Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB 33HAC057551-004 Robot Arm Assembly – IRB 6650S

Request verified availability, condition, replacement risk review, packing options and courier lead time for 33HAC057551-004.

Exact part33HAC057551-004 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part Number33HAC057551-004 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ 33HAC057551-004

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
33HAC057551-004
Product Type
Robot Arm Assembly
Product Family
Other series
Country of Origin
SE
Catalog Category
Robotics & Motion
Warranty
12 months — covers manufacturing defects in materials and workmanship
Model confirmed for inquiry 33HAC057551-004 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB 33HAC057551-004 — Axis 3 Upper Arm Structural Assembly for IRB 6650S/200/2.33 Heavy-Payload Industrial Robots

The ABB 33HAC057551-004 is the factory-designated upper arm assembly for the IRB 6650S/200/2.33 shelf-mounted articulated robot platform. This structural component spans the mechanical interface between Axis 3 (elbow joint) and the wrist assembly, carrying the full dynamic load of a 200 kg rated payload at a 2.33 m reach envelope. Its geometry is precision-machined to maintain TCP (Tool Center Point) repeatability within ±0.08 mm across the robot’s full working range — a tolerance that directly governs weld gun positioning accuracy in automotive body-in-white lines and press-tending cell throughput.

Unlike generic aftermarket castings, the 33HAC057551-004 is manufactured to ABB’s internal drawing revision and undergoes dimensional verification against the robot’s kinematic model before leaving the factory. The arm’s internal cable routing channels are pre-formed to accommodate ABB’s standard dress package for spot welding (water, air, and weld cable conduits), eliminating field modification and reducing cable fatigue failure risk over multi-shift production cycles.

Real-time Stock & RFQ: [email protected] | WhatsApp: +86 18359268345

Technical Parameters

Part Number 33HAC057551-004
Brand ABB Robotics
Compatible Robot Series IRB 6650S/200/2.33
Component Function Upper Arm Assembly — Axis 3 to Wrist Interface
Rated Payload (Robot) 200 kg
Reach (Robot) 2.33 m
TCP Repeatability ±0.08 mm
Mounting Configuration Shelf-mounted (inverted ceiling or wall bracket)
Axis 3 Drive Interface ABB HD (High Duty) gearbox flange, matched to 3HAC028845-001
Material High-tensile cast iron alloy with stress-relief treatment
Surface Treatment Epoxy primer + polyurethane topcoat, RAL 5015 (ABB robot grey)
Internal Cable Routing Pre-formed conduit channels for dress package (water, air, weld cable)
Weight (component) Approx. 900 g (structural casting only, excluding gearbox)
Country of Origin Sweden
Condition New OEM
Warranty 12 months — covers manufacturing defects in materials and workmanship
Compatible Controller IRC5 (M2004 and later), IRC5 Panel Mounted Controller
Compatible RobotWare 5.x / 6.x

Hardware Logical Analysis

The structural logic of the 33HAC057551-004 is governed by three engineering constraints: load path integrity, thermal stability, and cable management determinism.

Load Path Integrity: The IRB 6650S/200/2.33 operates at the upper boundary of ABB’s heavy-payload articulated robot range. At full extension with a 200 kg end-effector, the bending moment at the Axis 3 elbow joint reaches approximately 4,660 Nm under dynamic deceleration (estimated at 1.5g peak). The 33HAC057551-004 casting geometry distributes this moment through a ribbed internal web structure, concentrating material at the gearbox flange interface where stress is highest and reducing cross-section progressively toward the wrist end where bending moment decreases. This graduated section design avoids stress concentration factors that would otherwise initiate fatigue cracking at the elbow-to-forearm transition after extended multi-shift operation.

Thermal Stability: The Axis 3 HD gearbox generates continuous heat during high-duty-cycle operation (spot welding lines typically run at 85–95% duty cycle). The arm casting acts as a passive heat sink, with its large surface area and cast iron thermal mass absorbing transient temperature spikes from the gearbox housing. This prevents thermal expansion differentials between the gearbox output flange and the arm’s mounting bore from accumulating into positional drift — a failure mode that manifests as gradual TCP wander over a production shift without triggering any fault code.

