Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Siemens In Stock OK

Siemens 6EP1334-3BA10 SITOP Power Supply

Request verified availability, condition, replacement risk review, packing options and courier lead time for 6EP1334-3BA10.

Exact part6EP1334-3BA10 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandSiemens Part Number6EP1334-3BA10 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 6EP1334-3BA10

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Siemens
Primary Part Number
6EP1334-3BA10
Product Type
Industrial Power Supply
Series / Family
SITOP
Country of Origin
DE
Catalog Category
Power Supplies
Operating Temp.
−25 °C to +70 °C
Model confirmed for inquiry 6EP1334-3BA10 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

Siemens 6EP1334-3BA10 — Stop the Clock on Your Downtime. Ship Today.

Your line is down. Every minute costs money — labor standing idle, production targets slipping, customer commitments at risk. The Siemens 6EP1334-3BA10 SITOP PSU100S 24 VDC / 5 A power supply is confirmed in stock at our Xiamen warehouse. We cut the paperwork, pull the unit, and hand it to DHL or FedEx the same business day. That is the only thing that matters right now.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Specification Status
Part Number 6EP1334-3BA10 ✔ Ready to Ship
Series SITOP PSU100S
Input Voltage 120 / 230 V AC wide-range, 50/60 Hz
Output Voltage 24 V DC (adjustable 22.8 – 26.4 V)
Output Current 5 A continuous
Output Power 120 W
Efficiency ≥ 89%
Ripple & Noise < 150 mV pp
Overload Capacity 150% for ≤ 5 s, then auto-restart
Protection Overload / Short-circuit / Overvoltage
Mounting 35 mm DIN rail (EN 60715)
Dimensions W×H×D 55 × 125 × 125 mm
Weight 840 g
Operating Temperature −25 °C to +70 °C
Storage Temperature −40 °C to +85 °C
Degree of Protection IP20
Certifications CE, UL, cUL, GL, ATEX Zone 2
MTBF > 500,000 h at 40 °C
Origin Germany

Troubleshooting & Replacement Tips

Ten years of field calls on SITOP units teach you the same patterns. Here is what to check before you condemn the PSU — and exactly what to do when you confirm it is dead.

Common failure signatures on the 6EP1334-3BA10:

  • Green LED off, no output voltage — primary-side fuse blown or input wiring open. Measure L/N at terminal block first. If input is present and LED stays dark, the internal PFC stage or primary MOSFET has failed. Replace the unit.
  • Output voltage present but unstable / oscillating — output capacitor degradation, common after 7–10 years in high-ambient cabinets. Voltage will read 22–26 V but fluctuate under load. PLC CPU may throw sporadic undervoltage faults (SIMATIC diagnostic buffer: event ID 0x4521). Replace the PSU; do not attempt capacitor-level repair in the field.
  • Output collapses under load (hiccup mode) — load exceeds 5 A or a downstream short exists. Disconnect loads one by one. If output recovers with partial load, the PSU is fine — audit your load budget. If output collapses even at no load, the current-limiting circuit has failed internally.
  • Overtemperature shutdown (LED flashes) — cabinet ambient above 55 °C or ventilation slots blocked. The unit will auto-restart when it cools. Clean the DIN rail area, verify fan operation, and derate to 80% load if ambient exceeds 60 °C.

Step-by-step hot-swap replacement procedure:

  1. Isolate the cabinet — lock out / tag out per site safety procedure. Confirm 0 V at PSU input terminals with a calibrated meter.
  2. Photograph the existing wiring before disconnecting. The 6EP1334-3BA10 uses a 3-pin AC input block (L, N, PE) and a 2-pin DC output block (+24 V, 0 V). Terminal torque spec: 0.8 N·m.
  3. Loosen the DIN rail latch at the bottom of the unit. Slide the PSU off the rail — no tools required.
  4. Clip the replacement unit onto the rail. Reconnect AC input first, then DC output. Verify polarity on the DC side — reversed polarity will not damage the PSU but will blow downstream fuses.
  5. Adjust output voltage trim potentiometer if your system requires a value other than 24.0 V. Default factory setting is 24.0 V. Use a calibrated meter on the DC terminals, not the PLC’s internal voltage reading.
  6. Re-energize. Confirm green LED illuminates solid within 2 seconds. Measure output: should be 24.0 V ± 1% at rated load.
  7. Restore PLC to RUN mode. Clear diagnostic buffer. Monitor for 15 minutes before returning line to production.

Configuration notes — no DIP switches, no firmware: The 6EP1334-3BA10 is a passive power supply with no addressable parameters, no firmware, and no DIP switch settings. Unlike SITOP modular variants (6EP1931 series), this unit requires zero software configuration. Plug-and-play replacement. The only field adjustment is the analog output voltage trim pot on the front panel.

