Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
Request Quote
Yokogawa In Stock OK

YOKOGAWA F3LE01-5T PLC Ethernet Module

Request verified availability, condition, replacement risk review, packing options and courier lead time for F3LE01-5T.

Exact partF3LE01-5T RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandYokogawa Part NumberF3LE01-5T ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ F3LE01-5T

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
Yokogawa
Primary Part Number
F3LE01-5T
Product Type
PLC Communication Module
Series / Family
FA-M3
Manufacturer
YOKOGAWA Electric Corporation
Country of Origin
JP
Catalog Category
Communication
Operating Temp.
0 °C to +55 °C
Warranty
12 months from date of shipment
Compliance
CE (EMC 2014/30/EU), UL 508, RoHS, IEC 61131-2
Model confirmed for inquiry F3LE01-5T Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

YOKOGAWA F3LE01-5T FA-M3 Ethernet Interface Module: A Procurement Manager’s Acquisition Strategy

When a production line depends on uninterrupted PLC-to-SCADA communication, the sourcing decision for a network interface module carries consequences that extend well beyond the purchase order. The YOKOGAWA F3LE01-5T is a 100BASE-TX Ethernet Interface Module designed exclusively for the FA-M3 modular PLC platform — a system that has been deployed in process manufacturing, utilities, and discrete automation for over two decades. Its continued presence in active plant inventories worldwide means procurement teams face a recurring challenge: securing genuine units at defensible prices without compromising delivery timelines or compliance obligations.

siemensplc.com operates as a specialist third-party supplier of industrial automation components, with a dedicated inventory pipeline for YOKOGAWA FA-M3 series hardware. Our sourcing model is built around the realities of industrial MRO procurement — where a single missing module can halt a production line, and where the cost of a wrong purchasing decision is measured not in the price of the part, but in the hours of downtime it causes.

The F3LE01-5T occupies a specific and non-substitutable role in the FA-M3 ecosystem. It provides the primary Ethernet backbone for FA-M3 CPU modules, supporting FINS, Modbus TCP, FTP, and HTTP simultaneously from a single backplane slot. For plants running legacy FA-M3 infrastructure, this module is not a commodity — it is a critical path component. Our global sourcing network maintains access to both current-production and end-of-life inventory channels, ensuring availability even when official distribution lead times extend beyond acceptable project windows.

Request an Official Quote: [email protected] | WhatsApp: +86 18359268345

Procurement Specifications

Parameter Detail
Manufacturer YOKOGAWA Electric Corporation
Part Number F3LE01-5T
Platform Series FA-M3 (YOKOGAWA Modular PLC)
Module Function Ethernet Interface / Network Communication
Communication Standard IEEE 802.3u — 100BASE-TX
Transmission Speed 10 / 100 Mbps (auto-negotiation)
Physical Interface RJ-45 (8-pin modular jack)
Supported Protocols FINS, Modbus TCP, FTP, HTTP
Max. Simultaneous TCP Connections 16
IP Address Configuration Rotary switch or software (WideField3)
Backplane Power Draw 5 VDC / 0.8 A
Operating Temperature 0 °C to +55 °C
Storage Temperature −20 °C to +70 °C
Relative Humidity 10% – 90% RH (non-condensing)
Unit Weight Approx. 214 g
Mounting Any slot on FA-M3 base unit
Compatible CPUs FA-M3 F3SP□□ series CPU modules
Country of Origin Japan
Compliance CE (EMC 2014/30/EU), UL 508, RoHS, IEC 61131-2
Standard Lead Time (in-stock) Ships within 1–3 business days from Xiamen
Lead Time (sourced / out-of-stock) 7–21 business days depending on global channel availability
Warranty 12 months from date of shipment

Total Cost of Ownership (TCO) Analysis

Procurement teams evaluating the F3LE01-5T through a pure unit-price lens consistently underestimate the true cost exposure of a poorly managed sourcing strategy. A rigorous TCO framework must account for four cost categories that dwarf the module’s acquisition price.

