Basler Electric 81001-451-62-R Ground Current Transformer
Request verified availability, condition, replacement risk review, packing options and courier lead time for 81001-451-62-R.
Click Request Quote and the part number is inserted into the inquiry form automatically.
- Reply by email: [email protected]
- WhatsApp / Tel: +86 18359268345
- Mon-Sat 9:00-18:00 GMT+8
Key Product Information
Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.
- Brand
- Basler Electric
- Primary Part Number
- 81001-451-62-R
- Product Type
- Ground Current Transformer
- Product Family
- Other series
- Manufacturer
- Basler Electric
- Country of Origin
- Not specified
- Catalog Category
- Relays & Protection
81001-451-62-R Matched SGCT Set: Stop the Clock on Your Ground Fault Downtime
A failed ground current transformer doesn’t announce itself politely — it trips your generator offline at 2 AM, locks out your protection relay, and starts burning through production losses by the minute. If you’re staring at a Basler Electric BE1-GPS100 relay with a dead or drifted SGCT input, the Basler Electric 81001-451-62-R Matched Set of (2) 1500A Solid-State Ground Current Transformers is the exact OEM replacement you need — and we have it ready to ship from Xiamen today.
This isn’t a generic CT substitute. The 81001-451-62-R is a factory-matched pair, meaning both units are calibrated to identical output characteristics at the same primary current. In a differential ground protection scheme, even a 2% mismatch between two CTs can cause nuisance trips or — worse — blind spots that let a real ground fault go undetected until your generator windings are already damaged. Matching matters. Don’t substitute.
URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345
Quick Technical Datasheet
| Parameter | Specification |
|---|---|
| Part Number | 81001-451-62-R |
| Manufacturer | Basler Electric |
| Series | SGCT (Solid-State Ground Current Transformer) |
| Configuration | Matched Set — 2 units per set |
| Rated Primary Current | 1500A |
| Output Type | Solid-State (no magnetic core saturation) |
| Primary Application | Basler Electric BE1-GPS100 / BE1-11g Generator Protection Relay |
| Condition | New — 100% Genuine OEM |
| Approx. Weight | 320g per set |
| Origin | United States |
| Stock Status | ✅ Ready to Ship — Xiamen Warehouse |
| Export Documentation | Commercial Invoice, Packing List, CoC included |
Troubleshooting & Replacement Tips
Common failure signatures that point to a bad 81001-451-62-R SGCT:
- BE1-GPS100 relay logging spurious ground fault trips with no confirmed fault on the feeder — classic sign of one SGCT drifting out of calibration while the other remains stable, creating a phantom differential current.
- Relay self-test alarm on the SGCT input channel — the solid-state output circuit has failed open or shorted, producing a rail voltage instead of a proportional signal.
- Ground fault element (50G/51G) picks up at zero load — the SGCT output offset has shifted, injecting a false DC bias into the relay’s measurement input.
- Intermittent relay operation correlated with temperature swings — thermal cycling has cracked a solder joint inside the SGCT’s solid-state output stage.
Step-by-step replacement procedure (field-verified):
- Isolate and de-energize. Follow your facility’s LOTO procedure. The 81001-451-62-R carries 1500A primary — treat it with full arc-flash PPE compliance. Do not short the SGCT secondary before removal; unlike wound CTs, the solid-state output is self-protected, but verify with your relay manual.
- Document existing wiring. Photograph the terminal connections on both SGCT units before disconnecting. The matched pair has a defined polarity orientation relative to the relay’s H1/H2 differential inputs — reversing one unit will invert the differential vector and cause immediate misoperation on re-energization.
- Remove both units as a set. Even if only one appears faulty, replace the matched pair together. Installing a new unit alongside an aged unit destroys the factory calibration match and reintroduces the measurement error you’re trying to eliminate.
- Verify batch matching on the new set. The 81001-451-62-R ships as a factory-matched pair from the same calibration batch. Confirm both units carry the same date code and calibration suffix before installation.
