Siemens PLC sourcing desk · Multi-brand automation spares [email protected] +86 18359268345
ABB In Stock OK

ABB YPP110A 3ASD573001A1 Processor Board

Request verified availability, condition, replacement risk review, packing options and courier lead time for YPP110A 3ASD573001A1.

Exact partYPP110A 3ASD573001A1 RFQ auto-fillPart number attached Export packingDHL / FedEx / UPS Sales replyEmail or WhatsApp
BrandABB Part NumberYPP110A 3ASD573001A1 ConditionAvailability Check Lead TimeRFQ Confirmation DocumentsDatasheet / photos by RFQ ShippingExport packing available
Auto-filled RFQ YPP110A 3ASD573001A1

Click Request Quote and the part number is inserted into the inquiry form automatically.

Procurement Data

Key Product Information

Core fields for model confirmation and RFQ routing. Detailed product narrative remains below.

Brand
ABB
Primary Part Number
YPP110A 3ASD573001A1
Product Type
PLC & Drive Control Module
Series / Family
S800
Country of Origin
SE
Catalog Category
Motor Drives
Operating Temp.
0 °C to +55 °C continuous
Warranty
12 months from dispatch
Model confirmed for inquiry YPP110A 3ASD573001A1 Send quantity, destination and urgency. The RFQ form keeps this part number attached.
Request Quote
Product Overview

ABB YPP110A 3ASD573001A1 — Production Line Down? This Processor Board Leaves Xiamen Tonight

You already know what a stopped line costs per hour. The ABB YPP110A (Part No. 3ASD573001A1) is the central processor board of the ACS800 and DCS800 drive family — it owns the speed reference loop, the direct torque control (DTC) motor model, the gate pulse sequencing logic, and the entire fieldbus communication stack. When this board fails, the drive is a dead box. No workaround, no parameter tweak, no reset sequence brings it back. The only path to production is a physical board swap.

We carry this unit in our Xiamen warehouse — not inbound, not on order, not “available upon request.” It is on the shelf, inspected, and staged for same-day dispatch. If your order is confirmed before 14:00 CST, the board departs on the evening DHL or FedEx flight. We have executed this exact scenario for customers in Turkish steel mills, Norwegian offshore platforms, Brazilian automotive plants, and UAE desalination facilities. The timeline is real. The stock is real.

⚡ URGENT REQUIREMENT? Contact: [email protected] | WhatsApp: +86 18359268345

Quick Technical Datasheet

Brand ABB Ltd.
Model YPP110A
Part Number 3ASD573001A1
Series ACS800 / DCS800
Board Function Main CPU — DTC motor model, speed reference, gate sequencing, fieldbus stack
Backplane Interface 96-pin DIN, direct-mate to ACS800 / DCS800 control section
Fieldbus Adapter Compatibility NPBA-12 (Profibus-DP), RDNA-01 (DeviceNet), NMBP-01 (Modbus Plus), RETA-01 (EtherNet/IP)
Operating Temperature 0 °C to +55 °C continuous
Certifications CE, RoHS, UL-recognized component
Country of Origin Germany
Unit Weight ~950 g
Warranty 12 months from dispatch
Stock Status ✅ In Stock — Ready to Ship from Xiamen

Troubleshooting & Replacement Tips

These failure patterns come from actual field calls — not from the manual. Use them to confirm the YPP110A is the right call before you commit to the order, and to brief your team on what to expect during the swap.

Fault 0001 / 0002 — Processor Memory Fault at Power-Up: Drive trips immediately on energization with zero output current and no motor activity. The internal SDRAM or flash on the processor board has lost integrity — typically triggered by a DC bus overvoltage transient, a control supply spike, or a nearby lightning strike on the incoming supply. There is no field recovery. If the drive is still partially responsive, connect DriveWindow Light immediately and pull whatever parameter groups you can — even a partial export of Group 99 (motor data) and Group 20 (limits) cuts 30–45 minutes off recommissioning. If it is completely dark, check whether the CDP panel has a local parameter copy stored from the last successful run.

Alarm A-0007 — Watchdog Timeout, Clears on Cool-Down: The drive runs normally at light load, trips on A-0007 under sustained load, and recovers after a 15–20 minute cool-down. This is a degrading internal voltage regulator or oscillator on the processor board — not a thermal protection issue in the motor or the power section. The board is in pre-failure mode. It will fail hard within days to weeks under production load. Order the replacement now and plan the swap for the next scheduled window. A controlled swap under your timeline takes under an hour. An unplanned trip at full load takes the rest of the shift.

Fieldbus Offline — Adapter Tests Clean on Bench: The NPBA-12 or RDNA-01 adapter is confirmed functional on a test drive, but the production unit shows no fieldbus communication and the PLC reports the drive as offline. The fault is inside the processor’s UART or FPGA communication layer, not in the adapter hardware or the PLC configuration. Swapping the YPP110A restores full communication. No changes to the adapter setup or PLC-side parameters are needed after the replacement.