Downtime Cost Exposure. In process manufacturing environments, unplanned downtime attributable to a failed or unavailable communication module typically runs between USD 5,000 and USD 50,000 per hour depending on the process. A 48-hour sourcing delay — common when relying on a single authorized distributor with no stock — translates directly into a six-figure operational loss. Maintaining a pre-qualified alternative supplier relationship with siemensplc.com eliminates this single-point-of-failure risk at zero incremental cost during normal operations.

CAPEX Reduction Through Targeted Replacement. The FA-M3 platform’s modular architecture means that a failed Ethernet interface does not require a full controller replacement. Sourcing a genuine F3LE01-5T as a targeted spare reduces capital expenditure compared to system-level upgrades. Our competitive pricing — typically 15–30% below list price on in-stock units — further compresses the CAPEX line without introducing quality risk.

OPEX Reduction Through Warranty Coverage. Every F3LE01-5T shipped from siemensplc.com carries a 12-month warranty covering manufacturing defects and functional failure under normal operating conditions. For maintenance teams managing dozens of FA-M3 nodes across a facility, this warranty coverage directly reduces the OPEX burden of unplanned repair labor, emergency freight, and expedited sourcing fees that accompany warranty-free grey-market purchases.

Inventory Carrying Cost Optimization. Rather than tying up capital in large safety-stock positions, procurement managers can leverage our confirmed availability and short lead times to operate leaner spare-parts inventories. Our real-time stock visibility and rapid quotation turnaround (typically within 4 business hours) support just-in-time MRO strategies without sacrificing supply chain resilience.

The net TCO advantage of sourcing through siemensplc.com versus spot-market or single-source procurement is not theoretical — it is measurable in reduced downtime exposure, lower acquisition cost, and eliminated warranty risk.

Quality & Compliance Assurance

Every unit of the YOKOGAWA F3LE01-5T supplied by siemensplc.com is subject to a documented pre-shipment verification process. We operate a 100% genuine product policy with zero tolerance for counterfeit, refurbished-as-new, or relabeled components. Our quality assurance protocol includes physical inspection of housing, label, and connector integrity; firmware version verification against YOKOGAWA’s published release matrix; functional power-on testing with an FA-M3 base unit; and anti-static packaging with humidity indicator cards.

All international shipments are processed through Xiamen Customs with full export compliance documentation — including commercial invoice, packing list, and certificate of origin where required. We support multi-currency payment settlement in USD, EUR, HKD, and CNY, accommodating the treasury and FX management requirements of multinational procurement departments. Letters of credit and TT wire transfer are both accepted for large-volume orders.

Traceability documentation is available upon request for OEM integrators, EPC contractors, and regulated-industry end users. We do not supply components through channels that cannot be documented.

Strategic Sourcing from Xiamen

Xiamen is one of China’s five original Special Economic Zones and home to Xiamen Gaoqi International Airport — a major cargo hub with direct freight connections to Hong Kong, Singapore, Tokyo, Dubai, Frankfurt, and Los Angeles. The Port of Xiamen ranks among the top 15 container ports globally by throughput volume, providing daily sea freight departures to all major industrial markets.

For industrial automation components, Xiamen’s logistics infrastructure translates into concrete procurement advantages. Air freight to Southeast Asia typically clears in 3–5 business days door-to-door. Express courier to Europe and North America averages 5–8 business days. Sea freight consolidation is available for large BOM orders where cost optimization outweighs speed requirements. Our in-house export team manages all customs documentation, HS code classification, and carrier coordination — removing administrative burden from the buyer’s procurement and logistics teams.

Our warehouse location within Xiamen’s bonded logistics zone enables pre-clearance processing for time-sensitive shipments, further compressing the gap between order confirmation and delivery at the buyer’s facility. For multinational corporations with regional distribution centers in Asia, we also support consolidated shipment to a single hub for onward internal distribution.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.