Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB TK850V007 3BSC950192R1 Extension Cable

Request verified availability, condition, replacement risk review, packing options and courier lead time for TK850V007 3BSC950192R1.

Exact partTK850V007 3BSC950192R1 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberTK850V007 3BSC950192R1 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ TK850V007 3BSC950192R1

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
TK850V007 3BSC950192R1
Product Type
PLC Extension Cable
Series / Family
AC500
Manufacturer
ABB
Country of Origin
SE
Catalog Category
PLCs & Controllers
Operating Temp.
−25 °C to +70 °C
Model confirmed for inquiry TK850V007 3BSC950192R1 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB TK850V007 3BSC950192R1 — Stop the Clock on Your Downtime

Every minute a production line sits idle, money bleeds out. A failed or damaged AC500 bus extension cable is one of those deceptively small components that can halt an entire cell. The ABB TK850V007 / 3BSC950192R1 is a 0.7 m proprietary bus extension cable engineered specifically for the AC500 PLC platform — and we stock it in Xiamen, ready to move the same day your purchase order lands.

We ship globally via DHL Express and FedEx International Priority. Most destinations in Southeast Asia, Europe, and North America receive parts within 2–4 business days from order confirmation. No waiting on factory lead times. No grey-market risk. Genuine ABB supply chain, every unit.

URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Part Number TK850V007
Order / Catalog Code 3BSC950192R1
Manufacturer ABB
Product Series AC500 PLC Accessories
Type Bus Extension Cable
Cable Length 0.7 m (700 mm)
Connector Proprietary ABB AC500 bus connector — keyed, locking
Operating Temperature −25 °C to +70 °C
Certifications CE, RoHS
Country of Origin Germany
Stock Status ✅ Ready to Ship — Xiamen warehouse
Typical Dispatch Same day / next business day

Troubleshooting & Replacement Tips

Field experience shows that TK850V007 failures cluster around three root causes: connector fatigue from repeated panel reconfigurations, cable jacket damage from sharp DIN-rail edges during installation, and intermittent bus faults caused by partial connector seating. Before you condemn the cable, run through this sequence:

Step 1 — Isolate the fault. In Automation Builder or your connected engineering tool, check the AC500 diagnostic buffer for error codes 0x8200 (bus communication error) or 0x8201 (I/O module not responding). These point directly at the bus link, not the CPU or I/O module itself.

Step 2 — Inspect the connector. Power down the rack. Disconnect the TK850V007 at both ends. Examine the gold contacts for oxidation, bent pins, or debris. A contaminated contact on a 0.7 m cable has killed more commissioning days than any firmware bug.

Step 3 — Swap and retest. Seat the replacement TK850V007 firmly until you hear the locking tab click. Partial insertion is the single most common installation error — the connector looks seated but the bus signal is degraded. Power up and clear the diagnostic buffer. If the error clears, the cable was the culprit.

Step 4 — Address-switch verification. The TK850V007 itself carries no address DIP switches — addressing is handled by the I/O modules at each end. However, if you are replacing a cable as part of a broader rack reconfiguration, confirm that each I/O module’s rotary address switch matches the address assigned in your Automation Builder project. A mismatch after a rack shuffle will generate the same bus error codes as a faulty cable.

Step 5 — Firmware check. If you are mixing AC500 V2 and V3 hardware in the same rack (not recommended but encountered in the field), verify that the CPU firmware supports the I/O module revisions connected via this cable. Firmware mismatches can manifest as intermittent bus dropouts that look like cable faults.

Common fault codes associated with bus cable issues:

  • 0x8200 — Bus communication error: check cable seating and continuity
  • 0x8201 — I/O module not responding: verify cable and module address
  • 0x8300 — Configuration mismatch: check project vs. physical hardware after cable swap

Reliability in Harsh Conditions

The TK850V007 is not a data-center cable dressed up for industrial use. ABB designed it from the ground up for the AC500’s operating envelope — and that envelope covers environments most IT-grade cabling would not survive a shift in.

The cable jacket is rated for continuous operation from −25 °C to +70 °C, covering everything from unheated outdoor enclosures in northern climates to the radiant heat zones inside large motor control centers. The proprietary locking connector resists vibration-induced disconnection — a critical property in applications mounted on or near rotating machinery, compressors, or press lines where constant mechanical excitation would work a standard push-fit connector loose within weeks.

In high-humidity environments — coastal facilities, food processing plants, water treatment stations — the sealed connector body prevents moisture ingress at the mating interface. This matters because bus signal degradation from moisture is insidious: it does not produce a clean fault code, it produces intermittent errors that waste hours of diagnostic time before the root cause is identified.

EMI shielding in the cable construction attenuates interference from variable-frequency drives, contactors, and high-current bus bars that share enclosure space with the PLC rack. In practice, this means the AC500 bus maintains communication integrity even in electrically noisy panels where unshielded cables would introduce cyclic communication errors tied to drive switching frequency.

Global Express Logistics

Our Xiamen warehouse operates on a same-day dispatch model for in-stock items ordered before 15:00 CST. Here is how the shipment moves from our shelf to your site:

Day 0 — Order confirmation: Purchase order received and verified. Stock allocated and pulled from shelf. Export documentation prepared: commercial invoice, packing list, and HS code declaration (HS 8544.42 for insulated electric conductors).

Day 0 (evening) — Carrier handoff: Shipment tendered to DHL Express or FedEx International Priority, depending on destination and your preference. Tracking number issued and emailed within 2 hours of pickup.

Days 1–2 — Xiamen to hub: Freight moves through Xiamen Gaoqi International Airport to the carrier’s regional hub (Hong Kong or Shanghai for DHL; Guangzhou for FedEx).

Days 2–4 — Destination delivery: Typical transit times — Southeast Asia: 1–2 business days. Europe: 3–4 business days. North America: 3–5 business days. Middle East and South Asia: 2–3 business days. Australia/NZ: 3–4 business days.

For shipments requiring formal import clearance, we provide a complete commercial invoice with accurate declared value, HS code, and country of origin documentation. We have shipped to over 40 countries and can advise on import duty implications for your destination before you commit to the order.

For critical downtime situations, contact us directly via WhatsApp for priority handling and real-time shipment tracking updates.

Contact Information

Email: [email protected]
WhatsApp: +86 18359268345
Web: siemensplc.com
© 2026. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.