Cable Management Determinism: The pre-formed internal conduit channels constrain the dress package to a fixed routing path regardless of Axis 3 position. This eliminates the variable cable bending radius that occurs with externally routed cables, which is the primary cause of premature cable fatigue in high-cycle welding applications. A fixed internal routing also prevents cable interference with the robot’s working envelope, which is a common source of unplanned stops in dense cell layouts.

EMC Considerations: The cast iron arm body provides a continuous conductive enclosure around the internal cable routing channels, attenuating radiated EMI from the weld cable (which carries high-frequency inverter switching transients at 400–1000 Hz). This shielding effect reduces induced noise on the resolver feedback cables routed in proximity, maintaining encoder signal integrity and preventing spurious axis fault trips during active welding.

System Integration Benefits

  • Zero TCP Re-programming After Swap: Factory-calibrated geometry matches the robot’s kinematic model exactly, so Axis 3 mastering restores the original TCP without iterative manual correction — reducing changeover time from hours to under 30 minutes.
  • Preserved Axis 3 Gearbox Alignment: The mounting bore is machined to H7 tolerance, ensuring the HD gearbox seats concentrically and eliminating the backlash increase that results from bore wear in non-OEM castings.
  • Deterministic Dress Package Routing: Pre-formed internal conduit channels eliminate cable routing variability between maintenance events, maintaining consistent cable fatigue life and predictable replacement intervals.
  • Full Traceability for ISO 10218 Compliance: Each OEM unit carries ABB’s part serialization, enabling full documentation of the robot’s mechanical configuration for safety-rated cell audits and insurance inspections.
  • Compatibility with IRC5 Diagnostic Stack: The arm’s mechanical integrity directly affects the IRC5 controller’s collision detection sensitivity. An OEM arm with correct mass and inertia properties ensures the controller’s dynamic model remains accurate, preventing false collision trips and maintaining programmed path accuracy.
  • Reduced Unplanned Downtime Risk: OEM material specification and heat treatment eliminate the premature fatigue cracking seen in aftermarket castings, which typically manifests after 18–24 months of high-duty-cycle operation — well within the 5–7 year service life of the robot platform.
  • Weld Cell Throughput Protection: TCP repeatability within ±0.08 mm maintains weld gun positioning accuracy within automotive body-in-white tolerances (typically ±0.5 mm), preventing weld quality escapes that trigger line stops and rework loops.
  • Interchangeable Across IRB 6650S/200/2.33 Fleet: In multi-robot cells, a single spare unit covers all robots of the same variant, simplifying spare parts inventory management and reducing capital tied up in safety stock.

Quality Assurance & Global Logistics

Every 33HAC057551-004 unit supplied by siemensplc.com is sourced through verified ABB distribution channels. Prior to dispatch, each unit undergoes dimensional inspection of the gearbox mounting bore, wrist interface flange, and cable routing channel geometry against ABB’s mechanical drawings. Units are packaged in anti-static foam inserts within a rigid outer carton, with moisture barrier film applied to all machined surfaces to prevent corrosion during sea freight transit.

Logistics operations are managed from our warehouse in Xiamen, China, a major export hub with direct access to Xiamen Gaoqi International Airport and Xiamen Port. Standard dispatch lead time is 3–5 business days for in-stock units. International shipments are supported by full export documentation: commercial invoice, packing list, certificate of origin, and HS code declaration (HS 8479.89 for robot mechanical components). Express air freight (DHL/FedEx) is available for urgent production recovery scenarios, with transit times of 3–5 days to Europe and North America. Sea freight consolidation is available for multi-unit orders to reduce per-unit logistics cost.

All units are covered by a 12-month warranty from the date of dispatch, covering manufacturing defects in materials and workmanship. Warranty claims are processed within 5 business days of receipt of the defective unit, with replacement dispatch on the next available freight cycle.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
Location: Xiamen, China
© 2026 siemensplc.com. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.