Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Honeywell In Stock OK

HONEYWELL CC-TCNT01 51308307-175 DCS I/O Termination Assembly

Request verified availability, condition, replacement risk review, packing options and courier lead time for CC-TCNT01.

Exact partCC-TCNT01 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandHoneywell Part NumberCC-TCNT01 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ CC-TCNT01

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Honeywell
Primary Part Number
CC-TCNT01
Product Type
DCS I/O Termination Assembly
Series / Family
cc-
Country of Origin
US
Catalog Category
I/O Modules
Operating Temp.
0°C to +60°C
Compliance
CE, UL, IEC 61131-2, RoHS 2
Model confirmed for inquiry CC-TCNT01 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

HONEYWELL CC-TCNT01 51308307-175 — Stop the Clock on Your Downtime

Every minute your C300 controller is offline, the losses compound. A failed I/O Termination Assembly shouldn’t be the reason your plant sits idle for days waiting on slow supply chains. The CC-TCNT01 (Honeywell P/N 51308307-175) is a field-wiring backbone of the Experion PKS C300 platform — and when it fails, you need a verified replacement in hand, not a purchase order stuck in procurement limbo.

We stock the CC-TCNT01 in Xiamen and ship globally via DHL Express and FedEx International Priority. Most orders clear customs and land on your bench within 3–5 business days. No broker delays. No grey-market risk. You get the part, the documentation, and the confidence to reinstall without second-guessing the source.

⚡ URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Part Number CC-TCNT01
Honeywell Reference 51308307-175
Series Experion PKS C300 Controller Platform
Module Type I/O Termination Assembly (Non-Isolated)
Termination Style Screw-terminal field wiring interface
Compatible Controller C300 Process Controller (CC-PCF901 / CC-PCF902)
Operating Temperature 0°C to +60°C
Storage Temperature -40°C to +85°C
Relative Humidity 5% to 95% non-condensing
Power Passive — bus-powered via C300 backplane
Compliance CE, UL, IEC 61131-2, RoHS 2
Weight Approx. 220 g
Stock Status ✅ Ready to Ship — Xiamen Warehouse
Lead Time Ships within 1–2 business days of order confirmation
Documentation COC, Packing List, COO Declaration — standard with every shipment

Troubleshooting & Replacement Tips

The CC-TCNT01 fails in predictable ways once you’ve seen enough of them in the field. Here’s what to check before you pull the trigger on a replacement — and what to watch when you install the new one.

Common Fault Signatures:

  • Intermittent I/O dropouts on specific channels: Usually traced to oxidized or loose screw terminals, not the module itself. Before condemning the CC-TCNT01, torque-check every terminal to spec (typically 0.5–0.6 Nm). If dropouts persist after re-termination, the PCB trace or connector seat is suspect.
  • Experion PKS DIAG alarm — “I/O Link Communication Fault”: Can indicate a failed backplane connector on the termination assembly. Reseat the module first. If the fault clears and returns within hours, the connector is worn and the assembly needs replacement.
  • Systematic channel failures (all channels on one I/O module reading bad): The CC-TCNT01 is the common point for all field wiring on that I/O slot. A shorted field wire that wasn’t caught by the fuse can damage the termination PCB. Check for burn marks or discoloration on the board before installing the replacement.
  • Experion FDM showing “Module Not Responding” after a power cycle: Verify the C300 backplane power rail is stable. A marginal power supply can cause the termination assembly to appear failed when the root cause is upstream.