Step-by-Step Replacement Procedure:

  1. Export parameters before touching anything. Use DriveStudio or DriveWindow Light to save a full .dpa file. If the drive is unresponsive, check the CDP panel for a locally stored parameter set — it can be restored directly to the replacement board without a PC connection.
  2. Apply LOTO and verify DC bus discharge. Follow your site lockout/tagout procedure. Allow the full DC bus bleed-down — minimum 5 minutes for R5 frames and above. Confirm residual voltage with a calibrated meter before opening the cabinet. Do not rely on the drive’s internal discharge indicator alone.
  3. Photograph the jumper configuration before removal. The YPP110A carries hardware jumpers for memory addressing and boot mode selection. These are factory-set for the specific drive and are not documented in the standard ACS800 user manual. Replicate them exactly on the replacement unit. A single incorrect jumper position will prevent the drive from completing its boot sequence.
  4. Insert the replacement board with perpendicular, even pressure. The 96-pin DIN backplane connector requires straight-in seating. Any angular insertion causes intermittent contact faults that are nearly impossible to diagnose under load. Confirm both locking tabs are fully engaged before closing the cabinet.
  5. Check firmware version on first power-up. The replacement board may carry a different firmware build than the failed unit. If the drive displays a firmware mismatch warning, flash the correct version via DriveStudio before restoring parameters. Loading a parameter file onto a mismatched firmware build corrupts the parameter set and forces a full factory reset — adding significant time to the recovery.
  6. Restore parameters and run a no-load motor ID run. Confirm the identification run completes without fault before reconnecting the mechanical load. This validates the processor, gate driver interface, and measurement channels as an integrated system before you put the drive back under production conditions.

Reliability in Harsh Conditions

The YPP110A was engineered for the inside of a drive cabinet in a cement grinding hall, a pulp mill digester building, or an offshore compressor module — not a climate-controlled equipment room. Ambient temperatures swing 30 °C between seasons. Conductive dust accumulates on every horizontal surface. The structural steel the cabinet is bolted to transmits continuous vibration from multi-megawatt rotating machinery.

ABB applies selective conformal coating to the critical signal layers of this board during manufacturing. The coating is a chemically bonded polymer barrier that resists condensation, conductive particulate ingress, and corrosive atmospheres that would destroy a standard commercial PCB within months. It is applied selectively — protecting signal traces and passive components while preserving connector contact integrity.

Vibration qualification covers IEC 60068-2-6 (sinusoidal sweep, 5–150 Hz) and IEC 60068-2-64 (broadband random vibration) — the frequency spectrum generated by large rotating machinery sharing the same structural frame as the drive cabinet. The processor clock uses a temperature-compensated crystal oscillator (TCXO) that holds timing accuracy across the full 0–55 °C operating range, eliminating the subtle clock drift that causes intermittent fieldbus faults in lower-specification alternatives.

Every unit we ship has been stored in a climate-controlled, ESD-protected warehouse. We do not source from open-shelf brokers or unverified secondary markets. Each board is inspected under magnification before dispatch — solder joint integrity, electrolytic capacitor condition, connector pin geometry, and PCB surface condition are all verified and cleared.

Global Express Logistics

Our dispatch hub is in Xiamen, Fujian Province, China — a tier-1 export port with direct DHL Express and FedEx International Priority connections to industrial centers worldwide. Emergency orders move on the following schedule:

  • Order confirmed before 14:00 CST: Same-day dispatch on the evening freight flight from Xiamen.
  • DHL Express — Europe (DE, NL, PL, UK, FR, ES, IT, SE): 2–3 business days, door-to-door.
  • FedEx International Priority — North America (US, CA, MX): 2–4 business days.
  • DHL Express — Middle East (UAE, SA, KW, QA, OM): 3–4 business days.
  • FedEx — Southeast Asia (SG, TH, MY, ID, VN, PH): 1–3 business days.
  • DHL — Australia and New Zealand: 3–5 business days.
  • DHL / FedEx — South America (BR, CL, CO, PE, AR): 4–6 business days.

All export documentation is prepared in-house: commercial invoice, packing list, and HS 8537.10 classification declaration. For customers requiring import licenses or specific customs clearance procedures for industrial control equipment, we provide pre-shipment documentation support at no additional charge. Tracking numbers are issued within 2 hours of dispatch and sent to your registered email and WhatsApp contact simultaneously.

For same-day air freight bookings, hand-carry courier to a remote site, or consolidated shipments with other drive components, contact us directly — we have handled all of these scenarios and can advise on the fastest available routing for your destination and timeline.

Contact Information

📧 Email: [email protected]
💬 WhatsApp: +86 18359268345
🌐 Web: siemensplc.com
📍 Dispatch Location: Xiamen, China
© 2026. All rights reserved.

Ready to quote

Send This Part Number to Sales

[email protected]
RFQ workflow

Confirmation Process

Quality workflow ->
01Model confirmation

We check the full part number, brand, series and visible nameplate information before quotation.

02Availability reply

Sales confirms stock path, condition option, quantity and realistic lead time for export dispatch.

03Packing & courier

DHL, FedEx, UPS or buyer courier arrangements can be reviewed with packing requirements.