Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Mitsubishi Electric In Stock OK

Mitsubishi GU-D08 80173-109-01 Thyristor Gate Drive Board

Request verified availability, condition, replacement risk review, packing options and courier lead time for GU-D08.

Exact partGU-D08 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandMitsubishi Electric Part NumberGU-D08 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ GU-D08

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Mitsubishi Electric
Primary Part Number
GU-D08
Product Type
Thyristor Gate Drive Board
Product Family
Other series
Manufacturer
Mitsubishi Electric Corporation
Country of Origin
JP
Catalog Category
Motor Drives
Warranty
12 months from date of shipment, all conditions
Model confirmed for inquiry GU-D08 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

Mitsubishi GU-D08 / 80173-109-01 Thyristor Gate Drive Board: A Procurement Officer’s Acquisition Framework

When a thyristor gate drive board fails inside a running drive system, the clock starts immediately. Every hour of unplanned downtime in a steel mill, paper plant, or crane control room carries a cost that dwarfs the price of the component itself. The Mitsubishi GU-D08, cross-referenced under BOM number 80173-109-01, is the OEM-specified SCR trigger and gate drive board for Mitsubishi Electric’s GU-series drive control assemblies. It governs firing angle precision, gate current delivery, and electrical isolation — three parameters that cannot be approximated by an unverified substitute without risking cascading drive failure.

At siemensplc.com, we approach this part not as a commodity listing but as a supply chain obligation. Our sourcing desk maintains active relationships with authorized Mitsubishi Electric distributors and certified secondary-market channels across Asia, Europe, and North America. Whether your maintenance team needs a same-week emergency replacement or your procurement department is building a strategic buffer stock ahead of a scheduled shutdown, we structure our fulfillment around your operational timeline — not ours.

This is a moderately scarce legacy board. Mitsubishi Electric’s GU-series drive platforms have been in service for decades, and while the boards remain available through specialist channels, lead times from OEM distribution can stretch to four weeks or longer during peak demand periods. Our global sourcing capability — anchored in Xiamen with reach into Japanese, European, and North American surplus markets — allows us to compress that window significantly for qualified buyers. Request a quote and receive a confirmed availability status within one business day.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Manufacturer Mitsubishi Electric Corporation
Part Number GU-D08
BOM / Reference No. 80173-109-01
Module Classification Thyristor SCR Trigger / Gate Drive Board
Product Series GU Series — Drive Control Boards
Primary Application AC/DC Industrial Drive Systems, Power Rectifier Assemblies
Country of Origin Japan
Unit Weight Approx. 1,150 g (packaged)
Condition Options New (OEM), Refurbished (tested), Tested Used
Lead Time — In Stock 3–7 business days (air freight, door-to-door)
Lead Time — Sourced New 14–28 business days depending on origin channel
Warranty 12 months from date of shipment, all conditions
Shipping Terms DDP / DAP / EXW — negotiable per order volume
Payment Currencies USD, EUR, CNY, HKD, and major trade currencies accepted

Total Cost of Ownership (TCO) Analysis

Procurement teams evaluating the GU-D08 / 80173-109-01 often focus on unit price. That is the wrong variable to optimize. The correct frame is total cost of ownership across the asset’s remaining service life — and within that frame, the sourcing decision carries far more financial weight than the line-item cost of the board itself.

Downtime risk quantification. A drive system failure in a continuous-process environment — rolling mills, chemical dosing lines, crane systems — can generate production losses measured in thousands of dollars per hour. If a procurement shortcut results in even a single additional day of unplanned downtime, the cost differential versus a properly sourced OEM board is eliminated entirely. Our 12-month warranty is a contractual backstop that shifts financial risk away from your maintenance budget and onto our sourcing guarantee.

CAPEX reduction through strategic stocking. Holding a single verified spare GU-D08 in your maintenance crib eliminates the emergency sourcing premium — typically 30–60% above standard pricing — that applies when a board is needed within 48 hours. For facilities running multiple Mitsubishi GU-series drive frames, a two-unit buffer stock represents a modest capital outlay against a potentially significant CAPEX event if a drive system requires full replacement due to delayed board availability.

OPEX reduction through verified quality. Refurbished boards sourced from unverified channels introduce latent failure risk that does not appear on a balance sheet until it materializes as a warranty claim, an insurance event, or a safety incident. Every unit we ship — new, refurbished, or tested used — passes functional verification before dispatch. Test records and traceability certificates are available on request, supporting your internal audit and asset management requirements.

Engineering labor cost. A plug-and-play OEM replacement requires no parameter reconfiguration, no firmware adjustment, and no commissioning time beyond physical installation. Third-party equivalents, even when electrically compatible, frequently require engineering validation time that your maintenance team bills at internal labor rates. That hidden cost rarely appears in a purchase order comparison but is real and recurring.

Quality & Compliance Assurance

siemensplc.com operates under a 100% genuine parts commitment. We do not list, stock, or ship counterfeit or misrepresented components. Every GU-D08 / 80173-109-01 unit we supply is traceable to its source channel, and documentation — including supplier certificates, test reports, and date codes — is available to qualified buyers upon request.

Our export operations are conducted in full compliance with Chinese customs regulations administered through Xiamen Customs. All shipments are accompanied by accurate commercial invoices, packing lists, and HS-coded export declarations. We support DDP (Delivered Duty Paid) terms for buyers who require a landed-cost structure with no import clearance burden on the receiving side.

Payment flexibility is a deliberate policy. We accept USD, EUR, CNY, HKD, and other major trade currencies via bank transfer (T/T), and we support letter of credit (L/C) arrangements for large-volume orders.

Strategic Sourcing from Xiamen

Xiamen is one of China’s five original Special Economic Zones, home to a mature export infrastructure that includes Xiamen Gaoqi International Airport — with direct cargo routes to Japan, South Korea, Germany, the United States, and Southeast Asia — and the Port of Xiamen, one of the top-20 container ports globally by throughput. For industrial components requiring careful handling and documentation, Xiamen’s customs clearance environment is experienced, efficient, and well-suited to time-sensitive B2B shipments.

Our warehouse and sourcing operations in Xiamen provide same-day access to the Pearl River Delta and Yangtze River Delta supplier networks — the two densest concentrations of industrial electronics inventory in the world. When a part is not immediately available through primary channels, our sourcing desk activates a parallel search across verified secondary-market partners in Japan, Germany, and the United States. Air freight from Xiamen to major industrial hubs — Frankfurt, Chicago, Tokyo, Singapore, Dubai — typically clears customs and arrives within 5–10 business days under standard DDP terms. For urgent requirements, expedited air freight delivers to most destinations in 3–5 business days.

Contact Information

Our industrial sourcing team is available Monday through Saturday, 09:00–18:00 CST. Quote requests receive a confirmed response within one business day.

© 2026 siemensplc.com. All rights reserved. Mitsubishi Electric and GU-D08 are trademarks of Mitsubishi Electric Corporation. siemensplc.com is an independent distributor and is not affiliated with or endorsed by Mitsubishi Electric Corporation.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.