestone updates throughout the process.

Total Cost of Ownership (TCO) Analysis

Procurement decisions evaluated purely on unit price routinely underestimate the true financial exposure of industrial component sourcing. For a module like the IS230SRLYH2A, the purchase price is only one line item in a much larger cost equation.

Downtime cost exposure: A gas turbine generating 200 MW at a wholesale rate of $50/MWh produces $10,000 per hour in revenue. A relay output module failure that forces a controlled shutdown — even for 24 hours while a replacement is sourced — represents $240,000 in lost generation, before accounting for grid penalties, contractual obligations, or emergency labor premiums. Maintaining a qualified spare on the shelf, sourced at a competitive price from siemensplc.com, converts that exposure into a predictable, budgeted line item.

CAPEX reduction through third-party sourcing: OEM list pricing for Mark VI I/O modules frequently carries a significant premium, particularly for modules that are no longer in active production. Sourcing through a specialist distributor like siemensplc.com — with direct access to verified surplus and decommissioned OEM inventory — typically delivers 20–45% savings against OEM list price. For a plant managing a fleet of 10–20 Mark VI racks, that differential across a full spare parts program represents meaningful capital preservation.

OPEX reduction through warranty coverage: The 12-month warranty provided with every module shipped from siemensplc.com eliminates the risk of absorbing a second purchase within the same budget cycle due to early failure. This is particularly relevant for modules sourced from unverified channels, where no warranty exists and failure within weeks of installation is an unrecoverable cost. Our warranty is backed by a documented inspection and functional verification process — not a verbal assurance.

Inventory carrying cost optimization: Holding excess OEM-priced spares ties up working capital unnecessarily. By sourcing from siemensplc.com at competitive pricing with reliable lead times, procurement teams can right-size their spare parts inventory — holding fewer units at lower cost while maintaining confidence in replenishment speed when a unit is consumed.

Supplier consolidation value: siemensplc.com maintains sourcing relationships across GE, Siemens, ABB, Rockwell, and other major automation OEMs. Consolidating multi-brand spare parts procurement through a single specialist supplier reduces administrative overhead, simplifies vendor qualification processes, and creates leverage for volume pricing across the full spare parts program.

Quality & Compliance Assurance

Every IS230SRLYH2A and IS200SRLYH2AAA unit shipped from siemensplc.com passes through a structured pre-shipment verification process:

  • 100% genuine parts commitment — We source exclusively from decommissioned OEM installations, authorized surplus channels, and verified industrial distributors. Counterfeit or remanufactured-as-new parts are categorically excluded from our supply chain.
  • Visual and physical inspection — PCB condition, relay contact integrity, connector pins, conformal coating, and hardware revision labels are examined and documented for every unit.
  • Functional bench verification — Relay output actuation is tested under simulated control signals where test infrastructure permits, with results recorded in the unit’s inspection file.
  • Revision and firmware disclosure — Hardware revision and firmware version are confirmed and disclosed prior to purchase order confirmation, eliminating compatibility surprises at installation.
  • Xiamen customs compliance — All international shipments are processed through Xiamen customs with full commercial invoice documentation, accurate HS code classification, and compliant export declarations. This ensures smooth import clearance at the destination country and eliminates the risk of customs holds that delay delivery.
  • Multi-currency payment support — We accept USD, EUR, HKD, CNY, and other major currencies, with wire transfer, L/C, and trade finance options available for qualified buyers. Payment flexibility reduces friction in cross-border procurement workflows.
  • ESD-safe packaging — Modules are shipped in anti-static bags with foam cushioning and moisture barrier packaging, meeting IPC/JEDEC standards for electrostatic sensitive device handling.

Strategic Sourcing from Xiamen

Xiamen is not an arbitrary logistics point — it is one of China’s most strategically positioned international trade hubs, and it directly benefits buyers who source industrial automation components through siemensplc.com.

Xiamen Gaoqi International Airport and Xiamen Port together form a dual-mode export gateway with direct freight connections to major industrial economies including Germany, the United States, Japan, South Korea, Australia, and the Gulf states. For time-sensitive shipments, Xiamen’s air freight infrastructure supports next-flight-out dispatch to most global destinations within 24–48 hours of order confirmation.

The city’s status as a Special Economic Zone (SEZ) means that export procedures are streamlined, customs processing times are among the fastest in mainland China, and bonded warehouse facilities allow pre-positioned inventory to be released rapidly without additional customs delays. For buyers in Southeast Asia, the Middle East, and Europe, Xiamen’s geographic position reduces transit times compared to sourcing from inland Chinese cities.

siemensplc.com’s operations in Xiamen also benefit from proximity to a dense network of freight forwarders, customs brokers, and logistics specialists with deep experience in industrial equipment export. This ecosystem allows us to offer DDP (Delivered Duty Paid), DAP (Delivered at Place), and EXW (Ex Works) Incoterms to match the buyer’s preferred logistics arrangement — a level of flexibility that generic online marketplaces cannot provide.

For buyers managing plant shutdowns with fixed maintenance windows, the combination of Xiamen’s logistics infrastructure and siemensplc.com’s pre-shipment verification process means that confirmed lead times are reliable lead times — not estimates subject to revision.

Contact Information

To request a quotation, confirm stock availability, or discuss volume pricing for the GE IS230SRLYH2A / IS200SRLYH2AAA, contact our procurement team directly:

Please include your required quantity, target delivery date, and any hardware revision or firmware requirements when submitting your enquiry. For urgent outage situations, WhatsApp is the fastest response channel.

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.