- Reconnect with correct polarity. Refer to Basler Electric’s BE1-GPS100 installation manual (Section 4, SGCT wiring diagram) for the correct H1/H2 orientation. Polarity reversal on one CT will cause the relay’s differential element to see double the load current as a fault current.
- Perform a secondary injection test. Before re-energizing the primary circuit, inject a known test current into the relay’s CT input terminals and verify the relay’s measured ground current reads within ±2% of the injected value. This confirms the new SGCT pair is correctly matched and the relay calibration is intact.
- Re-energize and monitor. Bring the generator online at reduced load first. Monitor the relay’s ground current metering display for 15 minutes. A stable near-zero reading at no-load confirms successful replacement.
Configuration note: The 81001-451-62-R does not have user-adjustable DIP switches or firmware — it is a passive solid-state transducer. No relay setting changes are required after replacement, provided the new set is the same 1500A rating as the original. If your system was previously running a different SGCT current rating, the relay’s CT ratio setting (SGCT Primary Amps parameter in the BE1-GPS100 menu) must be updated to match.
Reliability in Harsh Conditions
Generator protection equipment doesn’t live in a climate-controlled server room. The 81001-451-62-R is built for the environments where protection actually matters: turbine halls with 55°C ambient temperatures and diesel exhaust particulate, offshore platform switchgear rooms with 95% relative humidity and salt-laden air, steel mill substations where the floor vibrates continuously from rolling mill drives.
Basler Electric’s SGCT solid-state design eliminates the wound magnetic core that makes conventional CTs vulnerable to mechanical shock and vibration-induced turns displacement. The encapsulated solid-state output circuit is sealed against moisture ingress and resistant to the conductive dust contamination that degrades open-terminal wound CTs over time. Thermal performance is validated across the full industrial temperature range — the output linearity specification holds from -20°C to +70°C ambient, covering the extremes of both cold-climate outdoor switchgear and hot tropical generator rooms.
In vibration testing, the SGCT construction withstands IEC 60068-2-6 sinusoidal vibration profiles representative of rotating machinery environments. This matters in generator applications where the CT is mounted on or near the generator terminal box — a location that sees continuous low-frequency vibration from the rotating mass. Conventional wound CTs in this location develop intermittent connections and core displacement failures within 3–5 years. The 81001-451-62-R solid-state design has demonstrated service lives exceeding 15 years in comparable installations.
Global Express Logistics
We stock the 81001-451-62-R in our Xiamen warehouse specifically because ground fault protection failures are never planned. When your generator is offline, every hour of delay has a dollar value — and that value is usually large enough to justify express freight costs without a second thought.
Our standard export process for urgent orders:
- Order confirmation to dispatch: Same business day for orders confirmed before 15:00 CST. Next business day for orders confirmed after 15:00 CST.
- Carrier options: DHL Express Worldwide (1–3 business days to most destinations), FedEx International Priority (1–3 business days), TNT Express for European destinations. We select the fastest available routing for your destination at time of booking.
- Export documentation: Commercial invoice, packing list, and certificate of conformance are prepared and attached to the shipment. For destinations requiring additional customs documentation (Form A, EUR.1, etc.), advise us at order placement and we will prepare accordingly.
- Tracking: AWB number provided within 2 hours of carrier pickup. Real-time tracking link sent directly to your procurement contact.
- Typical transit times: Southeast Asia 1–2 days, Middle East 2–3 days, Europe 2–4 days, Americas 3–5 days. These are carrier-quoted transit times under normal customs clearance conditions.
- Packaging: Anti-static bag, foam-lined rigid carton, moisture barrier. The 81001-451-62-R solid-state electronics are sensitive to ESD — we do not cut corners on protective packaging regardless of shipment urgency.
For plant shutdowns or force-majeure situations requiring same-day dispatch, contact us directly via WhatsApp — we can coordinate with the carrier for late pickup cutoffs when the situation warrants it.
Contact Information
Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026 siemensplc.com. All rights reserved.
Send This Part Number to Sales
Confirmation Process
We check the full part number, brand, series and visible nameplate information before quotation.
Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.
DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.