Replacement Procedure — Key Steps:

  • 1. Document field wiring before disconnection. Photograph or sketch every terminal connection. The CC-TCNT01 uses a numbered screw-terminal block — label each wire with the terminal number before removal. Rewiring errors are the #1 cause of post-replacement faults.
  • 2. De-energize field circuits. The termination assembly is not hot-swap capable at the field-wiring level. Isolate all field instruments connected to this assembly before removal. Confirm with your safety system that no SIL-rated loops are affected.
  • 3. No firmware or address configuration required. The CC-TCNT01 is a passive termination assembly — it carries no firmware, no DIP switches, and no node addressing. It is a direct mechanical and electrical replacement. The C300 controller will recognize the I/O modules automatically once the assembly is seated and field wiring is restored.
  • 4. Inspect the backplane connector on the new unit before installation. Check for bent pins or debris in the connector housing. A damaged connector on a new unit is rare but not unheard of — especially with units that have been improperly stored.
  • 5. Re-termination torque matters. Over-tightening screw terminals on the new assembly is a common mistake under pressure. Use a calibrated torque screwdriver. Stripped terminals on a brand-new assembly are an avoidable failure.
  • 6. Verify I/O channel status in Experion after restoration. Navigate to the C300 controller’s I/O status display in Experion Station. All channels should return to their pre-fault state within one scan cycle. If any channel remains in fault, check the field wiring for that specific terminal — do not assume the replacement assembly is defective until field wiring is confirmed correct.

Reliability in Harsh Conditions

The Experion PKS C300 platform was designed for continuous operation in environments that would destroy consumer-grade electronics. The CC-TCNT01 termination assembly reflects that design philosophy — but understanding its limits helps you protect it in the field.

Vibration: The screw-terminal block is the most vibration-sensitive element of this assembly. In high-vibration environments — compressor houses, turbine decks, heavy press lines — terminals can back off over time even when initially torqued correctly. Quarterly terminal inspection is standard practice in these environments. Locking terminal inserts are available from Honeywell for installations where vibration is chronic.

Thermal cycling: The CC-TCNT01 is rated to 60°C continuous. In outdoor enclosures or poorly ventilated panels in tropical climates, ambient temperatures can exceed this during peak summer conditions. Thermal cycling — repeated heating and cooling — accelerates PCB trace fatigue and connector wear. If your installation runs hot, verify enclosure ventilation before attributing failures to the module itself.

Humidity and condensation: The 95% non-condensing humidity rating is a steady-state specification. Rapid temperature swings — such as opening a panel in a cold morning and exposing it to humid air — can cause brief condensation events that exceed this rating. Conformal coating on the PCB provides some protection, but it is not a substitute for proper enclosure sealing and desiccant management in high-humidity environments.

EMI and ground loops: The non-isolated termination design of the CC-TCNT01 means that ground loops in field wiring will appear as noise on analog channels. If you’re seeing unexplained analog drift after replacing this assembly, check field cable shielding continuity and grounding at the termination point — not the module.

Global Express Logistics

We operate from Xiamen, China — one of the most logistics-efficient export hubs in Asia. Our warehouse is 15 minutes from Xiamen Gaoqi International Airport, which means same-day handoff to DHL and FedEx for orders confirmed before 14:00 CST.

  • DHL Express Worldwide: Typical transit 2–4 business days to Europe, Middle East, and Southeast Asia. 3–5 days to the Americas. Real-time tracking from pickup to delivery.
  • FedEx International Priority: Available for destinations where FedEx has stronger coverage than DHL — particularly useful for remote industrial sites in North America and Australia.
  • Export Documentation: Commercial Invoice, Packing List, Certificate of Origin, and Certificate of Conformance are prepared and attached to every shipment as standard. HS Code 8537.10 is pre-declared for smooth customs clearance.
  • Packaging: Anti-static ESD bag, foam-lined inner carton, moisture-barrier outer packaging. Conforms to ISTA 2A transit testing standards. The assembly arrives in the same condition it left our warehouse.
  • Urgent shipments: For genuine plant-down emergencies, contact us directly via WhatsApp. We can arrange airport-to-airport freight with courier pickup at the destination for same-day delivery in major industrial cities.

We’ve shipped to refineries in Saudi Arabia, power plants in Vietnam, chemical facilities in Germany, and paper mills in Brazil. The logistics process is the same every time — fast, documented, and traceable.

Contact Information

📧 Email: [email protected]
📱 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.