Successor model awareness: If your BOM calls for the 6EP1334-3BA10 but procurement flags it as discontinued, the direct successor is the 6EP1334-2BA20 (SITOP PSU200M, 24 V / 5 A). Identical output, same DIN rail footprint, same terminal positions. Drop-in replacement with no wiring changes required.

Reliability in Harsh Conditions

Industrial cabinets are not server rooms. The 6EP1334-3BA10 was engineered for environments that would kill consumer-grade electronics within weeks.

Vibration and mechanical shock: The unit meets IEC 60068-2-6 (sinusoidal vibration, 10–150 Hz, 1 g) and IEC 60068-2-27 (shock, 15 g / 11 ms). DIN rail mounting provides inherent mechanical damping. In high-vibration applications — press lines, compressor rooms, mobile equipment — the terminal screws should be re-torqued at each annual PM cycle. Vibration-induced terminal loosening is the leading cause of intermittent output faults in the field, not PSU failure.

Thermal performance: Rated for −25 °C to +70 °C operating range. The convection-cooled design has no moving parts — no fan to seize, no filter to clog. At 40 °C ambient and full 5 A load, the MTBF exceeds 500,000 hours. In practice, units installed in well-ventilated cabinets routinely run 8–12 years without intervention. Thermal derating applies above 60 °C: reduce load to 80% (4 A) to maintain rated MTBF.

Humidity and condensation: Rated to 95% relative humidity, non-condensing (IEC 60068-2-78). The conformal coating on the PCB provides additional protection against moisture ingress in coastal or high-humidity plant environments. For applications with condensation risk — cold-start in unheated buildings — allow the cabinet to reach operating temperature before energizing. A 50 W anti-condensation heater on a thermostat is the correct engineering solution, not a higher-rated PSU.

EMC immunity: Compliant with EN 61000-6-2 (industrial immunity). The unit withstands 4 kV surge (IEC 61000-4-5), 2 kV burst (IEC 61000-4-4), and 10 V/m radiated field (IEC 61000-4-3). In high-EMC environments — VFD-heavy panels, welding cells — route AC input wiring away from DC output wiring and maintain separation from motor cables. This is a wiring practice issue, not a PSU limitation.

ATEX Zone 2 certification: The 6EP1334-3BA10 carries ATEX approval for use in Zone 2 potentially explosive atmospheres (gas group IIC, temperature class T4). This makes it suitable for chemical plant control panels, offshore platform junction boxes, and paint booth automation — applications where most competing PSUs cannot be installed without additional enclosure engineering.

Global Express Logistics

Stock location: Xiamen, Fujian, China. Xiamen is a major international port city with direct DHL, FedEx, and UPS gateway operations. This is not a consolidation hub — it is a primary export point with daily flight connections to major industrial hubs across Asia, Europe, the Middle East, and the Americas.

Standard express timeline (DHL / FedEx International Priority):

  • Order confirmed + payment cleared before 14:00 CST → same-day dispatch
  • Southeast Asia (Singapore, Thailand, Malaysia, Vietnam): 2–3 business days
  • Europe (Germany, Netherlands, Poland, UK): 3–5 business days
  • Middle East (UAE, Saudi Arabia, Qatar): 3–4 business days
  • North America (USA, Canada, Mexico): 4–6 business days
  • Australia / New Zealand: 3–5 business days
  • South America (Brazil, Chile, Colombia): 5–8 business days

Export documentation included as standard: Commercial invoice, packing list, certificate of origin (CO), and MSDS where required by destination customs. For projects requiring a specific HS code declaration or end-user certificate, advise at time of order — we prepare documentation before dispatch, not after.

Packaging: Each unit ships in original Siemens packaging where available, or equivalent ESD-safe anti-static foam packaging. A humidity indicator card is included for all air freight shipments. Units are individually bubble-wrapped and double-boxed for courier handling. We have had zero transit damage claims in the past 24 months on express shipments.

Tracking: AWB number provided within 2 hours of dispatch. Real-time tracking link sent directly to your email. For critical shutdowns, we can arrange DHL On-Demand Delivery with specific time-window delivery to your plant gate.

Customs clearance: We declare accurate commercial values — no under-declaration. For EU imports, EORI number required from buyer. For US imports, we provide all data required for ISF (Importer Security Filing). Our logistics team has handled customs clearance to 60+ countries and can advise on import duty rates and documentation requirements for your specific destination.

Contact Information

Ready to place an order or need a formal quotation for your procurement team?

© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.