Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Siemens In Stock OK

Siemens 6ES7193-6AR00-0AA0 Bus Adaptor

Request verified availability, condition, replacement risk review, packing options and courier lead time for 6ES7193-6AR00-0AA0.

Exact part6ES7193-6AR00-0AA0 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandSiemens Part Number6ES7193-6AR00-0AA0 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 6ES7193-6AR00-0AA0

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Siemens
Primary Part Number
6ES7193-6AR00-0AA0
Product Type
Bus Adaptor
Series / Family
SIMATIC
Country of Origin
DE
Catalog Category
Communication
Operating Temp.
-40 °C to +70 °C
Compliance
CE, UL, cULus
Model confirmed for inquiry 6ES7193-6AR00-0AA0 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

6ES7193-6AR00-0AA0 BA 2XRJ45 — Stop the Bleed: Get Your ET 200SP Node Back Online Before the Next Shift

Your ET 200SP station just dropped off the PROFINET scan. The CPU is throwing BF and SF LEDs simultaneously. Maintenance is standing by. Every minute offline is money — and the root cause is almost always the bus adaptor. The Siemens 6ES7193-6AR00-0AA0 (BA 2XRJ45) is the dual-port PROFINET interface that bridges your BaseUnit to the network. When it fails, the entire I/O node goes dark. We stock it in Xiamen. We ship it today.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Parameter Value
Part Number 6ES7193-6AR00-0AA0
Description Bus Adaptor BA 2XRJ45
Product Series SIMATIC ET 200SP
Interface 2 × RJ45 (PROFINET)
Topology Support Ring (MRP), Daisy-chain, Star
Mounting Snap-on to ET 200SP BaseUnit
Operating Temperature -40 °C to +70 °C
Protection Class IP20
Weight approx. 50 g
Compliance CE, UL, cULus
Origin Germany
Stock Status ✅ Ready to Ship — Xiamen Warehouse

Troubleshooting & Replacement Tips

Fault Signature — How to Confirm the BA is the Culprit:

  • CPU diagnostic buffer shows “Station failure” or “PROFINET IO device not reachable” for the affected ET 200SP station.
  • The BF LED on the IM 155-6 PN interface module is solid red — not flashing. Flashing BF usually means configuration mismatch; solid BF with no link light on the RJ45 port points directly to the BA or cable.
  • Swap the patch cable first (30 seconds). If the link LED on the BA still does not illuminate, the BA is dead. Do not waste time on TIA Portal diagnostics — the hardware is gone.
  • Check the BaseUnit locking tab before pulling the BA. The snap-lock must be released cleanly or you risk cracking the BaseUnit housing — a far more expensive problem.

Replacement Procedure (Field-Tested, 5 Minutes):

  • Step 1 — Power state: The 6ES7193-6AR00-0AA0 supports hot-swap on compatible BaseUnits (BU type A/B with the BA slot). Confirm your BaseUnit revision supports this before proceeding. If unsure, take the station offline.
  • Step 2 — Cable labeling: Label both RJ45 cables before disconnecting. Port 1 (P1) and Port 2 (P2) orientation matters for ring topology — reversing them breaks MRP.
  • Step 3 — BA removal: Press the orange release lever on the BaseUnit, slide the BA upward and out. No tools required.
  • Step 4 — New BA installation: Slide the 6ES7193-6AR00-0AA0 into the BaseUnit slot until it clicks. Reconnect cables in the correct port order.
  • Step 5 — No re-addressing required: The BA 2XRJ45 carries no device address itself. The PROFINET device name and IP address are stored in the IM 155-6 PN module — they survive the BA swap. You do not need to re-download the hardware configuration from TIA Portal.
  • Step 6 — Verify: Link LEDs on both RJ45 ports should illuminate green within 5 seconds. The BF LED on the IM should extinguish. Check the CPU diagnostic buffer for station recovery confirmation.

Common Configuration Pitfalls After Replacement:

  • MRP ring not closing: If you are running Media Redundancy Protocol, both ring ports must be connected before the MRP manager (typically a SCALANCE switch or the CPU itself) will close the ring. A single disconnected port keeps the ring open and generates continuous diagnostics.
  • Firmware mismatch: The BA 2XRJ45 has no user-configurable firmware. However, if your IM 155-6 PN module is running a very old firmware version (< V3.0), verify compatibility with the current BA hardware revision in the Siemens compatibility tool (support.industry.siemens.com).
  • DIP switch settings: The 6ES7193-6AR00-0AA0 has no DIP switches. Address assignment is handled entirely by the IM module. If a technician has been adjusting DIP switches on this component, they are working on the wrong part.

Reliability in Harsh Conditions

The 6ES7193-6AR00-0AA0 is not office hardware. It is built to survive the environments where automation actually runs — and where failures are never convenient.

Vibration: Qualified to IEC 60068-2-6 sinusoidal vibration testing. The snap-on mounting mechanism provides mechanical retention that does not rely on screws that can back out under continuous vibration. Automotive body shops, stamping presses, and compressor rooms have been running this BA for years without mechanical failure.

Temperature Extremes: Rated from -40 °C storage to +70 °C operating. In practice, this means it handles both unheated outdoor enclosures in northern climates and poorly ventilated control cabinets in foundries and glass plants. The RJ45 connectors maintain contact integrity across the full thermal cycle range.

Humidity and Condensation: Tested to IEC 60068-2-78 damp heat conditions. The conformal coating on internal PCB components resists moisture ingress in high-humidity environments such as food processing washdown areas and coastal installations. IP20 rating applies to the module itself — ensure the enclosure provides the appropriate external protection for your installation.

EMC Immunity: Compliant with EN 61000-6-2 industrial immunity standards. The shielded RJ45 ports and internal filtering suppress conducted and radiated interference from variable frequency drives, welding equipment, and high-current switching loads that share cabinet space in real industrial installations.

Shock Resistance: Qualified to IEC 60068-2-27 mechanical shock. The BA survives the handling abuse of field replacement — being dropped, knocked, or installed under pressure by a technician who has been awake for 14 hours.

Global Express Logistics

We operate from Xiamen, China — one of the most logistics-efficient export hubs in Asia, with direct access to DHL, FedEx, and UPS international gateways. When you confirm an order before 15:00 CST, the part ships the same business day.

Typical Transit Times from Xiamen:

  • Southeast Asia (SG, MY, TH, VN, ID): DHL Express — 1 to 2 business days
  • East Asia (JP, KR, TW, HK): FedEx International Priority — 1 to 2 business days
  • Middle East (AE, SA, QA, KW): DHL Express — 2 to 3 business days
  • Europe (DE, NL, PL, FR, IT, ES): DHL Express — 3 to 5 business days
  • North America (US, CA, MX): FedEx International Priority — 3 to 5 business days
  • South Asia (IN, PK, BD): DHL Express — 2 to 4 business days
  • Australia & New Zealand: DHL Express — 2 to 4 business days

Every shipment includes a commercial invoice, packing list, and country-of-origin documentation. For customers in countries with import duty exemptions or preferential tariff agreements with China, we prepare the documentation set required to support your customs clearance. We have shipped to over 60 countries — customs delays caused by incomplete paperwork are not something we allow to happen.

For critical downtime situations, contact us directly on WhatsApp before placing the order. We will confirm stock, cut-off time, and the fastest available routing for your destination — before you commit. No surprises at the freight stage when your line is already down.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.